Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners DAU TIENG RUBBER CORPORATION as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 309 contractors.
- Announced 50 development investment project, of which 6 projects that have not announced the contractor selection plan.
- Announced 415 contractor selection plans with a total of 468 bidding packages, of which 336 prequalification documents have not found the investment project
- Has invited bids for 397 packages (with 429 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 330 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 22 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 128 packages that have not fully posted the contractor selection results. Of these 85 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.75 contractors.
- Breakdown by bidding field: Goods 55.71%, Construction 20.75%, Consultancy 1.17%, Non-consultancy 22.38%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 868,607,603,941 VND, of which the total winning bid value is: 813,313,214,023 VND.
- The savings rate is: 6.37%.
Data analysis results of DauThau.info software for project owners DAU TIENG RUBBER CORPORATION as follows:
- Has relationships with 309 contractors.
- The average number of contractors participating in each bidding package is: 2.75 contractors.
- Proportion of bidding fields: Goods 55.71%, Construction 20.75%, Consulting 1.17%, Non-consulting 22.38%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 868,607,603,941 VND, in which the total winning value is: 813,313,214,023 VND.
- The savings rate is: 6.37%.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor DAU TIENG RUBBER CORPORATION has posted the request Automatic monitoring equipment – Display unit, COD, ammonia, pH and temperature measurement devices – Phu Binh Rubber Processing Plant – Latex processing line – Dong Tam Oil Rubber Co., Ltd. – 2026 plan of the investor DAU TIENG RUBBER CORPORATION with 1 bidding package.
22/08/2026 13:35
The Bid solicitor DAU TIENG RUBBER CORPORATION has posted the request Automatic monitoring equipment – Display unit, COD, ammonia, pH and temperature measurement devices – Long Hoa Rubber Processing Plant – Dong Tam Oil Rubber Co., Ltd. – 2026 plan of the investor DAU TIENG RUBBER CORPORATION with 1 bidding package.
22/08/2026 13:27
The Bid solicitor DAU TIENG RUBBER CORPORATION has posted the request Automatic monitoring equipment – Display unit, COD measurement device, ammonia, pH and temperature sensors – Ben Suc rubber processing plant – Dong Tam Oil Rubber Co., Ltd. – 2026 plan of the investor DAU TIENG RUBBER CORPORATION with 1 bidding package.
22/08/2026 11:40
DAU TIENG RUBBER CORPORATION Posted Development Investment Project Automatic monitoring equipment – Display unit, COD, ammonia, pH and temperature measurement devices – Ben Suc rubber processing plant – Dat Tien Rubber Co., Ltd. – Plan for 2026.
22/08/2026 11:11
DAU TIENG RUBBER CORPORATION Posted Development Investment Project Automatic monitoring equipment – Display unit, COD, ammonia, pH and temperature measurement devices – Long Hoa Rubber Processing Plant – Dong Tam Oil Rubber Co., Ltd. – 2026 plan.
22/08/2026 11:11
Bid solicitor DAU TIENG RUBBER CORPORATION has posted Tender Notice Installation of sap collection pits at water sap collection and storage stations and in various processing plants. Locations include: Long Tân, Long Hòa, Trần Văn Lưu, and Minh Hòa (Total: 31 units). of the investor DAU TIENG RUBBER CORPORATION with the form Simplified Online Bidding.
21/08/2026 11:16
Bid solicitor DAU TIENG RUBBER CORPORATION has posted Tender Notice Installation of latex collection pits at water collection and distribution stations and in the latex storage facilities of the An Lap, Ben Suc, Thanh An, and Doan Van Tien production teams (total of 26 pits). of the investor DAU TIENG RUBBER CORPORATION with the form Simplified Online Bidding.
21/08/2026 11:13
The Bid solicitor DAU TIENG RUBBER CORPORATION has posted the request Installation of drainage systems for sap collection at water sap collection and storage stations in the Long Tan, Long Hoa, Tran Van Lieu, and Minh Hoa production teams. of the investor DAU TIENG RUBBER CORPORATION with 1 bidding package.
