Data analysis results of DauThau.info software for project owners Hai Phong Bridge Projects Management Department as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 228 contractors.
- Announced 55 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 184 contractor selection plans with a total of 710 bidding packages, of which 84 prequalification documents have not found the investment project
- Has invited bids for 199 packages (with 228 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 648 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 460 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 151 packages that have not fully posted the contractor selection results. Of these 141 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.18 contractors.
- Breakdown by bidding field: Goods 0.43%, Construction 30.34%, Consultancy 63.68%, Non-consultancy 5.56%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 20,778,390,066,842 VND, of which the total winning bid value is: 18,901,319,793,975 VND.
- The savings rate is: 9.03%.
Data analysis results of DauThau.info software for project owners Hai Phong Bridge Projects Management Department as follows:
- Has relationships with 228 contractors.
- The average number of contractors participating in each bidding package is: 2.18 contractors.
- Proportion of bidding fields: Goods 0.43%, Construction 30.34%, Consulting 63.68%, Non-consulting 5.56%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 20,778,390,066,842 VND, in which the total winning value is: 18,901,319,793,975 VND.
- The savings rate is: 9.03%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 15: Consulting and supervision of surveying the design and implementation steps after the basic design of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: HAIPHONG TRANSPORT & COMMUNICATION CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY
06/01/2026 17:55
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 13: Consulting to verify tasks and estimates of consulting bidding packages of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: TAN PHONG ENGINEERING & CONSTRUCTION JOINT STOCK COMAPNY
06/01/2026 17:45
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 12: Consulting on setting up tasks and estimates for consulting bidding packages of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: VITEC ENGINEERING JOINT STOCK COMPANY
06/01/2026 17:37
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 13: Consulting to verify tasks and estimates of consulting bidding packages of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: CONSULTANCY AND CONSTRUCTION LIMITED COMPANY OF UNIVERSITY OF TRANSPORT AND COMMUNICATIONS
06/01/2026 08:58
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 12: Consulting on setting up tasks and estimates for consulting bidding packages of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: AIRPORT DESIGN AND CONSTRUCTION CONSULTANCY ONE MEMBER LIMITED LIABILITY COMPANY ADCC
06/01/2026 08:53
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Package No. 8: Construction work of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: HAI PHONG URBAN CONSTRUCTION JOINT STOCK COMPANY (HUCOM)
05/01/2026 18:19
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Package No. 11: Consulting on preparing construction drawing design documents of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: HAIPHONG TRANSPORT & COMMUNICATION CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY
05/01/2026 18:13
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 1: Consulting on task setting and cost estimates of consulting work during the project preparation phase of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: TAN PHONG ENGINEERING & CONSTRUCTION JOINT STOCK COMAPNY
01/01/2026 16:02
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 2: Consulting on task verification and cost estimates of consulting work during the project preparation phase of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: VITEC ENGINEERING JOINT STOCK COMPANY
01/01/2026 15:59
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the request KHLCNT prepares Ninh Binh - Hai Phong Expressway Project (CT08) to complete the expressway and connect to provincial road 353 (21.7km) of the investor Hai Phong Bridge Projects Management Department with 2 bidding package.
01/01/2026 15:41
The data sheet has been partially hidden, to see the full information please Login or Register
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 33: Independent audit consultancy .
- Winning bidder: KDG VIET NAM AUDITING COMPANY LIMITED
09/12/2025 11:41
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 31: Consulting on traffic safety verification .
- Winning bidder: CONSULTANCY AND CONSTRUCTION LIMITED COMPANY OF UNIVERSITY OF TRANSPORT AND COMMUNICATIONS
09/12/2025 11:25
Hai Phong Bridge Projects Management Department publishes the plan KHLCNT Construction Nguyen Trai Bridge with 21 bidding package .
30/11/2025 09:17
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 21: Control experiments during the construction process .
- Winning bidder: BACH DANG TESTING SURVEY AND CONSTRUCTION JOINT STOCK COMPANY
10/10/2025 18:25
Hai Phong Bridge Projects Management Department announced the results of the bid package Bidding package 13: Environmental monitoring and monitoring consultancy during the construction process .
