Data analysis results of DauThau.info software for project owners EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 106 contractors.
- Announced 3 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 75 contractor selection plans with a total of 76 bidding packages, of which 71 prequalification documents have not found the investment project
- Has invited bids for 97 packages (with 106 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 98 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 13 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 9 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.99 contractors.
- Breakdown by bidding field: Goods 27.36%, Construction 29.25%, Consultancy 3.77%, Non-consultancy 39.62%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 127,380,461,067 VND, of which the total winning bid value is: 121,371,849,137 VND.
- The savings rate is: 4.72%.
Data analysis results of DauThau.info software for project owners EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD as follows:
- Has relationships with 106 contractors.
- The average number of contractors participating in each bidding package is: 1.99 contractors.
- Proportion of bidding fields: Goods 27.36%, Construction 29.25%, Consulting 3.77%, Non-consulting 39.62%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 127,380,461,067 VND, in which the total winning value is: 121,371,849,137 VND.
- The savings rate is: 4.72%.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 27 bidding packages with 9 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Repair the 5th floor LED logo system, podium, EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
19/06/2025 16:20
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the request Contractor selection plan
Procurement estimates: Repairing LED logo system on the 5th floor, podium, EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD with 1 bidding package.
19/06/2025 10:59
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Emergency repair of oil -absorbing incidents at the oil drying set of Chiller No. 2 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: Carrier Vietnam Air Conditioning Company Limited
18/06/2025 15:25
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2025-01: Construction (I) replaces Granite 2 RAM and DA3 walls; (ii) Replace sliding power blinds standing the hall of the EVN building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG NHÀ HÀ NỘI
18/06/2025 15:13
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Replace valves of all kinds, filtering, soft connection at some locations in the chiller room and water division of 02 cooling towers No. 3 and No. 4 of the air -conditioning system of EVN Building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: NGOC LINH TECHNICAL AND TRADING JOINT STOCK COMPANY
16/06/2025 17:20
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2025-04: CWB02 + CWB03 insulation film from 5B - 29B floor; Replace EcoPhone ceiling panels of 7B, 8B, 9B and 21B floors with ceiling plates equivalent to EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
16/06/2025 09:53
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2024-02: Construction of waterproofing aluminum glass wall system and aluminum aluminum panel on the outside of EVN building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
16/06/2025 09:52
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Replace 03 LED screens of the transplant screen system at the 1st floor reception hall of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: D&T VIET NAM MECHANICAL ELECTRICAL JOINT STOCK COMPANY
05/06/2025 14:11
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Supply chemicals for cold water sugar system EVN Building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: MINH HOANG REVIVE AQUA NATURE COMPANY LIMITED
04/06/2025 15:09
Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted Tender Notice Equipped with enhanced air conditioning systems and supplemented UPS sources for A0, A1 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD with the form Open bidding.
30/05/2025 15:03
The data sheet has been partially hidden, to see the full information please Login or Register
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package Repair the 5th floor LED logo system, podium, EVN building in 2025 .
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
19/06/2025 16:20
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD publishes the plan Contractor selection plan
Procurement estimates: Repairing LED logo system on the 5th floor, podium, EVN building in 2025 with 1 bidding package .
19/06/2025 10:59
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package SCL 2025-01: Construction (I) replaces Granite 2 RAM and DA3 walls; (ii) Replace sliding power blinds standing the hall of the EVN building .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG NHÀ HÀ NỘI
18/06/2025 15:13
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package Replace valves of all kinds, filtering, soft connection at some locations in the chiller room and water division of 02 cooling towers No. 3 and No. 4 of the air -conditioning system of EVN Building .
- Winning bidder: NGOC LINH TECHNICAL AND TRADING JOINT STOCK COMPANY
16/06/2025 17:20
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package SCL 2025-04: CWB02 + CWB03 insulation film from 5B - 29B floor; Replace EcoPhone ceiling panels of 7B, 8B, 9B and 21B floors with ceiling plates equivalent to EVN building in 2025 .
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
16/06/2025 09:53
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package SCL 2024-02: Construction of waterproofing aluminum glass wall system and aluminum aluminum panel on the outside of EVN building .
- Winning bidder: SON HA TRADING SERVICE AND CONSTRUCTION COMPANY LIMITED
16/06/2025 09:52
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bidding package Replace valves of all types, filters, soft connections at some locations in the Chiller room and water divider panels of 02 cooling towers No. 3 and No. 4 of the air conditioning system of EVN Building with 1 participating contractors .
05/06/2025 14:13
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bidding package SCL 2025-01: Construction (I) replaces Granite 2 RAM and DA3 walls; (ii) Replace sliding power blinds standing the hall of the EVN building with 1 participating contractors .
05/06/2025 10:54
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package Supply chemicals for cold water sugar system EVN Building .
- Winning bidder: MINH HOANG REVIVE AQUA NATURE COMPANY LIMITED
04/06/2025 15:09
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bidding package SCL 2025-04: CWB02 + CWB03 insulation film from 5B - 29B floor; Replace EcoPhone ceiling panels of 7B, 8B, 9B and 21B floors with ceiling plates equivalent to EVN building in 2025 with 1 participating contractors .
04/06/2025 09:57
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Repair the 5th floor LED logo system, podium, EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
19/06/2025 16:20
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the request Contractor selection plan
Procurement estimates: Repairing LED logo system on the 5th floor, podium, EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD with 1 bidding package.
19/06/2025 10:59
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Emergency repair of oil -absorbing incidents at the oil drying set of Chiller No. 2 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: Carrier Vietnam Air Conditioning Company Limited
18/06/2025 15:25
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2025-01: Construction (I) replaces Granite 2 RAM and DA3 walls; (ii) Replace sliding power blinds standing the hall of the EVN building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG NHÀ HÀ NỘI
18/06/2025 15:13
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Replace valves of all kinds, filtering, soft connection at some locations in the chiller room and water division of 02 cooling towers No. 3 and No. 4 of the air -conditioning system of EVN Building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: NGOC LINH TECHNICAL AND TRADING JOINT STOCK COMPANY
16/06/2025 17:20
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2025-04: CWB02 + CWB03 insulation film from 5B - 29B floor; Replace EcoPhone ceiling panels of 7B, 8B, 9B and 21B floors with ceiling plates equivalent to EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
16/06/2025 09:53
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2024-02: Construction of waterproofing aluminum glass wall system and aluminum aluminum panel on the outside of EVN building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
16/06/2025 09:52
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Replace 03 LED screens of the transplant screen system at the 1st floor reception hall of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: D&T VIET NAM MECHANICAL ELECTRICAL JOINT STOCK COMPANY
05/06/2025 14:11
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Supply chemicals for cold water sugar system EVN Building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: MINH HOANG REVIVE AQUA NATURE COMPANY LIMITED
04/06/2025 15:09
Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted Tender Notice Equipped with enhanced air conditioning systems and supplemented UPS sources for A0, A1 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD with the form Open bidding.
30/05/2025 15:03
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD is the investor of 3 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD is the owner of 75 contractor selection plan. In which, they self-invite 75 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD is the investor of 106 package, of which 106 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD is the owner of 98 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD is an investor with 106 contractor. The data sheet has been partially hidden, to see the full information please Login or Register