Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners National Power Transmission Corporation as follows:
- Has relationships with 23 bid solicitors.
- Has relationships with 530 contractors.
- Announced 450 development investment project, of which 51 projects that have not announced the contractor selection plan.
- Announced 2395 contractor selection plans with a total of 7869 bidding packages, of which 1176 prequalification documents have not found the investment project
- Has invited bids for 1974 packages (with 2168 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 56 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 14 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 4778 packages that have not fully posted the contractor selection results. Of these 4479 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.45 contractors.
- Breakdown by bidding field: Goods 33.16%, Construction 14.99%, Consultancy 35.24%, Non-consultancy 15.82%, Mixed 0.78%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 273,150,532,068 VND, of which the total winning bid value is: 250,324,191,631 VND.
- The savings rate is: 8.36%.
Data analysis results of DauThau.info software for project owners National Power Transmission Corporation as follows:
- Has relationships with 530 contractors.
- The average number of contractors participating in each bidding package is: 2.45 contractors.
- Proportion of bidding fields: Goods 33.16%, Construction 14.99%, Consulting 35.24%, Non-consulting 15.82%, Mixed 0.78%, Other 0%.
- The total value according to the bidding package with valid IMP is: 273,150,532,068 VND, in which the total winning value is: 250,324,191,631 VND.
- The savings rate is: 8.36%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 1, Sub-project of Relocation of electrical works with voltage levels of 220kV and 500kV belonging to the power grid of Power Transmission Company 1 in Hanoi City (Belonging to the Lao Cai - Hanoi - Hai Phong railway construction investment project) of the investor National Power Transmission Corporation with 3 bidding package.
05/01/2026 11:22
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 4 of project: Hai Hau 220kV transformer station and connection line of the investor National Power Transmission Corporation with 2 bidding package.
31/12/2025 14:57
The Bid solicitor National Power Transmission Corporation has posted the request KHLCNT Phase 3 - Project: 220kV Nhon Hoi transformer station and Phuoc An - Nhon Hoi connection line of the investor National Power Transmission Corporation with 4 bidding package.
29/12/2025 14:56
The Bid solicitor National Power Transmission Corporation has posted the request Adjusting the contractor selection plan for phase 2 of the project: Ung Hoa 220kV transformer station and connection lines of the investor National Power Transmission Corporation with 4 bidding package.
29/12/2025 10:17
The Bid solicitor National Power Transmission Corporation has posted the request Phase 1 contractor selection plan Project: Additional installation of 110kV horizontal capacitors on the transmission grid in 2026 of the investor National Power Transmission Corporation with 2 bidding package.
28/12/2025 11:28
The Bid solicitor National Power Transmission Corporation has posted the request Phase 1 contractor selection plan Project: Additional installation of 110kV horizontal capacitors on the transmission grid in 2026 of the investor National Power Transmission Corporation with 2 bidding package.
28/12/2025 10:59
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 1 Project: Bac Giang 500kV transformer station and connecting 500kV - 220kV line of the investor National Power Transmission Corporation with 2 bidding package.
26/12/2025 11:27
The Bid solicitor National Power Transmission Corporation has posted the request Phase 1 contractor selection plan Project: 500kV LNG Nghi Son - LNG Quynh Lap line of the investor National Power Transmission Corporation with 2 bidding package.
26/12/2025 11:14
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 1 Project: Son La 1 - Son Tay 500kV line of the investor National Power Transmission Corporation with 2 bidding package.
26/12/2025 08:45
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 6 of the project: Thai Binh 500 kV transformer station and connection of the investor National Power Transmission Corporation with 1 bidding package.
23/12/2025 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
National Power Transmission Corporation publishes the plan KHLCNT Phase 3 - Project: 220 kV Huoi Quang - Nghia Lo line with 1 bidding package .
19/12/2025 08:06
National Power Transmission Corporation publishes the plan Technical planning phase 3 (Package 23: Audit) project D2 Rach Gia - Kien Binh circuit 2 with 1 bidding package .
21/10/2025 16:32
National Power Transmission Corporation publishes the plan Project planning phase 4 (Audit package) with 1 bidding package .