- Winning bidder: HAI VIET ENVIRONMENT TECHNOLOGY JOINT STOCK COMPANY
03/10/2025 14:42
Hai Phong Bridge Projects Management Department announced the results of the bid package Package 23: Independent audit consultancy .
- Winning bidder: VIETNAM AVN AUDITING LIMITED COMPANY
16/09/2025 20:43
Hai Phong Bridge Projects Management Department announced the results of the bid package Package 18: Auditing Consulting .
- Winning bidder: THAI DUONG AUDIT COMPANY LIMITED
16/09/2025 20:40
Hai Phong Bridge Projects Management Department publishes the plan KHLCNT implements investment projects on construction of roads from provincial road 354 Tien Lang district to Highway 10 of Vinh Bao district with 15 bidding package .
15/09/2025 12:04
Hai Phong Bridge Projects Management Department publishes the plan KHLCNT the remaining bidding packages of the project of overpass and the route to the bridge with 5 bidding package .
11/09/2025 08:44
Hai Phong Bridge Projects Management Department announced the results of the bid package Package No. 7: Valuation of recovery materials .
- Winning bidder: VIET NAM VALUATION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY
25/08/2025 15:50
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 15: Consulting and supervision of surveying the design and implementation steps after the basic design of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: HAIPHONG TRANSPORT & COMMUNICATION CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY
06/01/2026 17:55
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 13: Consulting to verify tasks and estimates of consulting bidding packages of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: TAN PHONG ENGINEERING & CONSTRUCTION JOINT STOCK COMAPNY
06/01/2026 17:45
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 12: Consulting on setting up tasks and estimates for consulting bidding packages of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: VITEC ENGINEERING JOINT STOCK COMPANY
06/01/2026 17:37
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 13: Consulting to verify tasks and estimates of consulting bidding packages of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: CONSULTANCY AND CONSTRUCTION LIMITED COMPANY OF UNIVERSITY OF TRANSPORT AND COMMUNICATIONS
06/01/2026 08:58
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 12: Consulting on setting up tasks and estimates for consulting bidding packages of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: AIRPORT DESIGN AND CONSTRUCTION CONSULTANCY ONE MEMBER LIMITED LIABILITY COMPANY ADCC
06/01/2026 08:53
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Package No. 8: Construction work of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: HAI PHONG URBAN CONSTRUCTION JOINT STOCK COMPANY (HUCOM)
05/01/2026 18:19
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Package No. 11: Consulting on preparing construction drawing design documents of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: HAIPHONG TRANSPORT & COMMUNICATION CONSTRUCTION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY
05/01/2026 18:13
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 1: Consulting on task setting and cost estimates of consulting work during the project preparation phase of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: TAN PHONG ENGINEERING & CONSTRUCTION JOINT STOCK COMAPNY
01/01/2026 16:02
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the results of the bidding package Bidding package No. 2: Consulting on task verification and cost estimates of consulting work during the project preparation phase of the investor Hai Phong Bridge Projects Management Department.
- Winning bidder: VITEC ENGINEERING JOINT STOCK COMPANY
01/01/2026 15:59
The Bid solicitor Hai Phong Bridge Projects Management Department has posted the request KHLCNT prepares Ninh Binh - Hai Phong Expressway Project (CT08) to complete the expressway and connect to provincial road 353 (21.7km) of the investor Hai Phong Bridge Projects Management Department with 2 bidding package.
01/01/2026 15:41
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Hai Phong Bridge Projects Management Department is the investor of 55 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Hai Phong Bridge Projects Management Department is the owner of 184 contractor selection plan. In which, they self-invite 127 of contractor selection plan, other units invite bids of 57 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Hai Phong Bridge Projects Management Department is the investor of 228 package, of which 186 package is self-invited, other units invite bid 42 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Hai Phong Bridge Projects Management Department is the owner of 648 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: The investor Hai Phong Bridge Projects Management Department has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Hai Phong Bridge Projects Management Department is an investor with 228 contractor. The data sheet has been partially hidden, to see the full information please Login or Register