Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners DONG XUAN CORPORATION as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 10 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 4 contractor selection plans with a total of 17 bidding packages, of which 3 prequalification documents have not found the investment project
- Has invited bids for 2 packages (with 2 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 11 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 9 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 50.00%, Construction 50.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,856,961,060 VND, of which the total winning bid value is: 5,636,632,852 VND.
- The savings rate is: 3.76%.
Data analysis results of DauThau.info software for project owners DONG XUAN CORPORATION as follows:
- Has relationships with 10 contractors.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 50.00%, Construction 50.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,856,961,060 VND, in which the total winning value is: 5,636,632,852 VND.
- The savings rate is: 3.76%.
You need to Login or Sign up to view all informations.
- Participated in 12 bidding packages, of which 12 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 72.91% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.73% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (9), Ninh Bình (1), Quảng Ninh (1), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (9), Ninh Bình (1), Quảng Ninh (1), Undefined (1)
- Has relationships with 4 Bid Solicitors
- Has relationships with 6 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV06-2026: Consulting and supervision of bidding package TC01-2026 of the investor DONG XUAN CORPORATION.
- Winning bidder: BASON VIET NAM INVESTMENT JOINT STOCK COMPANY
26/08/2026 09:08
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package BH01-2026: Construction insurance of the investor DONG XUAN CORPORATION.
- Winning bidder: AAA INSURANCE CORPORATION
26/08/2026 08:57
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TC01-2026: Construction of landscape renovation of the winter 1946 monument area of the investor DONG XUAN CORPORATION.
- Winning bidder: HOANG HUNG CONSTRUCTION DEVELOPMENT AND TRADING INVESTMENT COMPANY LIMITED
24/08/2026 10:55
Bid solicitor DONG XUAN CORPORATION has posted Tender Notice TC01-2026: Construction of landscape renovation of the winter 1946 monument area of the investor DONG XUAN CORPORATION with the form Open bidding.
06/08/2026 17:21
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV03-2026: Project Management Consulting of the investor DONG XUAN CORPORATION.
- Winning bidder: SCIENCE AND TECHONOLOGY BUILDING JOINT STOCK COMPANY
30/07/2026 21:04
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV05-2026: Consulting on appraisal of E-HSMT, QLCNT bidding package TC01-2026 of the investor DONG XUAN CORPORATION.
- Winning bidder: VINACE - VIETNAM INSTALLATION EQUIPMENT AND CONSULTANCY CONSTRUCTION CORPORATION
30/07/2026 11:18
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV04-2026: Consulting on preparing E-Bidding, evaluating E-Bidding for bidding package TC01-2026 of the investor DONG XUAN CORPORATION.
- Winning bidder: CÔNG TY CỔ PHẦN QUẢN LÝ DỰ ÁN VÀ CHI PHÍ ĐẦU TƯ - AFO
30/07/2026 11:12
The Bid solicitor DONG XUAN CORPORATION has posted the request Plan for selecting contractors to implement bidding packages under the Project to renovate the landscape of the Winter 1946 monument area of the investor DONG XUAN CORPORATION with 8 bidding package.
30/07/2026 11:02
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV02-2026: Consulting on verifying Economic - Technical reports of the investor DONG XUAN CORPORATION.
- Winning bidder: SCIENCE AND TECHONOLOGY BUILDING JOINT STOCK COMPANY
19/05/2026 15:18
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV01-2026: Consulting on preparing Economic - Technical reports of the investor DONG XUAN CORPORATION.
- Winning bidder: MEIN GARTEN JOINT STOCK COMPANY
08/05/2026 08:29
The data sheet has been partially hidden, to see the full information please Login or Register
DONG XUAN CORPORATION announced the results of the bid package Package No. 5: Supervision consultancy .
- Winning bidder: VIET NAM ACHITECH AND DESIGN JOINT STOCK COMPANY
15/09/2023 18:10
DONG XUAN CORPORATION announced the results of the bid package Package No. 1: Infrastructure renovation and repair .
- Winning bidder: Công ty cổ phần tư vấn và xây dựng Thành Công
15/09/2023 18:07
DONG XUAN CORPORATION announced the results of the bid package Package 2: Equipment procurement (including testing, calibration, training and equipment transfer) .
