Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners DongDa PC as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 226 contractors.
- Announced 145 development investment project, of which 28 projects that have not announced the contractor selection plan.
- Announced 555 contractor selection plans with a total of 1237 bidding packages, of which 238 prequalification documents have not found the investment project
- Has invited bids for 299 packages (with 345 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 527 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 239 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 812 packages that have not fully posted the contractor selection results. Of these 805 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.41 contractors.
- Breakdown by bidding field: Goods 25.22%, Construction 44.06%, Consultancy 28.70%, Non-consultancy 2.03%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,035,284,122,948 VND, of which the total winning bid value is: 982,218,004,542 VND.
- The savings rate is: 5.13%.
Data analysis results of DauThau.info software for project owners DongDa PC as follows:
- Has relationships with 226 contractors.
- The average number of contractors participating in each bidding package is: 2.41 contractors.
- Proportion of bidding fields: Goods 25.22%, Construction 44.06%, Consulting 28.70%, Non-consulting 2.03%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,035,284,122,948 VND, in which the total winning value is: 982,218,004,542 VND.
- The savings rate is: 5.13%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor DongDa PC has posted the request KHLCNT Package No. 01-TV-DTXD 2026: Consulting on making technical construction management works in the first phase of 2026 of the investor DongDa PC with 1 bidding package.
13/05/2025 09:57
The Bid solicitor DongDa PC has posted the request Adjust the contractor selection plan package 04-01-XL-DTXD2024: Construction and installation of architectural renovation works in Dong Da 2024 (Kim Lien Ward) under the architectural renovation project of TBA in Dong Da area in 2024 (Kim Lien Ward) of the investor DongDa PC with 1 bidding package.
15/04/2025 11:10
The Bid solicitor DongDa PC has posted the request KHLCNT Bidding Package TVGS Investor of the first phase construction projects in 2025 of the investor DongDa PC with 2 bidding package.
10/04/2025 15:04
The Bid solicitor DongDa PC has posted the request KHLCNT Package 13/TVGS-DTXD2025: Consulting supervision of construction construction works in the first phase of 2025 of the investor DongDa PC with 1 bidding package.
01/04/2025 15:13
The Bid solicitor DongDa PC has posted the request KHLCNT Package No. 01-XL-SCL2025: Construction and installation of overhaul works replacing the medium-volinicent underground cable head in 2025 and the architecture of TBAs in Dong Da district in 2025 of the investor DongDa PC with 1 bidding package.
19/03/2025 17:08
The Bid solicitor DongDa PC has posted the request KHLCNT Package No. 02/MS-SCL 2025 Buying electrical equipment for large repair works in 2025 of the investor DongDa PC with 1 bidding package.
12/03/2025 15:53
The Bid solicitor DongDa PC has posted the request Overhauling architecture of TBAs in Dong Da district in 2025 of the investor DongDa PC with 1 bidding package.
12/03/2025 14:15
The Bid solicitor DongDa PC has posted the request Overhauling high voltage grid floating TBA in Dong Da district in 2025 of the investor DongDa PC with 2 bidding package.
12/03/2025 14:09
The Bid solicitor DongDa PC has posted the request KHLCNT Package 12/TVGS-DTXD2025: Consulting on supervision of construction construction projects in the first phase of 2025 of the investor DongDa PC with 1 bidding package.
12/03/2025 14:08
The Bid solicitor DongDa PC has posted the request Overall underground low -voltage grid of TBAs in Dong Da district in 2025 of the investor DongDa PC with 3 bidding package.
12/03/2025 14:03
The data sheet has been partially hidden, to see the full information please Login or Register
DongDa PC publishes the plan KHLCNT Package No. 01-TV-DTXD 2026: Consulting on making technical construction management works in the first phase of 2026 with 1 bidding package .
13/05/2025 09:57
DongDa PC publishes the plan Adjust the contractor selection plan package 04-01-XL-DTXD2024: Construction and installation of architectural renovation works in Dong Da 2024 (Kim Lien Ward) under the architectural renovation project of TBA in Dong Da area in 2024 (Kim Lien Ward) with 1 bidding package .
15/04/2025 11:10
DongDa PC publishes the plan KHLCNT Bidding Package TVGS Investor of the first phase construction projects in 2025 with 2 bidding package .
