Data analysis results of DauThau.info software for project owners Maritime project Management Unit as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 83 contractors.
- Announced 11 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 27 contractor selection plans with a total of 92 bidding packages, of which 8 prequalification documents have not found the investment project
- Has invited bids for 63 packages (with 78 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 86 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 25 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 21 packages that have not fully posted the contractor selection results. Of these 21 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.64 contractors.
- Breakdown by bidding field: Goods 2.56%, Construction 20.51%, Consultancy 61.54%, Non-consultancy 15.38%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,087,008,656,404 VND, of which the total winning bid value is: 4,587,316,495,554 VND.
- The savings rate is: 9.82%.
Data analysis results of DauThau.info software for project owners Maritime project Management Unit as follows:
- Has relationships with 83 contractors.
- The average number of contractors participating in each bidding package is: 2.64 contractors.
- Proportion of bidding fields: Goods 2.56%, Construction 20.51%, Consulting 61.54%, Non-consulting 15.38%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,087,008,656,404 VND, in which the total winning value is: 4,587,316,495,554 VND.
- The savings rate is: 9.82%.
You need to Login or Sign up to view all informations.
- Participated in 10 bidding packages, of which 10 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 94.61% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.46% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (3), TP.Hồ Chí Minh (2), Vĩnh Long (1), Quảng Trị (1), Đà Nẵng (1), Nghệ An (1), Khánh Hòa (1)
- Provinces before the merger where the contractor has participated in bidding : Hải Phòng (3), TP.Hồ Chí Minh (2), Trà Vinh (1), Quảng Trị (1), Đà Nẵng (1), Nghệ An (1), Khánh Hòa (1)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 31 bidding packages with 9 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Bidding Package NDS-TV02 Examining the pre-feasibility study report of the investor Maritime project Management Unit.
24/06/2025 16:03
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package NSS-TV02 bidding package for examining pre-feasibility study reports of the investor Maritime project Management Unit.
24/06/2025 16:01
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Bidding package CM-BH Insurance works Bidding package CM-XL05 of the investor Maritime project Management Unit.
11/06/2025 17:10
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Package CM-TV19 Consulting on environmental monitoring and supervision during construction (adjustment phase) of the investor Maritime project Management Unit.
30/05/2025 15:32
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Contract package SH2-TV10 Consulting on monitoring and evaluating the stability of shore protection embankments, stabilizing navigation channels and evaluating project effectiveness of the investor Maritime project Management Unit.
23/05/2025 11:19
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Package CM-XL05 Construction of dredging and transportation of dredged material for disposal (adjustment phase) of the investor Maritime project Management Unit.
22/05/2025 16:42
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Package CM-TV18 Construction supervision consultancy for package CM-XL05 of the investor Maritime project Management Unit.
22/05/2025 16:40
Bid solicitor Maritime project Management Unit has posted Tender Notice Package CM-XL05 Construction of dredging and transportation of dredged material for disposal (adjustment phase) of the investor Maritime project Management Unit with the form Open bidding.
11/04/2025 17:40
Bid solicitor Maritime project Management Unit has posted Tender Notice Package CM-TV19 Consulting on environmental monitoring and supervision during construction (adjustment phase) of the investor Maritime project Management Unit with the form Open bidding.
11/04/2025 15:04
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Package CM-AIS2 Providing AIS information services (adjustment phase) of the investor Maritime project Management Unit.
09/04/2025 11:07
The data sheet has been partially hidden, to see the full information please Login or Register
Maritime project Management Unit announced the results of the bid package Package 11: Environmental monitoring and monitoring consultancy during construction .
- Winning bidder: MIEN NAM CONSTRUCTION AND ENVIRONMENT CONSULTANT JOINT STOCK COMPANY, Institute of Science and Technology for Energy and Environment
18/07/2025 17:35
Maritime project Management Unit announced the results of the bid package Package 6: Construction and dredging and transporting dredging substances .
