Data analysis results of DauThau.info software for project owners Power Transmission Company No 3 as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 383 contractors.
- Announced 27 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 26 contractor selection plans with a total of 59 bidding packages, of which 20 prequalification documents have not found the investment project
- Has invited bids for 410 packages (with 428 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 376 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 18 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 10 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.51 contractors.
- Breakdown by bidding field: Goods 42.89%, Construction 20.51%, Consultancy 18.18%, Non-consultancy 18.18%, Mixed 0.23%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 841,686,516,915 VND, of which the total winning bid value is: 721,338,469,532 VND.
- The savings rate is: 14.30%.
Data analysis results of DauThau.info software for project owners Power Transmission Company No 3 as follows:
- Has relationships with 383 contractors.
- The average number of contractors participating in each bidding package is: 2.51 contractors.
- Proportion of bidding fields: Goods 42.89%, Construction 20.51%, Consulting 18.18%, Non-consulting 18.18%, Mixed 0.23%, Other 0%.
- The total value according to the bidding package with valid IMP is: 841,686,516,915 VND, in which the total winning value is: 721,338,469,532 VND.
- The savings rate is: 14.30%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor Power Transmission Company No 3 has posted Tender Notice Package 01/SCL2025/DKH: Repairing foundation embankments and drainage ditches of 220kV lines managed and operated by Khanh Hoa Power Transmission Team of the investor Power Transmission Company No 3 with the form Open bidding.
31/12/2025 19:05
Bid solicitor Power Transmission Company No 3 has posted Tender Notice Package 5: Audit of completed project settlement report of the investor Power Transmission Company No 3 with the form Open bidding.
31/12/2025 10:54
The Bid solicitor Power Transmission Company No 3 has posted the results of the bidding package Package 3/SCL2026/PTC3: CONSTRUCTION CONSULTING CONSULTING CONSTRUCTION, MAKE OF KTKT KT and Estimation of Repairing System of Cable Trit's Cable Station 220KV Krong Buk of the investor Power Transmission Company No 3.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5
31/12/2025 10:18
The Bid solicitor Power Transmission Company No 3 has posted the results of the bidding package Package 01/SCTX2025/DTTĐĐL: Installation of partitions and repair ditches to control 420KV Krong Buk transformer station of the investor Power Transmission Company No 3.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG 349
28/12/2025 22:04
The Bid solicitor Power Transmission Company No 3 has posted the results of the bidding package Package 15/SCL2026/PTC3: Providing meter computers for 500kV Vinh Tan, 220kV Ham Tan, 220kV Phan Thiet substations (Including installation and configuration services) of the investor Power Transmission Company No 3.
- Winning bidder: SAI GON INFORMATION AND NETWORKING TECHNOLOGY COMPANY LIMITED
26/12/2025 14:34
Power Transmission Company No 3 Posted Development Investment Project Equipped with a forklift forklift service for operation management, repair and troubleshooting for PTC3.
26/12/2025 11:11
Bid solicitor Power Transmission Company No 3 has posted Tender Notice Package 35/SCL2026/PTC3: Consulting on surveys, preparing technical plans, designing construction drawings and estimating items for handling ground phase gaps of 220kV lines managed and operated by Gia Lai Power Transmission Team of the investor Power Transmission Company No 3 with the form Open bidding.
24/12/2025 17:53
The Bid solicitor Power Transmission Company No 3 has posted the results of the bidding package Package 11/SCL2026/PTC3: Supply of lights and accessories and materials for lighting system TBA of the investor Power Transmission Company No 3.
- Winning bidder: CITY NUMBER ONE LIGHTING COMPANY LIMITED
23/12/2025 08:08
Bid solicitor Power Transmission Company No 3 has posted Tender Notice Package 31/SCL2026/PTC3: Repair of Toyota Hilux car with license plate 79C-05101 - belonging to Dak Lak Traffic Management Team of the investor Power Transmission Company No 3 with the form Competitive Offer.
19/12/2025 14:00
Bid solicitor Power Transmission Company No 3 has posted Tender Notice Package 06/SCL2026&SX/PTC3: Supply of primary equipment and accessories for 220kV, 500kV substations of the investor Power Transmission Company No 3 with the form Open bidding.
19/12/2025 07:25
The data sheet has been partially hidden, to see the full information please Login or Register
Power Transmission Company No 3 announced the results of the bid package Contract package: Procurement of 06 meters with 0.2s accuracy as backup for Vinh Tan 500kV station .
- Winning bidder: DAHA EQUIPMENT AND SCIENCE TECHNOLOGY JOINT STOCK COMPANY
15/12/2025 08:38
Power Transmission Company No 3 announced the results of the bid package 01/SCTX2025/DTTĐKH: Providing 220V DC battery .
- Winning bidder: TEKNIC TECHNOLOGY COMPANY LIMITED
03/12/2025 08:22
Power Transmission Company No 3 announced the results of the bid package Package 3: Supplying the installation of the most VTTB, secondary, configuration, construction of stations and construction insurance. .
- Winning bidder: THAI BINH DUONG CONSTRUCTION AND INSTALLTION AND INVESTMENT JOINT STOCK COMPANY
24/10/2025 16:44
Power Transmission Company No 3 announced the results of the bid package Package 06/SX2025/PTC3: Providing MBA storage .
