Data analysis results of DauThau.info software for project owners DRVN as follows:
- Has relationships with 20 bid solicitors.
- Has relationships with 867 contractors.
- Announced 352 development investment project, of which 52 projects that have not announced the contractor selection plan.
- Announced 1693 contractor selection plans with a total of 2984 bidding packages, of which 60 prequalification documents have not found the investment project
- Has invited bids for 1456 packages (with 2015 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 994 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 407 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 649 packages that have not fully posted the contractor selection results. Of these 543 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.46 contractors.
- Breakdown by bidding field: Goods 1.29%, Construction 58.61%, Consultancy 37.77%, Non-consultancy 2.33%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 6,848,299,962,180 VND, of which the total winning bid value is: 6,326,801,343,520 VND.
- The savings rate is: 7.62%.
Data analysis results of DauThau.info software for project owners DRVN as follows:
- Has relationships with 867 contractors.
- The average number of contractors participating in each bidding package is: 2.46 contractors.
- Proportion of bidding fields: Goods 1.29%, Construction 58.61%, Consulting 37.77%, Non-consulting 2.33%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 6,848,299,962,180 VND, in which the total winning value is: 6,326,801,343,520 VND.
- The savings rate is: 7.62%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor DRVN has posted the results of the bidding package Bidding package TV.62.03: Consulting on verification of construction drawing design and estimates (including construction information model - BIM), traffic safety verification (TKBVTC phase) of the investor DRVN.
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
28/08/2026 16:06
The Bid solicitor DRVN has posted the results of the bidding package Bidding package TV.53.03: Consulting on verification of construction drawing design and estimates (including construction information model - BIM), traffic safety verification (TKBVTC phase) of the investor DRVN.
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
28/08/2026 08:45
The Bid solicitor DRVN has posted the results of the bidding package Package TV.91B.03: Consulting on verification of construction drawing design and estimates (including verification of Construction Information Model - BIM), traffic safety verification (construction drawing design phase) - National Highway 91B of the investor DRVN.
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
25/08/2026 15:06
Bid solicitor DRVN has posted Tender Notice Tendering process for purchasing software licenses (Windows and Microsoft Office) for the Vietnam Department of Road Administration. of the investor DRVN with the form Competitive Offer.
22/08/2026 12:28
The Bid solicitor DRVN has posted the request Plan for selecting a contractor: Procurement of "IT service outsourcing: upgrading and expansion; maintenance and operation, data synchronization with the National Data Center, and utilization of road infrastructure database." of the investor DRVN with 3 bidding package.
20/08/2026 15:12
The Bid solicitor DRVN has posted the results of the bidding package Bidding package TV.53.02: Consulting and supervision of survey work (TKBVTC step) - QL.53 of the investor DRVN.
- Winning bidder: SOUTHERN 533 CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
11/08/2026 16:00
The Bid solicitor DRVN has posted the results of the bidding package Bidding package TV.53.01: Survey consulting, construction drawing design and estimates (including construction information modeling -BIM) - QL.53 of the investor DRVN.
- Winning bidder: SOUTH TRANSPORT ENGINEERING DESIGN JOINT STOCK INCORPORATED
11/08/2026 14:41
The Bid solicitor DRVN has posted the results of the bidding package Package TV.91B.01: Survey consulting, construction drawing design and estimates (including Building Information Model - BIM) - National Highway 91B of the investor DRVN.
- Winning bidder: VITEC ENGINEERING JOINT STOCK COMPANY
11/08/2026 14:25
The Bid solicitor DRVN has posted the results of the bidding package Package TV.91B.02: Consulting and supervision of construction survey work (construction drawing design step) - National Highway 91B of the investor DRVN.
- Winning bidder: VNC CONSTRUCTION JOINT STOCK COMPANY
11/08/2026 14:23
The Bid solicitor DRVN has posted the results of the bidding package Bidding package TV.62.01: Survey consulting, construction drawing design and estimates (including building information model - BIM) - QL.62 of the investor DRVN.
- Winning bidder: TECCO BMT
11/08/2026 14:02
The data sheet has been partially hidden, to see the full information please Login or Register
DRVN announced the results of the bid package Package RPBM02: Construction of bomb, mine and explosive material clearance .
- Winning bidder: LUNG LO CONSTRUCTION CORPORATION, TRUONG SON CONSTRUCTION CORPORATION, THANH AN ONE MEMBER LIMITED LIABILITY CORPORATION
10/02/2026 10:50
DRVN announced the results of the bid package Package No. 5: Consulting on auditing and finalization of completed works .
- Winning bidder: VFA AUDITING COMPANY LIMITED
10/01/2026 17:31
DRVN announced the results of the bid package Package TV12: Consulting on traffic safety verification before putting into operation .
- Winning bidder: Trung tâm kỹ thuật đường bộ 3
24/10/2025 09:56
DRVN announced the results of the bid package Repair and replacement parts for cars BKS 80A-00079 of the Agency of the Vietnam Department of Vietnam .
