Data analysis results of DauThau.info software for project owners Power Transmission Company 4 as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 695 contractors.
- Announced 2 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 1961 contractor selection plans with a total of 2436 bidding packages, of which 1953 prequalification documents have not found the investment project
- Has invited bids for 1811 packages (with 1879 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 1826 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 390 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 785 packages that have not fully posted the contractor selection results. Of these 553 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.60 contractors.
- Breakdown by bidding field: Goods 49.28%, Construction 24.53%, Consultancy 7.29%, Non-consultancy 18.89%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 4,380,345,561,110 VND, of which the total winning bid value is: 3,338,235,249,870 VND.
- The savings rate is: 23.79%.
Data analysis results of DauThau.info software for project owners Power Transmission Company 4 as follows:
- Has relationships with 695 contractors.
- The average number of contractors participating in each bidding package is: 2.60 contractors.
- Proportion of bidding fields: Goods 49.28%, Construction 24.53%, Consulting 7.29%, Non-consulting 18.89%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 4,380,345,561,110 VND, in which the total winning value is: 3,338,235,249,870 VND.
- The savings rate is: 23.79%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Power Transmission Company 4 has posted the request Transporting and treating MBA contaminated with PCB company Materials of the investor Power Transmission Company 4 with 1 bidding package.
08/09/2025 17:00
The Bid solicitor Power Transmission Company 4 has posted the request Works: Repairing the operation management team of Vung Tau line under the regular repair plan 2025 of the investor Power Transmission Company 4 with 1 bidding package.
29/08/2025 10:08
The Bid solicitor Power Transmission Company 4 has posted the request Plan to select the 1st contractor of the project: Enhance the ability to load 220kV Phu My - Tan Thanh of the investor Power Transmission Company 4 with 2 bidding package.
29/08/2025 09:50
The Bid solicitor Power Transmission Company 4 has posted the request Prepare information security level of 07 information systems under the Project upgrading the protection control system (Ban AMN Project Management) of the investor Power Transmission Company 4 with 1 bidding package.
26/08/2025 18:01
The Bid solicitor Power Transmission Company 4 has posted the request Repairing the system of tie the 220kV lines of the Electrical Transmission Teams of the SCL 2025 plan of the investor Power Transmission Company 4 with 1 bidding package.
22/08/2025 11:12
The Bid solicitor Power Transmission Company 4 has posted the request Network security evaluation for typical technology TBA of the investor Power Transmission Company 4 with 1 bidding package.
22/08/2025 11:04
The Bid solicitor Power Transmission Company 4 has posted the request Project: Repair 09 office, 09 WC rooms, waterproofing, roofs, slaves, replacement plaster ceiling corridor Tay Ninh Power Transmission team under regular repair plan in 2025 of the investor Power Transmission Company 4 with 1 bidding package.
21/08/2025 14:23
The Bid solicitor Power Transmission Company 4 has posted the request The works of the Electrical Experimental Repair Team 4 of the investor Power Transmission Company 4 with 3 bidding package.
21/08/2025 10:17
The Bid solicitor Power Transmission Company 4 has posted the request Providing supplies and equipment for large repair works in 2026 phase 3 of the investor Power Transmission Company 4 with 1 bidding package.
11/08/2025 16:22
The Bid solicitor Power Transmission Company 4 has posted the request Buy 110kV, 220kV lightning protection for backup goods EVNNPT of the investor Power Transmission Company 4 with 1 bidding package.
08/08/2025 16:06
The data sheet has been partially hidden, to see the full information please Login or Register
Power Transmission Company 4 publishes the plan Replace the 274 -phase cutting machine for GE T&D India Limited with 1 bidding package .
19/06/2025 17:12
Power Transmission Company 4 publishes the plan The list of 05-seat Ford Ranger (0.75T pickup), license plate 51D-373.37, card number: TT4-202410172, Code: 1,310202.1000198. Category: Making copper, painting part of the barrel, chassi and car cabin; Replace the right ceiling lights and rear steering lights, make mattress tape, replace the cabin and the cabin floor, replace the body, replace the tray, replace the tray, take the ball, remove the momentum, restore the pigs + bum, replace the right door soaked lock, replace the back glass of the right door, restore the back door of the rear box frame, close the silver + back of the back door, replace the back of the stuff, replace the back of the door, replace the back of the door, replace the back of the door, replace the back of the door. After, paint the tray, change the leaves of the car wiper with 1 bidding package .
