Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Central Vietnam Power Projects Management Board as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 230 contractors.
- Announced 2 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 13 contractor selection plans with a total of 24 bidding packages, of which 11 prequalification documents have not found the investment project
- Has invited bids for 278 packages (with 293 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 1047 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 774 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 19 packages that have not fully posted the contractor selection results. Of these 17 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.54 contractors.
- Breakdown by bidding field: Goods 23.21%, Construction 14.33%, Consultancy 36.18%, Non-consultancy 26.28%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 33,764,688,064,146 VND, of which the total winning bid value is: 18,516,251,993,487 VND.
- The savings rate is: 45.16%.
Data analysis results of DauThau.info software for project owners Central Vietnam Power Projects Management Board as follows:
- Has relationships with 230 contractors.
- The average number of contractors participating in each bidding package is: 3.54 contractors.
- Proportion of bidding fields: Goods 23.21%, Construction 14.33%, Consulting 36.18%, Non-consulting 26.28%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 33,764,688,064,146 VND, in which the total winning value is: 18,516,251,993,487 VND.
- The savings rate is: 45.16%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Bidding package 7: Construction of mines and bombs and explosives of the investor Central Vietnam Power Projects Management Board.
28/08/2023 16:40
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 10: Supply and transport of first-class equipment and accessories of the investor Central Vietnam Power Projects Management Board.
23/08/2023 15:31
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Bidding package: Surveying consultancy for the preparation of construction investment feasibility study report, construction investment feasibility study report of the investor Central Vietnam Power Projects Management Board.
- Winning bidder: Công ty CP Tư vấn xây dựng điện 5
25/07/2023 16:49
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 7: Construction of clearing mines and explosives of the investor Central Vietnam Power Projects Management Board.
09/06/2023 16:16
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 14: Supply and transport lightning arresters, insulators, optical cables and accessories of the investor Central Vietnam Power Projects Management Board.
17/01/2023 14:54
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 7: Construction of clearing mines and explosives of the investor Central Vietnam Power Projects Management Board.
- Winning bidder: Lữ đoàn Công binh 414/Quân khu 4
16/01/2023 08:05
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 27: Supply and transport of conductors from G34 to DC (phase 2) of the investor Central Vietnam Power Projects Management Board.
12/01/2023 19:19
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 26: Supply and transport of conductors in the section from DD to G34 (phase 2) of the investor Central Vietnam Power Projects Management Board.
12/01/2023 19:17
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package No. 8: Supply of equipment and construction of substations (including organization of site clearance work) of the investor Central Vietnam Power Projects Management Board.
- Winning bidder: CÔNG TY CỔ PHẦN ỨNG DỤNG VÀ PHÁT TRIỂN CÔNG NGHỆ THÔNG TIN
29/12/2022 13:39
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package No. 13: Construction insurance of the investor Central Vietnam Power Projects Management Board.
- Winning bidder: Tổng công ty cổ phần bảo hiểm Petrolimex
22/12/2022 15:12
The data sheet has been partially hidden, to see the full information please Login or Register
Central Vietnam Power Projects Management Board announced the results of the bid package Bidding package 7: Construction of mines and bombs and explosives .
- Winning bidder: Lữ đoàn Công binh 414/Quân khu 4
28/08/2023 16:40
Central Vietnam Power Projects Management Board announced the results of the bid package Package 10: Supply and transport of first-class equipment and accessories .
- Winning bidder: Công ty cổ phần ENTEC Kỹ thuật Năng lượng
23/08/2023 15:31
Central Vietnam Power Projects Management Board announced the results of the bid package Bidding package: Surveying consultancy for the preparation of construction investment feasibility study report, construction investment feasibility study report .
- Winning bidder: Công ty CP Tư vấn xây dựng điện 5
25/07/2023 16:49
Central Vietnam Power Projects Management Board announced the results of the bid package Package 7: Construction of clearing mines and explosives .
- Winning bidder: Trung tâm xử lý Bom mìn và Môi trường Quân khu 5
09/06/2023 16:16
Central Vietnam Power Projects Management Board announced the results of the bid package Package 14: Supply and transport lightning arresters, insulators, optical cables and accessories .