18/08/2026 11:06
The Bid solicitor DAU TIENG RUBBER CORPORATION has posted the request Installation of drainage systems for collecting and storing latex at rubber collection and storage stations and latex processing facilities in An Lap, Ben Suc, Thanh An, and Doan Van Tien. of the investor DAU TIENG RUBBER CORPORATION with 1 bidding package.
18/08/2026 11:01
The data sheet has been partially hidden, to see the full information please Login or Register
DAU TIENG RUBBER CORPORATION announced the results of the bid package Repairing construction items Tran Van Luu production team:
+ Repair lot nameplates: 71 pieces;
+ Build a concrete ditch across lot 74 d;
+ Making drainage ditches for the production team's working area;
+ Waterproofing the office;
+ Repair road block 19A. .
- Winning bidder: Cửa hàng dịch vụ kỹ thuật- Thế Vinh
11/08/2026 17:25
DAU TIENG RUBBER CORPORATION announced the results of the bid package Repairing DTX construction items. Long Tan:
+ Repairing latex delivery station lot 72, 35A;
+ Making concrete foundation in front of the latex warehouse lot 71 and 46; Pasting ceramic tiles containing mixed latex lot 71;
+ Pour 1x2 stones to prevent waterlogging and the yard contains frozen latex lot 46, 84; Digging and connecting waste water ditches to 8 protection stations; Repairing latex warehouses at security stations lot 22, 49, 25, 4B;
+ Repairing north-east towpaths at stations lot 7A, 58A, (2 stations); Repairing manure pedestals and drainage ditches in lot 57A. .
- Winning bidder: DUONG HONG ANH COMPANY LIMITED
23/06/2026 17:04
DAU TIENG RUBBER CORPORATION announced the results of the bid package Repairing construction items for An Lap production team
+ Repair latex delivery station lot 59A.
+ Repair of latex warehouse lot 38,10A,6B. .
- Winning bidder: Cửa hàng dịch vụ kỹ thuật- Thế Vinh
23/06/2026 16:59
DAU TIENG RUBBER CORPORATION announced the results of the bid package Repairing railway construction items. Thanh An:
+ Repair latex reservoirs at stations lot 20A, 20, 44, 71, 78;
+ Making concrete woven across ditches (2.5 m x 0.1m x 0.2m) lots 71, 73A, 2B, 8E (24 panels);
+ Construction of pedestal to divide lots 65, 74AB, 70. .
- Winning bidder: Cửa hàng dịch vụ kỹ thuật- Thế Vinh
23/06/2026 16:22
DAU TIENG RUBBER CORPORATION announced the results of the bid package Repairing construction items for Doan Van Tien production team .
- Winning bidder: CÔNG TY TNHH MTV XÂY DỰNG NGỌC QUYÊN
26/05/2026 15:05
DAU TIENG RUBBER CORPORATION announced the results of the bid package Repairing construction items Tran Van Luu Production Team .
- Winning bidder: CÔNG TY TNHH MTV XÂY DỰNG NGỌC QUYÊN
26/05/2026 15:04
DAU TIENG RUBBER CORPORATION announced the results of the bid package Repairing construction items lot 94, 36,34,64, 33 - Long Hoa production team .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG - THƯƠNG MẠI - CẦU ĐƯỜNG VIỆT ANH ĐẠT
26/05/2026 15:03
DAU TIENG RUBBER CORPORATION announced the results of the bid package Dismantling and relocating latex delivery station lot 80C to lot 89BD Doan Van Tien production team .
- Winning bidder: Cửa hàng dịch vụ kỹ thuật- Thế Vinh
26/05/2026 15:01
DAU TIENG RUBBER CORPORATION announced the results of the bid package Providing vehicle physical insurance services, compulsory civil accident insurance, and vehicle occupant accident insurance in 2026 .
- Winning bidder: Hung Vuong Assurance Corporation
13/01/2026 15:59
DAU TIENG RUBBER CORPORATION announced the results of the bid package Shopping for vaseline for business rubber gardens in 2026 .