18/06/2025 12:18
Power Transmission Company 4 publishes the plan Replace the screen of 87B TC C22 relay 500kV Duyen Hai station damaged, not guaranteed to operate, with 1 bidding package .
17/06/2025 15:17
Power Transmission Company 4 publishes the plan Repair the number 1 loader brand, CR188 HPT N100 220C - 220kV Tra Vinh station with 1 bidding package .
17/06/2025 15:11
Power Transmission Company 4 publishes the plan Repair zoom camera integrated zenmuse H20T thermal camera H20T UAV MATRICE 300RTK Flight Equipment belongs to Western Power Transmission 1 with 1 bidding package .
12/06/2025 14:14
Power Transmission Company 4 publishes the plan Connecting daily -life wastewater for 220kV Binh Hoa station with 1 bidding package .
11/06/2025 14:38
Power Transmission Company 4 publishes the plan Replace the relay to choose the time of switching the damaged K502 cutting machine - 500kV Chon transformer station with 1 bidding package .
10/06/2025 10:02
Power Transmission Company 4 publishes the plan Equipped with personal protective equipment of Western Power Transmission 2 years 2025 with 1 bidding package .
09/06/2025 09:11
Power Transmission Company 4 publishes the plan Paint the Fire Prevention and Fighting System of 500KV My Tho Station faded, peeling paint. with 1 bidding package .
09/06/2025 09:02
Power Transmission Company 4 publishes the plan Equipped with personal protective equipment of Western Power Transmission 1 year 2025 with 1 bidding package .
06/06/2025 09:59
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Power Transmission Company 4 has posted the request Transporting and treating MBA contaminated with PCB company Materials of the investor Power Transmission Company 4 with 1 bidding package.
08/09/2025 17:00
The Bid solicitor Power Transmission Company 4 has posted the request Works: Repairing the operation management team of Vung Tau line under the regular repair plan 2025 of the investor Power Transmission Company 4 with 1 bidding package.
29/08/2025 10:08
The Bid solicitor Power Transmission Company 4 has posted the request Plan to select the 1st contractor of the project: Enhance the ability to load 220kV Phu My - Tan Thanh of the investor Power Transmission Company 4 with 2 bidding package.
29/08/2025 09:50
The Bid solicitor Power Transmission Company 4 has posted the request Prepare information security level of 07 information systems under the Project upgrading the protection control system (Ban AMN Project Management) of the investor Power Transmission Company 4 with 1 bidding package.
26/08/2025 18:01
The Bid solicitor Power Transmission Company 4 has posted the request Repairing the system of tie the 220kV lines of the Electrical Transmission Teams of the SCL 2025 plan of the investor Power Transmission Company 4 with 1 bidding package.
22/08/2025 11:12
The Bid solicitor Power Transmission Company 4 has posted the request Network security evaluation for typical technology TBA of the investor Power Transmission Company 4 with 1 bidding package.
22/08/2025 11:04
The Bid solicitor Power Transmission Company 4 has posted the request Project: Repair 09 office, 09 WC rooms, waterproofing, roofs, slaves, replacement plaster ceiling corridor Tay Ninh Power Transmission team under regular repair plan in 2025 of the investor Power Transmission Company 4 with 1 bidding package.
21/08/2025 14:23
The Bid solicitor Power Transmission Company 4 has posted the request The works of the Electrical Experimental Repair Team 4 of the investor Power Transmission Company 4 with 3 bidding package.
21/08/2025 10:17
The Bid solicitor Power Transmission Company 4 has posted the request Providing supplies and equipment for large repair works in 2026 phase 3 of the investor Power Transmission Company 4 with 1 bidding package.
11/08/2025 16:22
The Bid solicitor Power Transmission Company 4 has posted the request Buy 110kV, 220kV lightning protection for backup goods EVNNPT of the investor Power Transmission Company 4 with 1 bidding package.
08/08/2025 16:06
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Transmission Company 4 is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Power Transmission Company 4 is the owner of 1961 contractor selection plan. In which, they self-invite 1938 of contractor selection plan, other units invite bids of 23 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Power Transmission Company 4 is the investor of 1879 package, of which 1818 package is self-invited, other units invite bid 61 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Transmission Company 4 is the owner of 1826 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: The investor Power Transmission Company 4 has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Transmission Company 4 is an investor with 695 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.