- Winning bidder: DUY LINH TRADING JOINT STOCK COMPANY
14/07/2025 11:08
Maritime project Management Unit announced the results of the bid package Package No. 5: Construction and dredging and transporting dredging substances .
- Winning bidder: CÔNG TY TNHH CƠ GIỚI MỸ DUNG
14/07/2025 10:57
Maritime project Management Unit announced the results of the bidding package Package 11: Environmental monitoring and monitoring consultancy during construction with 2 participating contractors .
01/07/2025 10:19
Maritime project Management Unit announced the results of the bidding package Tender package No 5: Construction and dredging and transporting dredging substances with 1 participating contractors .
26/06/2025 09:47
Maritime project Management Unit announced the results of the bid package Bidding Package NDS-TV02 Examining the pre-feasibility study report .
- Winning bidder: Institute of Transport Science and Technology
24/06/2025 16:03
Maritime project Management Unit announced the results of the bid package NSS-TV02 bidding package for examining pre-feasibility study reports .
- Winning bidder: Institute of Transport Science and Technology
24/06/2025 16:01
Maritime project Management Unit publishes Tender Notice Tender package No 5: Construction and dredging and transporting dredging substances in the form Open bidding .
17/06/2025 13:47
Maritime project Management Unit publishes Tender Notice Package 11: Environmental monitoring and monitoring consultancy during construction in the form Open bidding .
12/06/2025 17:42
Maritime project Management Unit announced the results of the bid package Bidding package CM-BH Insurance works Bidding package CM-XL05 .
- Winning bidder: Post - Telecommunication Joint - Stock Insurance Corporation, Agriculture Bank Insurance Joint Stock Corporation, Vietinbank Insurance, military insurance corporation
11/06/2025 17:10
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Bidding Package NDS-TV02 Examining the pre-feasibility study report of the investor Maritime project Management Unit.
24/06/2025 16:03
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package NSS-TV02 bidding package for examining pre-feasibility study reports of the investor Maritime project Management Unit.
24/06/2025 16:01
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Bidding package CM-BH Insurance works Bidding package CM-XL05 of the investor Maritime project Management Unit.
11/06/2025 17:10
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Package CM-TV19 Consulting on environmental monitoring and supervision during construction (adjustment phase) of the investor Maritime project Management Unit.
30/05/2025 15:32
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Contract package SH2-TV10 Consulting on monitoring and evaluating the stability of shore protection embankments, stabilizing navigation channels and evaluating project effectiveness of the investor Maritime project Management Unit.
23/05/2025 11:19
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Package CM-XL05 Construction of dredging and transportation of dredged material for disposal (adjustment phase) of the investor Maritime project Management Unit.
22/05/2025 16:42
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Package CM-TV18 Construction supervision consultancy for package CM-XL05 of the investor Maritime project Management Unit.
22/05/2025 16:40
Bid solicitor Maritime project Management Unit has posted Tender Notice Package CM-XL05 Construction of dredging and transportation of dredged material for disposal (adjustment phase) of the investor Maritime project Management Unit with the form Open bidding.
11/04/2025 17:40
Bid solicitor Maritime project Management Unit has posted Tender Notice Package CM-TV19 Consulting on environmental monitoring and supervision during construction (adjustment phase) of the investor Maritime project Management Unit with the form Open bidding.
11/04/2025 15:04
The Bid solicitor Maritime project Management Unit has posted the results of the bidding package Package CM-AIS2 Providing AIS information services (adjustment phase) of the investor Maritime project Management Unit.
09/04/2025 11:07
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Maritime project Management Unit is the investor of 11 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Maritime project Management Unit is the owner of 27 contractor selection plan. In which, they self-invite 27 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Maritime project Management Unit is the investor of 78 package, of which 78 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Maritime project Management Unit is the owner of 86 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Maritime project Management Unit has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Maritime project Management Unit is an investor with 83 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.