- Winning bidder: VU PHUC TECHNOLOGY JOINT STOCK COMPANY
15/09/2023 17:55
DONG XUAN CORPORATION announced the results of the bidding package Package 2: Equipment procurement (including testing, calibration, training and equipment transfer) with 1 participating contractors .
11/08/2023 09:33
DONG XUAN CORPORATION publishes Tender Notice Package 2: Equipment procurement (including testing, calibration, training and equipment transfer) in the form Competitive Offer .
04/08/2023 14:51
DONG XUAN CORPORATION publishes the plan Renovating and upgrading the camera system of Dong Xuan market with 6 bidding package .
26/07/2023 11:58
DONG XUAN CORPORATION publishes Tender Notice Construction, supply and installation of equipment and cost of general items in the form Open bidding (Only select domestic contractors) .
14/04/2017 08:50
DONG XUAN CORPORATION publishes the plan Renovating the fresh food area – Dong Xuan Market with 1 bidding package .
13/04/2017 17:01
DONG XUAN CORPORATION publishes Tender Notice Inspecting, assessing the current status and setting up maintenance procedures for Dong Xuan market works in the form National competitive bidding .
26/01/2015 08:44
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV06-2026: Consulting and supervision of bidding package TC01-2026 of the investor DONG XUAN CORPORATION.
- Winning bidder: BASON VIET NAM INVESTMENT JOINT STOCK COMPANY
26/08/2026 09:08
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package BH01-2026: Construction insurance of the investor DONG XUAN CORPORATION.
- Winning bidder: AAA INSURANCE CORPORATION
26/08/2026 08:57
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TC01-2026: Construction of landscape renovation of the winter 1946 monument area of the investor DONG XUAN CORPORATION.
- Winning bidder: HOANG HUNG CONSTRUCTION DEVELOPMENT AND TRADING INVESTMENT COMPANY LIMITED
24/08/2026 10:55
Bid solicitor DONG XUAN CORPORATION has posted Tender Notice TC01-2026: Construction of landscape renovation of the winter 1946 monument area of the investor DONG XUAN CORPORATION with the form Open bidding.
06/08/2026 17:21
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV03-2026: Project Management Consulting of the investor DONG XUAN CORPORATION.
- Winning bidder: SCIENCE AND TECHONOLOGY BUILDING JOINT STOCK COMPANY
30/07/2026 21:04
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV05-2026: Consulting on appraisal of E-HSMT, QLCNT bidding package TC01-2026 of the investor DONG XUAN CORPORATION.
- Winning bidder: VINACE - VIETNAM INSTALLATION EQUIPMENT AND CONSULTANCY CONSTRUCTION CORPORATION
30/07/2026 11:18
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV04-2026: Consulting on preparing E-Bidding, evaluating E-Bidding for bidding package TC01-2026 of the investor DONG XUAN CORPORATION.
- Winning bidder: CÔNG TY CỔ PHẦN QUẢN LÝ DỰ ÁN VÀ CHI PHÍ ĐẦU TƯ - AFO
30/07/2026 11:12
The Bid solicitor DONG XUAN CORPORATION has posted the request Plan for selecting contractors to implement bidding packages under the Project to renovate the landscape of the Winter 1946 monument area of the investor DONG XUAN CORPORATION with 8 bidding package.
30/07/2026 11:02
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV02-2026: Consulting on verifying Economic - Technical reports of the investor DONG XUAN CORPORATION.
- Winning bidder: SCIENCE AND TECHONOLOGY BUILDING JOINT STOCK COMPANY
19/05/2026 15:18
The Bid solicitor DONG XUAN CORPORATION has posted the results of the bidding package TV01-2026: Consulting on preparing Economic - Technical reports of the investor DONG XUAN CORPORATION.
- Winning bidder: MEIN GARTEN JOINT STOCK COMPANY
08/05/2026 08:29
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor DONG XUAN CORPORATION is the owner of 4 contractor selection plan. In which, they self-invite 2 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor DONG XUAN CORPORATION is the investor of 2 package, of which 1 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DONG XUAN CORPORATION is the owner of 11 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor DONG XUAN CORPORATION has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DONG XUAN CORPORATION is an investor with 10 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.