Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED as follows:
- Has relationships with 0 bid solicitors.
- Has relationships with 10 contractors.
- Announced 5 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project
- Has invited bids for 17 packages (with 20 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 18 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 30.00%, Construction 25.00%, Consultancy 20.00%, Non-consultancy 25.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 85,076,154,700 VND, of which the total winning bid value is: 66,165,914,000 VND.
- The savings rate is: 22.23%.
Data analysis results of DauThau.info software for project owners 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED as follows:
- Has relationships with 10 contractors.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 30.00%, Construction 25.00%, Consulting 20.00%, Non-consulting 25.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 85,076,154,700 VND, in which the total winning value is: 66,165,914,000 VND.
- The savings rate is: 22.23%.
You need to Login or Sign up to view all informations.
- Participated in 10 bidding packages, of which 10 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 33.04% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.76% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Undefined (10)
- Provinces before the merger where the contractor has participated in bidding : Undefined (10)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Name of construction organization: Công ty TNHH Kiểm định và tư vấn Xây dựng 3T
- Code of capacity certificate of construction activities: 00020497
- Issuer: Sở Kế hoạch và Đầu tư Đồng Nai
- Fields:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: dân dụng
⚬ Giám sát công tác xây dựng công trình: dân dụng
⚬ Quản lý dự án đầu tư xây dựng: dân dụng
⚬ Quản lý dự án đầu tư xây dựng: NN&PTNT
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED Posted Development Investment Project Improving the capacity of forest fire prevention and fighting for the forest rangers of Dong Nai province in the period 2016 - 2020 (phase 1).
13/06/2022 08:08
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED Posted Development Investment Project Invest in building houses for 6 companies under TTG22 Brigade / 4th Army Corps.
07/10/2019 15:15
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED Posted Development Investment Project Forestry development by Tan Phu Protection Forest Management Board, period 2016-2020.
17/04/2019 10:10
The Bid solicitor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED has posted the results of the bidding package Package 42: Maintenance and repair of electric fences of the investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED.
08/01/2019 13:59
The Bid solicitor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED has posted the results of the bidding package Package 18 (Construction): Additional construction of water pans and mineral salt storage points of the investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED.
08/01/2019 13:43
Bid solicitor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED has posted Tender Notice Package 18 (Construction): Additional construction of water pans and mineral salt storage points of the investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED with the form National Competitive Bidding.
14/12/2018 14:18
Bid solicitor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED has posted Tender Notice Package 42: Maintenance and repair of electric fences of the investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED with the form National competitive bidding.
03/12/2018 18:11
Bid solicitor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED has posted Tender Notice Package 42: Maintenance and repair of electric fences of the investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED with the form National competitive bidding.
03/12/2018 12:59
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED Posted Development Investment Project Invest in building houses for 6 companies under TTG22 Brigade / 4th Army Corps.
04/07/2018 18:18
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED Posted Development Investment Project Investment in construction of Housing 6 Companies under TTG22 Brigade / 4th Army Corps.
17/04/2018 09:09
The data sheet has been partially hidden, to see the full information please Login or Register
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED publishes the plan Contractor selection plan (continued) Project on Capacity building for forest fire prevention and fighting for Dong Nai forest rangers for the period 2016 - 2020 (phase 1) with 6 bidding package .
13/06/2022 09:13
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED announced the results of the bidding package Package 01: Topographical survey of electric fence with 1 participating contractors .
14/08/2020 10:46
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED publishes Tender Notice Package 01: Topographical survey of electric fence in the form National competitive bidding .
29/06/2020 10:33
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED publishes the plan Contractor selection plan Investment project to build a number of subsequent items to supplement the emergency project of elephant conservation in Dong Nai province in the period 2014-2020 with 11 bidding package .
26/06/2020 16:17
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED publishes Tender Notice TbB-01: Supply of equipment in the form National Competitive Bidding .
07/10/2019 17:02
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED publishes the plan Invest in building houses for 6 companies under TTG22 Brigade / 4th Army Corps with 1 bidding package .
07/10/2019 15:49
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED publishes the plan Invest in building houses for 6 companies under TTG22 Brigade / 4th Army Corps with 1 bidding package .
07/10/2019 15:30
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED publishes the plan Approval of design and estimate for planting mangrove protection forests in 2019 of Long Thanh Protection Forest Management Board with 6 bidding package .
28/06/2019 17:58
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED publishes Tender Notice Tender package No 01 (construction): Construction of afforestation and planting care in 2019, 2020, 2021 (including general costs) in the form National Competitive Bidding .
22/06/2019 15:03
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED publishes the plan Approving the contractor selection plan for the design project, the estimate for planting and taking care of Chua Chan mountain protection forest in 2019 with 4 bidding package .
22/06/2019 14:45
The data sheet has been partially hidden, to see the full information please Login or Register
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED Posted Development Investment Project Improving the capacity of forest fire prevention and fighting for the forest rangers of Dong Nai province in the period 2016 - 2020 (phase 1).
13/06/2022 08:08
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED Posted Development Investment Project Invest in building houses for 6 companies under TTG22 Brigade / 4th Army Corps.
07/10/2019 15:15
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED Posted Development Investment Project Forestry development by Tan Phu Protection Forest Management Board, period 2016-2020.
17/04/2019 10:10
The Bid solicitor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED has posted the results of the bidding package Package 42: Maintenance and repair of electric fences of the investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED.
08/01/2019 13:59
The Bid solicitor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED has posted the results of the bidding package Package 18 (Construction): Additional construction of water pans and mineral salt storage points of the investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED.
08/01/2019 13:43
Bid solicitor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED has posted Tender Notice Package 18 (Construction): Additional construction of water pans and mineral salt storage points of the investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED with the form National Competitive Bidding.
14/12/2018 14:18
Bid solicitor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED has posted Tender Notice Package 42: Maintenance and repair of electric fences of the investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED with the form National competitive bidding.
03/12/2018 18:11
Bid solicitor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED has posted Tender Notice Package 42: Maintenance and repair of electric fences of the investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED with the form National competitive bidding.
03/12/2018 12:59
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED Posted Development Investment Project Invest in building houses for 6 companies under TTG22 Brigade / 4th Army Corps.
04/07/2018 18:18
3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED Posted Development Investment Project Investment in construction of Housing 6 Companies under TTG22 Brigade / 4th Army Corps.
17/04/2018 09:09
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED is the investor of 5 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED is the investor of 20 package, of which 15 package is self-invited, other units invite bid 5 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED is the owner of 18 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor 3T VERIFICATION AND CONSTRUCTION CONSULTANT COMPANY LIMITED is an investor with 10 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.