10/04/2025 15:04
DongDa PC publishes the plan KHLCNT Package 13/TVGS-DTXD2025: Consulting supervision of construction construction works in the first phase of 2025 with 1 bidding package .
01/04/2025 15:13
DongDa PC publishes the plan KHLCNT Package No. 01-XL-SCL2025: Construction and installation of overhaul works replacing the medium-volinicent underground cable head in 2025 and the architecture of TBAs in Dong Da district in 2025 with 1 bidding package .
19/03/2025 17:08
DongDa PC publishes the plan KHLCNT Package No. 02/MS-SCL 2025 Buying electrical equipment for large repair works in 2025 with 1 bidding package .
12/03/2025 15:53
DongDa PC publishes the plan Overhauling architecture of TBAs in Dong Da district in 2025 with 1 bidding package .
12/03/2025 14:15
DongDa PC publishes the plan Overhauling high voltage grid floating TBA in Dong Da district in 2025 with 2 bidding package .
12/03/2025 14:09
DongDa PC publishes the plan KHLCNT Package 12/TVGS-DTXD2025: Consulting on supervision of construction construction projects in the first phase of 2025 with 1 bidding package .
12/03/2025 14:08
DongDa PC publishes the plan Overall underground low -voltage grid of TBAs in Dong Da district in 2025 with 3 bidding package .
12/03/2025 14:03
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor DongDa PC has posted the request KHLCNT Package No. 01-TV-DTXD 2026: Consulting on making technical construction management works in the first phase of 2026 of the investor DongDa PC with 1 bidding package.
13/05/2025 09:57
The Bid solicitor DongDa PC has posted the request Adjust the contractor selection plan package 04-01-XL-DTXD2024: Construction and installation of architectural renovation works in Dong Da 2024 (Kim Lien Ward) under the architectural renovation project of TBA in Dong Da area in 2024 (Kim Lien Ward) of the investor DongDa PC with 1 bidding package.
15/04/2025 11:10
The Bid solicitor DongDa PC has posted the request KHLCNT Bidding Package TVGS Investor of the first phase construction projects in 2025 of the investor DongDa PC with 2 bidding package.
10/04/2025 15:04
The Bid solicitor DongDa PC has posted the request KHLCNT Package 13/TVGS-DTXD2025: Consulting supervision of construction construction works in the first phase of 2025 of the investor DongDa PC with 1 bidding package.
01/04/2025 15:13
The Bid solicitor DongDa PC has posted the request KHLCNT Package No. 01-XL-SCL2025: Construction and installation of overhaul works replacing the medium-volinicent underground cable head in 2025 and the architecture of TBAs in Dong Da district in 2025 of the investor DongDa PC with 1 bidding package.
19/03/2025 17:08
The Bid solicitor DongDa PC has posted the request KHLCNT Package No. 02/MS-SCL 2025 Buying electrical equipment for large repair works in 2025 of the investor DongDa PC with 1 bidding package.
12/03/2025 15:53
The Bid solicitor DongDa PC has posted the request Overhauling architecture of TBAs in Dong Da district in 2025 of the investor DongDa PC with 1 bidding package.
12/03/2025 14:15
The Bid solicitor DongDa PC has posted the request Overhauling high voltage grid floating TBA in Dong Da district in 2025 of the investor DongDa PC with 2 bidding package.
12/03/2025 14:09
The Bid solicitor DongDa PC has posted the request KHLCNT Package 12/TVGS-DTXD2025: Consulting on supervision of construction construction projects in the first phase of 2025 of the investor DongDa PC with 1 bidding package.
12/03/2025 14:08
The Bid solicitor DongDa PC has posted the request Overall underground low -voltage grid of TBAs in Dong Da district in 2025 of the investor DongDa PC with 3 bidding package.
12/03/2025 14:03
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DongDa PC is the investor of 145 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor DongDa PC is the owner of 555 contractor selection plan. In which, they self-invite 549 of contractor selection plan, other units invite bids of 6 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor DongDa PC is the investor of 345 package, of which 338 package is self-invited, other units invite bid 7 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DongDa PC is the owner of 527 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor DongDa PC has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor DongDa PC is an investor with 226 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.