Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
| No. | Decision name | Certification period |
|---|---|---|
| 1 | Certificate 238/GCN-BXD | June 19, 2023 |
| 2 | Certificate 235/GCN-BXD | September 29, 2020 |
| 3 | Certificate 1280/GCN-BXD. | October 2, 2019 |
This lab belongs to the contractor. The results of data analysis for contractor UTT CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 79 bidding packages, of which 73 were won, 6 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 17.05% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.19% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (12), Hưng Yên (6), Phú Thọ (5), Nghệ An (5), Thái Nguyên (3), Lào Cai (3), Ninh Bình (3), Thanh Hoá (3), Sơn La (2), Đắk Lắk (2), Cần Thơ (2), Bắc Ninh (2), Quảng Ngãi (1), Hà Tĩnh (1), Gia Lai (1), Khánh Hòa (1), Đồng Nai (1), Cà Mau (1), An Giang (1), Lai Châu (1), Cao Bằng (1), Undefined (31)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (12), Nghệ An (5), Hưng Yên (5), Thanh Hoá (3), Sơn La (2), Yên Bái (2), Phú Thọ (2), Bắc Giang (2), Hà Nam (2), Quảng Ngãi (1), Thái Nguyên (1), Hà Tĩnh (1), Gia Lai (1), Phú Yên (1), Khánh Hòa (1), Đắk Lắk (1), Đồng Nai (1), Hậu Giang (1), Bạc Liêu (1), Kiên Giang (1), Cà Mau (1), Lào Cai (1), Lai Châu (1), Cao Bằng (1), Sóc Trăng (1), Undefined (34)
- Has relationships with 28 Bid Solicitors
- Has relationships with 33 Bid Investors
- Has competed against 21 contractors in 15 bidding packages, won 9 packages, lost 6 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 16 contractors in 18 bidding packages, won 18 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 18 bidding packages with 9 roles.