Data analysis results of DauThau.info software for project owners HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 703 contractors.
- Announced 118 development investment project, of which 10 projects that have not announced the contractor selection plan.
- Announced 1839 contractor selection plans with a total of 2104 bidding packages, of which 1679 prequalification documents have not found the investment project
- Has invited bids for 1053 packages (with 1128 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 1764 packages, and canceled bids for 6 packages (among the packages mentioned above).
- There are 767 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1200 packages that have not fully posted the contractor selection results. Of these 1169 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.81 contractors.
- Breakdown by bidding field: Goods 36.17%, Construction 30.32%, Consultancy 11.44%, Non-consultancy 7.00%, Mixed 15.07%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,418,591,717,453 VND, of which the total winning bid value is: 5,090,411,330,301 VND.
- The savings rate is: 6.06%.
Data analysis results of DauThau.info software for project owners HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION as follows:
- Has relationships with 703 contractors.
- The average number of contractors participating in each bidding package is: 2.81 contractors.
- Proportion of bidding fields: Goods 36.17%, Construction 30.32%, Consulting 11.44%, Non-consulting 7.00%, Mixed 15.07%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,418,591,717,453 VND, in which the total winning value is: 5,090,411,330,301 VND.
- The savings rate is: 6.06%.
You need to Login or Sign up to view all informations.
- Participated in 142 bidding packages, of which 142 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 35.93% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.18% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (113), Undefined (29)
- Provinces before the merger where the contractor has participated in bidding : Hải Dương (112), Undefined (30)
- Has relationships with 9 Bid Solicitors
- Has relationships with 10 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 93 bidding packages with 21 roles.
- Name of construction organization: Công ty TNHH Một thành viên Điện lực Hải Dương
- Code of capacity certificate of construction activities: 00029737
- Issuer: Sở kế hoạch và Đầu tư tỉnh Hải Dương
- Fields:
⚬ Khảo sát xây dựng:
⚬ Giám sát thi công xây dựng công trình: Dân dụng, Công nghiệp (Đường dây và Trạm biến áp )
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp (Đường dây và Trạm biến áp)
⚬ Thi công xây dựng công trình: Công nghiệp (Đường dây và Trạm biến áp)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Repairing the lower -voltage mid -voltage line in 2025 (phase 3) of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
16/09/2025 09:22
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Repairing Lower Lower Line of Kim Thanh District in 2025 (phase 3) of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: XUANDUC JOINT STOCK COMPANY
11/09/2025 14:24
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package The third completed project audit of 2025 of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: UNISTARS INTERNATIONAL AUDITING COMPANY LIMITED
08/09/2025 08:45
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Supervision of construction and installation of materials and equipment of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: THAI HUNG CONSTRUCTION AND TRADING JOINT STOCK COMPANY
04/09/2025 16:28
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Supervision of construction and installation of materials and equipment of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: DIEN VIET CONSULTANT, CONSTRUCTION AND SERVICE JOINT STOCK COMPANY
04/09/2025 16:27
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Great tu, repair MBA T3 T3 Station 110kV Dong Nien, T1 Station 110kV Ngoc Son of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: THU DUC TRANSFORMER JOINT STOCK COMPANY
04/09/2025 15:49
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Auditing project completed 6th in 2025 of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
03/09/2025 15:53
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Audit of the 4th completed project in 2025 of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: UNISTARS INTERNATIONAL AUDITING COMPANY LIMITED
03/09/2025 15:52
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Consulting package: Supervision of construction and installation of materials and equipment for the project: new construction of medium -voltage routes after 110kV tba of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: INFRASTRUCTURE TECHNICAL & ELECTRICITY CONSTRUCTION INVESTMENT CONSULTANCE JOINT STOCK COMPANY
30/08/2025 09:53
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Consulting package: Supervision of construction and installation of materials and equipment for the project: Building medium voltage lines, western distribution teams and renovating the voltage grid of Chi Linh City in 2025 of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: VIPOWER JOINT STOCK COMPANY
30/08/2025 09:51
The data sheet has been partially hidden, to see the full information please Login or Register
HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION announced the results of the bid package Repairing the lower -voltage mid -voltage line in 2025 (phase 3) .
- Winning bidder:
16/09/2025 09:22
HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION announced the results of the bid package Repairing Lower Lower Line of Kim Thanh District in 2025 (phase 3) .
