Data analysis results of DauThau.info software for project owners Project Management Unit 1 as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 374 contractors.
- Announced 152 development investment project, of which 11 projects that have not announced the contractor selection plan.
- Announced 309 contractor selection plans with a total of 1462 bidding packages, of which 45 prequalification documents have not found the investment project
- Has invited bids for 342 packages (with 391 tender notices), conducted prequalification for 0 packages.
- Published 3 quotation requests.
- Announced the results of 1009 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 685 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 474 packages that have not fully posted the contractor selection results. Of these 463 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.14 contractors.
- Breakdown by bidding field: Goods 27.11%, Construction 45.27%, Consultancy 24.30%, Non-consultancy 0.26%, Mixed 3.07%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,915,497,028,533 VND, of which the total winning bid value is: 3,780,185,441,539 VND.
- The savings rate is: 3.46%.
Data analysis results of DauThau.info software for project owners Project Management Unit 1 as follows:
- Has relationships with 374 contractors.
- The average number of contractors participating in each bidding package is: 2.14 contractors.
- Proportion of bidding fields: Goods 27.11%, Construction 45.27%, Consulting 24.30%, Non-consulting 0.26%, Mixed 3.07%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,915,497,028,533 VND, in which the total winning value is: 3,780,185,441,539 VND.
- The savings rate is: 3.46%.
You need to Login or Sign up to view all informations.
- Participated in 10 bidding packages, of which 9 were won, 0 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 80% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.92% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Cần Thơ (5), Undefined (5)
- Provinces before the merger where the contractor has participated in bidding : Sóc Trăng (5), Undefined (5)
- Has relationships with 7 Bid Solicitors
- Has relationships with 6 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 105 bidding packages with 13 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 07: Procurement equipment of the investor Project Management Unit 1.
- Winning bidder: CTY TNHH TM DV TH NAM CHAU GIA
12/05/2026 08:30
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 01: Consulting for bidding documents, evaluating construction bids of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MTV XÂY DỰNG THƯƠNG MẠI VÀ DỊCH VỤ STD
23/04/2026 08:45
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 05: Equipment supervision consultancy of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ KIỂM ĐỊNH XÂY DỰNG HIỆP HÒA PHÁT
22/04/2026 17:36
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 04: Equipment valuation consultancy of the investor Project Management Unit 1.
- Winning bidder: TAM WIN CONSULTING AND VALUATION JOINT STOCK COMPANY
22/04/2026 17:28
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 02: Pile trial trial advice of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ KIỂM ĐỊNH XÂY DỰNG HIỆP HÒA PHÁT
22/04/2026 17:25
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 08: Construction insurance of the investor Project Management Unit 1.
- Winning bidder: Agriculture Bank Insurance Joint Stock Corporation
24/09/2025 15:28
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 03: Construction supervision consultancy of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG SÔNG TIỀN
24/09/2025 09:34
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 06: Construction supervision of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
09/09/2025 14:20
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 12: Supply and installation of equipment of the investor Project Management Unit 1.
04/09/2025 13:16
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 11: Construction work of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TIẾN PHÁT 3979
03/09/2025 15:00
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Unit 1 announced the results of the bid package Package No. 07: Procurement equipment .
- Winning bidder: CTY TNHH TM DV TH NAM CHAU GIA
12/05/2026 08:30
Project Management Unit 1 announced the results of the bid package Package No. 01: Consulting for bidding documents, evaluating construction bids .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MTV XÂY DỰNG THƯƠNG MẠI VÀ DỊCH VỤ STD
23/04/2026 08:45
Project Management Unit 1 announced the results of the bid package Package No. 05: Equipment supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ KIỂM ĐỊNH XÂY DỰNG HIỆP HÒA PHÁT
22/04/2026 17:36
Project Management Unit 1 announced the results of the bid package Package No. 04: Equipment valuation consultancy .
- Winning bidder: TAM WIN CONSULTING AND VALUATION JOINT STOCK COMPANY
22/04/2026 17:28
Project Management Unit 1 announced the results of the bid package Package No. 02: Pile trial trial advice .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ KIỂM ĐỊNH XÂY DỰNG HIỆP HÒA PHÁT
22/04/2026 17:25
Project Management Unit 1 announced the results of the bid package Package 08: Construction insurance .
- Winning bidder: Agriculture Bank Insurance Joint Stock Corporation
24/09/2025 15:28
Project Management Unit 1 announced the results of the bid package Package 03: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG SÔNG TIỀN
24/09/2025 09:34
Project Management Unit 1 announced the results of the bid package Package 06: Construction supervision .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
09/09/2025 14:20
Project Management Unit 1 announced the results of the bid package Package 12: Supply and installation of equipment .
- Winning bidder: VDI TECHNOLOGY JOINT STOCK COMPANY
04/09/2025 13:16
Project Management Unit 1 announced the results of the bid package Package No. 11: Construction work .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG PHÁT THUẬN THÀNH, CÔNG TY TNHH THỐNG NHẤT, CÔNG TY TNHH XÂY DỰNG TIẾN PHÁT 3979
03/09/2025 15:00
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 07: Procurement equipment of the investor Project Management Unit 1.
- Winning bidder: CTY TNHH TM DV TH NAM CHAU GIA
12/05/2026 08:30
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 01: Consulting for bidding documents, evaluating construction bids of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MTV XÂY DỰNG THƯƠNG MẠI VÀ DỊCH VỤ STD
23/04/2026 08:45
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 05: Equipment supervision consultancy of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ KIỂM ĐỊNH XÂY DỰNG HIỆP HÒA PHÁT
22/04/2026 17:36
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 04: Equipment valuation consultancy of the investor Project Management Unit 1.
- Winning bidder: TAM WIN CONSULTING AND VALUATION JOINT STOCK COMPANY
22/04/2026 17:28
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 02: Pile trial trial advice of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ KIỂM ĐỊNH XÂY DỰNG HIỆP HÒA PHÁT
22/04/2026 17:25
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 08: Construction insurance of the investor Project Management Unit 1.
- Winning bidder: Agriculture Bank Insurance Joint Stock Corporation
24/09/2025 15:28
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 03: Construction supervision consultancy of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG SÔNG TIỀN
24/09/2025 09:34
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 06: Construction supervision of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
09/09/2025 14:20
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 12: Supply and installation of equipment of the investor Project Management Unit 1.
04/09/2025 13:16
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 11: Construction work of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TIẾN PHÁT 3979
03/09/2025 15:00
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit 1 is the investor of 152 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Project owner Project Management Unit 1 has published 3 quotation requests. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Project Management Unit 1 is the owner of 309 contractor selection plan. In which, they self-invite 308 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Project Management Unit 1 is the investor of 391 package, of which 382 package is self-invited, other units invite bid 9 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit 1 is the owner of 1009 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Project Management Unit 1 has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Project Management Unit 1 is an investor with 374 contractor. The data sheet has been partially hidden, to see the full information please Login or Register