- Winning bidder: TOYOTA MY DINH SOLE MEMBER COMPANY LIMITED
03/07/2025 10:19
DRVN publishes the plan Plan for selecting contractors to repair and replace spare parts for cars BKS 80A-00079 of the Agency of the Vietnam Railway Department with 1 bidding package .
03/07/2025 10:10
DRVN publishes the plan Adjustment of KHLCNT Project to repair Can Tho Bridge Monitoring System Km2067+585, Highway 1, Vinh Long Province, Can Tho City with 3 bidding package .
23/06/2025 10:38
DRVN publishes the plan The plan for selecting contractors for the project of renovating and upgrading National Highway 14E, section Km15+270 - Km89+700, Quang Nam province with 14 bidding package .
18/06/2025 16:50
DRVN announced the results of the bid package Organizing the bilateral conference to implement the Government Transport Agreement on the Socialist Republic of Vietnam and the Royal Government of Cambodia in Vietnam .
- Winning bidder: NON NUOC MEDIA EVENT AND TRAVEL INTERNATIONAL COMPANY LIMITED
20/05/2025 17:07
DRVN publishes the plan Organizing the bilateral conference to implement the Government Transport Agreement on the Socialist Republic of Vietnam and the Royal Government of Cambodia in Vietnam with 1 bidding package .
20/05/2025 16:58
DRVN publishes the plan Hire data transmission services, Internet and hire maintenance services, maintenance, repair of network infrastructure and computer equipment, printers, channel supervision management of the Vietnam Road Administration with 2 bidding package .
21/04/2025 09:41
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor DRVN has posted the results of the bidding package Bidding package TV.62.03: Consulting on verification of construction drawing design and estimates (including construction information model - BIM), traffic safety verification (TKBVTC phase) of the investor DRVN.
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
28/08/2026 16:06
The Bid solicitor DRVN has posted the results of the bidding package Bidding package TV.53.03: Consulting on verification of construction drawing design and estimates (including construction information model - BIM), traffic safety verification (TKBVTC phase) of the investor DRVN.
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
28/08/2026 08:45
The Bid solicitor DRVN has posted the results of the bidding package Package TV.91B.03: Consulting on verification of construction drawing design and estimates (including verification of Construction Information Model - BIM), traffic safety verification (construction drawing design phase) - National Highway 91B of the investor DRVN.
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
25/08/2026 15:06
Bid solicitor DRVN has posted Tender Notice Tendering process for purchasing software licenses (Windows and Microsoft Office) for the Vietnam Department of Road Administration. of the investor DRVN with the form Competitive Offer.
22/08/2026 12:28
The Bid solicitor DRVN has posted the request Plan for selecting a contractor: Procurement of "IT service outsourcing: upgrading and expansion; maintenance and operation, data synchronization with the National Data Center, and utilization of road infrastructure database." of the investor DRVN with 3 bidding package.
20/08/2026 15:12
The Bid solicitor DRVN has posted the results of the bidding package Bidding package TV.53.02: Consulting and supervision of survey work (TKBVTC step) - QL.53 of the investor DRVN.
- Winning bidder: SOUTHERN 533 CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
11/08/2026 16:00
The Bid solicitor DRVN has posted the results of the bidding package Bidding package TV.53.01: Survey consulting, construction drawing design and estimates (including construction information modeling -BIM) - QL.53 of the investor DRVN.
- Winning bidder: SOUTH TRANSPORT ENGINEERING DESIGN JOINT STOCK INCORPORATED
11/08/2026 14:41
The Bid solicitor DRVN has posted the results of the bidding package Package TV.91B.01: Survey consulting, construction drawing design and estimates (including Building Information Model - BIM) - National Highway 91B of the investor DRVN.
- Winning bidder: VITEC ENGINEERING JOINT STOCK COMPANY
11/08/2026 14:25
The Bid solicitor DRVN has posted the results of the bidding package Package TV.91B.02: Consulting and supervision of construction survey work (construction drawing design step) - National Highway 91B of the investor DRVN.
- Winning bidder: VNC CONSTRUCTION JOINT STOCK COMPANY
11/08/2026 14:23
The Bid solicitor DRVN has posted the results of the bidding package Bidding package TV.62.01: Survey consulting, construction drawing design and estimates (including building information model - BIM) - QL.62 of the investor DRVN.
- Winning bidder: TECCO BMT
11/08/2026 14:02
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DRVN is the investor of 352 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor DRVN is the owner of 1693 contractor selection plan. In which, they self-invite 594 of contractor selection plan, other units invite bids of 1099 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor DRVN is the investor of 2015 package, of which 42 package is self-invited, other units invite bid 1973 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DRVN is the owner of 994 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DRVN has published 6 penalty decision(s). Part of the data table has been hidden. To view the full information, please log in or sign up
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: The investor DRVN has a relationship with 20 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DRVN is an investor with 867 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.