- Winning bidder: THAO THANH CHEMICAL COMPANY LIMITED
12/01/2026 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor DAU TIENG RUBBER CORPORATION has posted the request Automatic monitoring equipment – Display unit, COD, ammonia, pH and temperature measurement devices – Phu Binh Rubber Processing Plant – Latex processing line – Dong Tam Oil Rubber Co., Ltd. – 2026 plan of the investor DAU TIENG RUBBER CORPORATION with 1 bidding package.
22/08/2026 13:35
The Bid solicitor DAU TIENG RUBBER CORPORATION has posted the request Automatic monitoring equipment – Display unit, COD, ammonia, pH and temperature measurement devices – Long Hoa Rubber Processing Plant – Dong Tam Oil Rubber Co., Ltd. – 2026 plan of the investor DAU TIENG RUBBER CORPORATION with 1 bidding package.
22/08/2026 13:27
The Bid solicitor DAU TIENG RUBBER CORPORATION has posted the request Automatic monitoring equipment – Display unit, COD measurement device, ammonia, pH and temperature sensors – Ben Suc rubber processing plant – Dong Tam Oil Rubber Co., Ltd. – 2026 plan of the investor DAU TIENG RUBBER CORPORATION with 1 bidding package.
22/08/2026 11:40
DAU TIENG RUBBER CORPORATION Posted Development Investment Project Automatic monitoring equipment – Display unit, COD, ammonia, pH and temperature measurement devices – Ben Suc rubber processing plant – Dat Tien Rubber Co., Ltd. – Plan for 2026.
22/08/2026 11:11
DAU TIENG RUBBER CORPORATION Posted Development Investment Project Automatic monitoring equipment – Display unit, COD, ammonia, pH and temperature measurement devices – Long Hoa Rubber Processing Plant – Dong Tam Oil Rubber Co., Ltd. – 2026 plan.
22/08/2026 11:11
Bid solicitor DAU TIENG RUBBER CORPORATION has posted Tender Notice Installation of sap collection pits at water sap collection and storage stations and in various processing plants. Locations include: Long Tân, Long Hòa, Trần Văn Lưu, and Minh Hòa (Total: 31 units). of the investor DAU TIENG RUBBER CORPORATION with the form Simplified Online Bidding.
21/08/2026 11:16
Bid solicitor DAU TIENG RUBBER CORPORATION has posted Tender Notice Installation of latex collection pits at water collection and distribution stations and in the latex storage facilities of the An Lap, Ben Suc, Thanh An, and Doan Van Tien production teams (total of 26 pits). of the investor DAU TIENG RUBBER CORPORATION with the form Simplified Online Bidding.
21/08/2026 11:13
The Bid solicitor DAU TIENG RUBBER CORPORATION has posted the request Installation of drainage systems for sap collection at water sap collection and storage stations in the Long Tan, Long Hoa, Tran Van Lieu, and Minh Hoa production teams. of the investor DAU TIENG RUBBER CORPORATION with 1 bidding package.
18/08/2026 11:06
The Bid solicitor DAU TIENG RUBBER CORPORATION has posted the request Installation of drainage systems for collecting and storing latex at rubber collection and storage stations and latex processing facilities in An Lap, Ben Suc, Thanh An, and Doan Van Tien. of the investor DAU TIENG RUBBER CORPORATION with 1 bidding package.
18/08/2026 11:01
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DAU TIENG RUBBER CORPORATION is the investor of 50 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor DAU TIENG RUBBER CORPORATION is the owner of 415 contractor selection plan. In which, they self-invite 291 of contractor selection plan, other units invite bids of 124 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor DAU TIENG RUBBER CORPORATION is the investor of 429 package, of which 272 package is self-invited, other units invite bid 157 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DAU TIENG RUBBER CORPORATION is the owner of 330 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor DAU TIENG RUBBER CORPORATION has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DAU TIENG RUBBER CORPORATION is an investor with 309 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.