- Winning bidder: Công Ty TNHH Giải Pháp Năng Lượng Việt
17/01/2023 14:54
Central Vietnam Power Projects Management Board announced the results of the bid package Package 7: Construction of clearing mines and explosives .
- Winning bidder: Lữ đoàn Công binh 414/Quân khu 4
16/01/2023 08:05
Central Vietnam Power Projects Management Board announced the results of the bid package Package 27: Supply and transport of conductors from G34 to DC (phase 2) .
- Winning bidder: CÔNG TY CP DÂY CÁP ĐIỆN VIỆT NAM, CÔNG TY TNHH THƯƠNG MẠI SẢN XUẤT DÂY VÀ CÁP ĐIỆN ĐẠI LONG
12/01/2023 19:19
Central Vietnam Power Projects Management Board announced the results of the bid package Package 26: Supply and transport of conductors in the section from DD to G34 (phase 2) .
- Winning bidder: CÔNG TY CỔ PHẦN TẬP ĐOÀN HANAKA, CÔNG TY TRÁCH NHIỆM HỮU HẠN CÁP ĐIỆN LỰC KEVIN VIỆT NAM
12/01/2023 19:17
Central Vietnam Power Projects Management Board announced the results of the bid package Package No. 8: Supply of equipment and construction of substations (including organization of site clearance work) .
- Winning bidder: CÔNG TY CỔ PHẦN ỨNG DỤNG VÀ PHÁT TRIỂN CÔNG NGHỆ THÔNG TIN
29/12/2022 13:39
Central Vietnam Power Projects Management Board announced the results of the bid package Package No. 13: Construction insurance .
- Winning bidder: Tổng công ty cổ phần bảo hiểm Petrolimex
22/12/2022 15:12
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Bidding package 7: Construction of mines and bombs and explosives of the investor Central Vietnam Power Projects Management Board.
28/08/2023 16:40
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 10: Supply and transport of first-class equipment and accessories of the investor Central Vietnam Power Projects Management Board.
23/08/2023 15:31
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Bidding package: Surveying consultancy for the preparation of construction investment feasibility study report, construction investment feasibility study report of the investor Central Vietnam Power Projects Management Board.
- Winning bidder: Công ty CP Tư vấn xây dựng điện 5
25/07/2023 16:49
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 7: Construction of clearing mines and explosives of the investor Central Vietnam Power Projects Management Board.
09/06/2023 16:16
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 14: Supply and transport lightning arresters, insulators, optical cables and accessories of the investor Central Vietnam Power Projects Management Board.
17/01/2023 14:54
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 7: Construction of clearing mines and explosives of the investor Central Vietnam Power Projects Management Board.
- Winning bidder: Lữ đoàn Công binh 414/Quân khu 4
16/01/2023 08:05
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 27: Supply and transport of conductors from G34 to DC (phase 2) of the investor Central Vietnam Power Projects Management Board.
12/01/2023 19:19
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package 26: Supply and transport of conductors in the section from DD to G34 (phase 2) of the investor Central Vietnam Power Projects Management Board.
12/01/2023 19:17
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package No. 8: Supply of equipment and construction of substations (including organization of site clearance work) of the investor Central Vietnam Power Projects Management Board.
- Winning bidder: CÔNG TY CỔ PHẦN ỨNG DỤNG VÀ PHÁT TRIỂN CÔNG NGHỆ THÔNG TIN
29/12/2022 13:39
The Bid solicitor Central Vietnam Power Projects Management Board has posted the results of the bidding package Package No. 13: Construction insurance of the investor Central Vietnam Power Projects Management Board.
- Winning bidder: Tổng công ty cổ phần bảo hiểm Petrolimex
22/12/2022 15:12
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Central Vietnam Power Projects Management Board is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Central Vietnam Power Projects Management Board is the owner of 13 contractor selection plan. In which, they self-invite 13 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Central Vietnam Power Projects Management Board is the investor of 293 package, of which 183 package is self-invited, other units invite bid 110 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Central Vietnam Power Projects Management Board is the owner of 1047 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Central Vietnam Power Projects Management Board has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Central Vietnam Power Projects Management Board is an investor with 230 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.