10/10/2025 15:54
National Power Transmission Corporation publishes the plan Approving the plan to select contractor phase 3 of the project: Install 06 compartments for 220kV of 500kV Western Hanoi Transformer Station with 8 bidding package .
01/10/2025 14:32
National Power Transmission Corporation publishes the plan Approve the 3rd phase contractor selection plan: Song Cong 220kV transformer station and connection line with 11 bidding package .
06/08/2025 15:04
National Power Transmission Corporation publishes the plan KHLCNT phase 3 Project DD 220KV LT-CNC with 2 bidding package .
26/06/2025 14:29
National Power Transmission Corporation publishes the plan Plan for selecting contractor phase 3 - 500 kV Bac Ninh transformer station project and connection line with 14 bidding package .
26/06/2025 14:27
National Power Transmission Corporation publishes the plan Plan for selecting contractor phase 3 - 500 kV Bac Ninh transformer station project and connection line with 13 bidding package .
26/06/2025 09:38
National Power Transmission Corporation publishes the plan Plan for selection of contractor 2 - Project: 220 kV transformer station Nhon Hoi and Phuoc An - Nhon Hoi connection line with 1 bidding package .
25/06/2025 10:31
National Power Transmission Corporation publishes the plan Contractor selection plan (Package: Consulting on making documents approving the investment policy) The 500kV Son Tay Transformer Station Project and 500kV - 220kV line connecting with 1 bidding package .
24/06/2025 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 1, Sub-project of Relocation of electrical works with voltage levels of 220kV and 500kV belonging to the power grid of Power Transmission Company 1 in Hanoi City (Belonging to the Lao Cai - Hanoi - Hai Phong railway construction investment project) of the investor National Power Transmission Corporation with 3 bidding package.
05/01/2026 11:22
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 4 of project: Hai Hau 220kV transformer station and connection line of the investor National Power Transmission Corporation with 2 bidding package.
31/12/2025 14:57
The Bid solicitor National Power Transmission Corporation has posted the request KHLCNT Phase 3 - Project: 220kV Nhon Hoi transformer station and Phuoc An - Nhon Hoi connection line of the investor National Power Transmission Corporation with 4 bidding package.
29/12/2025 14:56
The Bid solicitor National Power Transmission Corporation has posted the request Adjusting the contractor selection plan for phase 2 of the project: Ung Hoa 220kV transformer station and connection lines of the investor National Power Transmission Corporation with 4 bidding package.
29/12/2025 10:17
The Bid solicitor National Power Transmission Corporation has posted the request Phase 1 contractor selection plan Project: Additional installation of 110kV horizontal capacitors on the transmission grid in 2026 of the investor National Power Transmission Corporation with 2 bidding package.
28/12/2025 11:28
The Bid solicitor National Power Transmission Corporation has posted the request Phase 1 contractor selection plan Project: Additional installation of 110kV horizontal capacitors on the transmission grid in 2026 of the investor National Power Transmission Corporation with 2 bidding package.
28/12/2025 10:59
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 1 Project: Bac Giang 500kV transformer station and connecting 500kV - 220kV line of the investor National Power Transmission Corporation with 2 bidding package.
26/12/2025 11:27
The Bid solicitor National Power Transmission Corporation has posted the request Phase 1 contractor selection plan Project: 500kV LNG Nghi Son - LNG Quynh Lap line of the investor National Power Transmission Corporation with 2 bidding package.
26/12/2025 11:14
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 1 Project: Son La 1 - Son Tay 500kV line of the investor National Power Transmission Corporation with 2 bidding package.
26/12/2025 08:45
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 6 of the project: Thai Binh 500 kV transformer station and connection of the investor National Power Transmission Corporation with 1 bidding package.
23/12/2025 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor National Power Transmission Corporation is the investor of 450 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor National Power Transmission Corporation is the owner of 2395 contractor selection plan. In which, they self-invite 515 of contractor selection plan, other units invite bids of 1880 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor National Power Transmission Corporation is the investor of 2168 package, of which 56 package is self-invited, other units invite bid 2112 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor National Power Transmission Corporation is the owner of 56 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor National Power Transmission Corporation has a relationship with 23 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor National Power Transmission Corporation is an investor with 530 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.