- Winning bidder: CÔNG TY TNHH MERCURY ELECTRIK VIỆT NAM
10/10/2025 14:25
Power Transmission Company No 3 announced the results of the bid package Package 4: Providing construction supervision consultancy services and construction installation .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG SONG MÃ, CÔNG TY TNHH TƯ VẤN BÌNH MINH
30/08/2025 15:13
Power Transmission Company No 3 announced the results of the bid package Package 5: Providing construction supervision consultancy services .
- Winning bidder: CÔNG TY CỔ PHẦN TỔNG HỢP PHÚ TÀI PHÁT
28/08/2025 09:24
Power Transmission Company No 3 announced the results of the bidding package Package 3: Supplying the installation of the most VTTB, secondary, configuration, construction of stations and construction insurance. with 1 participating contractors .
18/08/2025 11:07
Power Transmission Company No 3 announced the results of the bid package Equipped with safety tools, construction tools for production in 2025 of PTC3 .
- Winning bidder: NHAT MINH INVESTMENT EXPORT IMPORT AND TECHNICAL SERVICES JOINT STOCK COMPANY
11/08/2025 16:52
Power Transmission Company No 3 announced the results of the bid package Equipped with office uniform EVNNPT in 2025 .
- Winning bidder: NHA BE GARMENT CORPORATION JOINT STOCK COMPANY
07/08/2025 11:05
Power Transmission Company No 3 announced the results of the bid package Package 2: VTTB backup for production - Line section .
- Winning bidder: VIET NAM TECHNIQUE DEVELOPMENT COMPANY LIMITED
06/08/2025 11:07
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Power Transmission Company No 3 has posted Tender Notice Package 01/SCL2025/DKH: Repairing foundation embankments and drainage ditches of 220kV lines managed and operated by Khanh Hoa Power Transmission Team of the investor Power Transmission Company No 3 with the form Open bidding.
31/12/2025 19:05
Bid solicitor Power Transmission Company No 3 has posted Tender Notice Package 5: Audit of completed project settlement report of the investor Power Transmission Company No 3 with the form Open bidding.
31/12/2025 10:54
The Bid solicitor Power Transmission Company No 3 has posted the results of the bidding package Package 3/SCL2026/PTC3: CONSTRUCTION CONSULTING CONSULTING CONSTRUCTION, MAKE OF KTKT KT and Estimation of Repairing System of Cable Trit's Cable Station 220KV Krong Buk of the investor Power Transmission Company No 3.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 5
31/12/2025 10:18
The Bid solicitor Power Transmission Company No 3 has posted the results of the bidding package Package 01/SCTX2025/DTTĐĐL: Installation of partitions and repair ditches to control 420KV Krong Buk transformer station of the investor Power Transmission Company No 3.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG 349
28/12/2025 22:04
The Bid solicitor Power Transmission Company No 3 has posted the results of the bidding package Package 15/SCL2026/PTC3: Providing meter computers for 500kV Vinh Tan, 220kV Ham Tan, 220kV Phan Thiet substations (Including installation and configuration services) of the investor Power Transmission Company No 3.
- Winning bidder: SAI GON INFORMATION AND NETWORKING TECHNOLOGY COMPANY LIMITED
26/12/2025 14:34
Power Transmission Company No 3 Posted Development Investment Project Equipped with a forklift forklift service for operation management, repair and troubleshooting for PTC3.
26/12/2025 11:11
Bid solicitor Power Transmission Company No 3 has posted Tender Notice Package 35/SCL2026/PTC3: Consulting on surveys, preparing technical plans, designing construction drawings and estimating items for handling ground phase gaps of 220kV lines managed and operated by Gia Lai Power Transmission Team of the investor Power Transmission Company No 3 with the form Open bidding.
24/12/2025 17:53
The Bid solicitor Power Transmission Company No 3 has posted the results of the bidding package Package 11/SCL2026/PTC3: Supply of lights and accessories and materials for lighting system TBA of the investor Power Transmission Company No 3.
- Winning bidder: CITY NUMBER ONE LIGHTING COMPANY LIMITED
23/12/2025 08:08
Bid solicitor Power Transmission Company No 3 has posted Tender Notice Package 31/SCL2026/PTC3: Repair of Toyota Hilux car with license plate 79C-05101 - belonging to Dak Lak Traffic Management Team of the investor Power Transmission Company No 3 with the form Competitive Offer.
19/12/2025 14:00
Bid solicitor Power Transmission Company No 3 has posted Tender Notice Package 06/SCL2026&SX/PTC3: Supply of primary equipment and accessories for 220kV, 500kV substations of the investor Power Transmission Company No 3 with the form Open bidding.
19/12/2025 07:25
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Transmission Company No 3 is the investor of 27 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Power Transmission Company No 3 is the owner of 26 contractor selection plan. In which, they self-invite 26 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Power Transmission Company No 3 is the investor of 428 package, of which 181 package is self-invited, other units invite bid 247 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Transmission Company No 3 is the owner of 376 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Power Transmission Company No 3 has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Power Transmission Company No 3 is an investor with 383 contractor. The data sheet has been partially hidden, to see the full information please Login or Register