Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Campus Management Center as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 34 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 30 contractor selection plans with a total of 80 bidding packages, of which 30 prequalification documents have not found the investment project
- Has invited bids for 25 packages (with 25 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 53 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 28 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 40 packages that have not fully posted the contractor selection results. Of these 40 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.28 contractors.
- Breakdown by bidding field: Goods 0%, Construction 36.00%, Consultancy 8.00%, Non-consultancy 56.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 87,587,271,348 VND, of which the total winning bid value is: 85,919,431,159 VND.
- The savings rate is: 1.90%.
Data analysis results of DauThau.info software for project owners Campus Management Center as follows:
- Has relationships with 34 contractors.
- The average number of contractors participating in each bidding package is: 2.28 contractors.
- Proportion of bidding fields: Goods 0%, Construction 36.00%, Consulting 8.00%, Non-consulting 56.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 87,587,271,348 VND, in which the total winning value is: 85,919,431,159 VND.
- The savings rate is: 1.90%.
You need to Login or Sign up to view all informations.
- Participated in 1 bidding packages, of which 1 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (1)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (1)
- Has relationships with 0 Bid Solicitors
- Has relationships with 1 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Campus Management Center has posted the results of the bidding package Landscape decoration of Hanoi National University urban area in Hoa Lac in 2026 of the investor Campus Management Center.
- Winning bidder: GOLDEN BEE GENERAL SERVICES TRADE COMPANY LIMITED
10/07/2026 15:34
The Bid solicitor Campus Management Center has posted the results of the bidding package Construction of the investor Campus Management Center.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ PHÁT TRIỂN XÂY DỰNG TRƯỜNG THỊNH
04/07/2026 17:09
Bid solicitor Campus Management Center has posted Tender Notice Landscape decoration of Hanoi National University urban area in Hoa Lac in 2026 of the investor Campus Management Center with the form Open bidding.
26/06/2026 15:54
The Bid solicitor Campus Management Center has posted the request Plan to select contractors to carry out the task of "decorating the landscape of Hanoi National University urban area in Hoa Lac in 2026" of the investor Campus Management Center with 3 bidding package.
25/06/2026 16:44
Bid solicitor Campus Management Center has posted Tender Notice Construction of the investor Campus Management Center with the form Open bidding.
09/06/2026 18:27
The Bid solicitor Campus Management Center has posted the request Plan to select contractors for the project of Construction of a cafeteria to ensure essential conditions to serve officials, lecturers, pupils and students staying at Ba Vi campus of the investor Campus Management Center with 4 bidding package.
29/05/2026 17:32
The Bid solicitor Campus Management Center has posted the results of the bidding package Management and operation of 595ha area under investment project 3 to build VNU in Hoa Lac of the investor Campus Management Center.
- Winning bidder: GOLDEN BEE GENERAL SERVICES TRADE COMPANY LIMITED
27/05/2026 16:17
Bid solicitor Campus Management Center has posted Tender Notice Management and operation of 595ha area under investment project 3 to build VNU in Hoa Lac of the investor Campus Management Center with the form Open bidding.
12/05/2026 16:36
The Bid solicitor Campus Management Center has posted the results of the bidding package Evaluation of bidding documents, Evaluation of contractor selection results of the investor Campus Management Center.
- Winning bidder: CÔNG TY TNHH TRUYỀN THÔNG VÀ CÔNG NGHỆ MVC
07/05/2026 11:51
The Bid solicitor Campus Management Center has posted the results of the bidding package Prepare and Evaluate Tender documents of the investor Campus Management Center.
- Winning bidder: MTA TRADING AND TECHNOLOGY CONSULTING JOINT STOCK COMPANY
07/05/2026 11:43
The data sheet has been partially hidden, to see the full information please Login or Register
Campus Management Center announced the results of the bid package Construction .
- Winning bidder: NHAT MINH CONSTRUCTION AND CONSULTANT INVESTMENT JOINT STOCK COMPANY
11/07/2025 09:16
Campus Management Center announced the results of the bidding package Construction with 1 participating contractors .
03/07/2025 10:03
Campus Management Center publishes Tender Notice Construction in the form Open bidding .
23/06/2025 16:42
Campus Management Center publishes the plan Contractor selection plan (phase 1) The project "Improving the background yard and planting landscape and shade for the parking area at HT1, HT2 of VNU project area in Hoa Lac" with 4 bidding package .