- Winning bidder: XUANDUC JOINT STOCK COMPANY
11/09/2025 14:24
HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION announced the results of the bid package The third completed project audit of 2025 .
- Winning bidder: RSM VIETNAM AUDITING & CONSULTING COMPANY LIMITED, UNISTARS INTERNATIONAL AUDITING COMPANY LIMITED
08/09/2025 08:45
HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION announced the results of the bid package Supervision of construction and installation of materials and equipment .
- Winning bidder: THAI HUNG CONSTRUCTION AND TRADING JOINT STOCK COMPANY
04/09/2025 16:28
HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION announced the results of the bid package Supervision of construction and installation of materials and equipment .
- Winning bidder: DIEN VIET CONSULTANT, CONSTRUCTION AND SERVICE JOINT STOCK COMPANY
04/09/2025 16:27
HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION announced the results of the bid package Great tu, repair MBA T3 T3 Station 110kV Dong Nien, T1 Station 110kV Ngoc Son .
- Winning bidder: THU DUC TRANSFORMER JOINT STOCK COMPANY
04/09/2025 15:49
HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION announced the results of the bid package Auditing project completed 6th in 2025 .
- Winning bidder: VIET NAM AUDITING AND VALUATION COMPANY LIMITED
03/09/2025 15:53
HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION announced the results of the bid package Audit of the 4th completed project in 2025 .
- Winning bidder: UNISTARS INTERNATIONAL AUDITING COMPANY LIMITED
03/09/2025 15:52
HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION announced the results of the bid package Consulting package: Supervision of construction and installation of materials and equipment for the project: new construction of medium -voltage routes after 110kV tba .
- Winning bidder: INFRASTRUCTURE TECHNICAL & ELECTRICITY CONSTRUCTION INVESTMENT CONSULTANCE JOINT STOCK COMPANY
30/08/2025 09:53
HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION announced the results of the bid package Consulting package: Supervision of construction and installation of materials and equipment for the project: Building medium voltage lines, western distribution teams and renovating the voltage grid of Chi Linh City in 2025 .
- Winning bidder: VIPOWER JOINT STOCK COMPANY
30/08/2025 09:51
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Repairing the lower -voltage mid -voltage line in 2025 (phase 3) of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
16/09/2025 09:22
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Repairing Lower Lower Line of Kim Thanh District in 2025 (phase 3) of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: XUANDUC JOINT STOCK COMPANY
11/09/2025 14:24
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package The third completed project audit of 2025 of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: UNISTARS INTERNATIONAL AUDITING COMPANY LIMITED
08/09/2025 08:45
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Supervision of construction and installation of materials and equipment of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: THAI HUNG CONSTRUCTION AND TRADING JOINT STOCK COMPANY
04/09/2025 16:28
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Supervision of construction and installation of materials and equipment of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: DIEN VIET CONSULTANT, CONSTRUCTION AND SERVICE JOINT STOCK COMPANY
04/09/2025 16:27
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Great tu, repair MBA T3 T3 Station 110kV Dong Nien, T1 Station 110kV Ngoc Son of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: THU DUC TRANSFORMER JOINT STOCK COMPANY
04/09/2025 15:49
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Auditing project completed 6th in 2025 of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
03/09/2025 15:53
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Audit of the 4th completed project in 2025 of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: UNISTARS INTERNATIONAL AUDITING COMPANY LIMITED
03/09/2025 15:52
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Consulting package: Supervision of construction and installation of materials and equipment for the project: new construction of medium -voltage routes after 110kV tba of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: INFRASTRUCTURE TECHNICAL & ELECTRICITY CONSTRUCTION INVESTMENT CONSULTANCE JOINT STOCK COMPANY
30/08/2025 09:53
The Bid solicitor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has posted the results of the bidding package Consulting package: Supervision of construction and installation of materials and equipment for the project: Building medium voltage lines, western distribution teams and renovating the voltage grid of Chi Linh City in 2025 of the investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION.
- Winning bidder: VIPOWER JOINT STOCK COMPANY
30/08/2025 09:51
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION is the investor of 118 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION is the owner of 1839 contractor selection plan. In which, they self-invite 1839 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION is the investor of 1128 package, of which 1016 package is self-invited, other units invite bid 112 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION is the owner of 1764 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor HAI DUONG POWER COMPANY LIMITED - NORTHERN POWER CORPORATION is an investor with 703 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.