06/06/2025 11:22
Campus Management Center announced the results of the bid package Management and operation of the 595ha area of the VNU construction investment project in Hoa Lac .
- Winning bidder: CÔNG TY TNHH KEY SIGNAL, GOLDEN BEE GENERAL SERVICES TRADE COMPANY LIMITED
29/05/2025 15:18
Campus Management Center publishes the plan The plan to select the construction contractor "Building the roof of the parking lot of the dormitory of QG-HN04 and the guest house of Hanoi National University" with 4 bidding package .
27/05/2025 13:51
Campus Management Center announced the results of the bid package Management, operation, repair of works and buildings in 2025 - 2027 .
- Winning bidder: CÔNG TY TNHH KEY SIGNAL, GOLDEN BEE GENERAL SERVICES TRADE COMPANY LIMITED
26/05/2025 15:50
Campus Management Center announced the results of the bid package Operating the dormitory of VNU guest houses and dormitory in QG-HN04 in 2025-2027 .
- Winning bidder: CÔNG TY TNHH KEY SIGNAL, GOLDEN BEE GENERAL SERVICES TRADE COMPANY LIMITED
23/05/2025 16:52
Campus Management Center publishes the plan Contractor selection plan (phase 1) The repair and waterproofing works of corrugated iron C, and repair yard and walking road in VNU guest house in Ba Vi with 3 bidding package .
21/05/2025 16:26
Campus Management Center announced the results of the bidding package Management and operation of the 595ha area of the VNU construction investment project in Hoa Lac with 1 participating contractors .
21/05/2025 10:00
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Campus Management Center has posted the results of the bidding package Landscape decoration of Hanoi National University urban area in Hoa Lac in 2026 of the investor Campus Management Center.
- Winning bidder: GOLDEN BEE GENERAL SERVICES TRADE COMPANY LIMITED
10/07/2026 15:34
The Bid solicitor Campus Management Center has posted the results of the bidding package Construction of the investor Campus Management Center.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ PHÁT TRIỂN XÂY DỰNG TRƯỜNG THỊNH
04/07/2026 17:09
Bid solicitor Campus Management Center has posted Tender Notice Landscape decoration of Hanoi National University urban area in Hoa Lac in 2026 of the investor Campus Management Center with the form Open bidding.
26/06/2026 15:54
The Bid solicitor Campus Management Center has posted the request Plan to select contractors to carry out the task of "decorating the landscape of Hanoi National University urban area in Hoa Lac in 2026" of the investor Campus Management Center with 3 bidding package.
25/06/2026 16:44
Bid solicitor Campus Management Center has posted Tender Notice Construction of the investor Campus Management Center with the form Open bidding.
09/06/2026 18:27
The Bid solicitor Campus Management Center has posted the request Plan to select contractors for the project of Construction of a cafeteria to ensure essential conditions to serve officials, lecturers, pupils and students staying at Ba Vi campus of the investor Campus Management Center with 4 bidding package.
29/05/2026 17:32
The Bid solicitor Campus Management Center has posted the results of the bidding package Management and operation of 595ha area under investment project 3 to build VNU in Hoa Lac of the investor Campus Management Center.
- Winning bidder: GOLDEN BEE GENERAL SERVICES TRADE COMPANY LIMITED
27/05/2026 16:17
Bid solicitor Campus Management Center has posted Tender Notice Management and operation of 595ha area under investment project 3 to build VNU in Hoa Lac of the investor Campus Management Center with the form Open bidding.
12/05/2026 16:36
The Bid solicitor Campus Management Center has posted the results of the bidding package Evaluation of bidding documents, Evaluation of contractor selection results of the investor Campus Management Center.
- Winning bidder: CÔNG TY TNHH TRUYỀN THÔNG VÀ CÔNG NGHỆ MVC
07/05/2026 11:51
The Bid solicitor Campus Management Center has posted the results of the bidding package Prepare and Evaluate Tender documents of the investor Campus Management Center.
- Winning bidder: MTA TRADING AND TECHNOLOGY CONSULTING JOINT STOCK COMPANY
07/05/2026 11:43
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Campus Management Center is the owner of 30 contractor selection plan. In which, they self-invite 22 of contractor selection plan, other units invite bids of 8 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Campus Management Center is the investor of 25 package, of which 19 package is self-invited, other units invite bid 6 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Campus Management Center is the owner of 53 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Campus Management Center has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Campus Management Center is an investor with 34 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.