Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Song Bung Hydro Power Company as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 326 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 22 contractor selection plans with a total of 75 bidding packages, of which 22 prequalification documents have not found the investment project
- Has invited bids for 240 packages (with 245 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 261 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 40 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 13 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.00 contractors.
- Breakdown by bidding field: Goods 42.36%, Construction 12.23%, Consultancy 6.99%, Non-consultancy 38.43%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 331,172,712,735 VND, of which the total winning bid value is: 292,751,130,183 VND.
- The savings rate is: 11.60%.
Data analysis results of DauThau.info software for project owners Song Bung Hydro Power Company as follows:
- Has relationships with 326 contractors.
- The average number of contractors participating in each bidding package is: 3.00 contractors.
- Proportion of bidding fields: Goods 42.36%, Construction 12.23%, Consulting 6.99%, Non-consulting 38.43%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 331,172,712,735 VND, in which the total winning value is: 292,751,130,183 VND.
- The savings rate is: 11.60%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package No. 24-2022: Supply and installation of 2V-500Ah battery system for Song Bung 4 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: Công Ty Cổ Phần Xây Lắp Bưu Điện Miền Trung
23/11/2022 16:31
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package SCL03.3-2022: Overhauling 03 spillway supply gates, water intake valves and spillway cranes, water intake gates of Song Bung 4 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN ĐIỆN SÊ SAN 3A
07/11/2022 15:14
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package SCL03.1-2022: Overhaul 03 gate valves and repair valves for Song Bung 4 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN ĐIỆN SÊ SAN 3A
04/11/2022 16:56
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package SCL03.2-2022: Overhaul hydraulic equipment for spillway, water intake at Song Bung 4 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN ĐIỆN SÊ SAN 3A
04/11/2022 16:54
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package SCL01-2023: Consulting on surveying, preparing reports on safety assessment of excavation roofs in the pressure pipeline area, design, repair, reinforcement and renovation of 325m mechanical 315m and VH3 TC9 road area of Song Hydropower Plant Bung 2 of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 1
04/11/2022 14:02
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package No. 26-2022: Construction of wall and floor seepage treatment of Song Bung 2 Hydropower Plant and Song Bung 4 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI PHÚ GIA
24/10/2022 08:55
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Bidding package No. 31-2022: Providing personal protective equipment and office uniforms of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY TNHH BẢO HỘ HSE TÍN TOÀN
20/10/2022 15:44
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package TS03-2022: Maintenance of Air Conditioning and Ventilation systems - EVNGENCO2 Power Plant Management Headquarters in Da Nang of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ THUẬN THIÊN VƯỢNG
20/10/2022 15:29
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package No. 30-2022: Supply of servers at the Headquarters of Song Bung Hydropower Company and License for Firewall equipment - Checkpoint 3800 at Song Bung 2 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY TNHH TÍCH HỢP HỆ THỐNG NHT
19/10/2022 09:34
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Tender package TS05-2022: Maintenance of generator items - Headquarters of cultural management of power plants under EVNGENCO2 in Da Nang of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ PKB
13/10/2022 15:01
The data sheet has been partially hidden, to see the full information please Login or Register
Song Bung Hydro Power Company announced the results of the bidding package Tender package No 13-2022: Supply of materials and equipment for the 2nd phase of production in 2022 with 1 participating contractors .
06/01/2023 15:11
Song Bung Hydro Power Company announced the results of the bid package Package No. 24-2022: Supply and installation of 2V-500Ah battery system for Song Bung 4 Hydropower Plant .
- Winning bidder: Công Ty Cổ Phần Xây Lắp Bưu Điện Miền Trung
23/11/2022 16:31
Song Bung Hydro Power Company announced the results of the bid package Package SCL03.3-2022: Overhauling 03 spillway supply gates, water intake valves and spillway cranes, water intake gates of Song Bung 4 Hydropower Plant .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN ĐIỆN SÊ SAN 3A
07/11/2022 15:14
Song Bung Hydro Power Company announced the results of the bid package Package SCL03.1-2022: Overhaul 03 gate valves and repair valves for Song Bung 4 Hydropower Plant .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN ĐIỆN SÊ SAN 3A
04/11/2022 16:56
Song Bung Hydro Power Company announced the results of the bid package Package SCL03.2-2022: Overhaul hydraulic equipment for spillway, water intake at Song Bung 4 Hydropower Plant .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN ĐIỆN SÊ SAN 3A
04/11/2022 16:54
Song Bung Hydro Power Company announced the results of the bid package Package SCL01-2023: Consulting on surveying, preparing reports on safety assessment of excavation roofs in the pressure pipeline area, design, repair, reinforcement and renovation of 325m mechanical 315m and VH3 TC9 road area of Song Hydropower Plant Bung 2 .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 1
04/11/2022 14:02
Song Bung Hydro Power Company announced the results of the bidding package Package SCL01-2023: Consulting survey, making report on safety assessment of excavated roof in pressure pipeline area, designing, repairing, reinforcing, renovating 325m, 315m engine and VH3 TC9 road area of Song Hydropower Plant Expand 2 with 1 participating contractors .
24/10/2022 11:08
Song Bung Hydro Power Company announced the results of the bid package Package No. 26-2022: Construction of wall and floor seepage treatment of Song Bung 2 Hydropower Plant and Song Bung 4 Hydropower Plant .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI PHÚ GIA
24/10/2022 08:55
Song Bung Hydro Power Company announced the results of the bid package Bidding package No. 31-2022: Providing personal protective equipment and office uniforms .
- Winning bidder: CÔNG TY TNHH BẢO HỘ HSE TÍN TOÀN
20/10/2022 15:44
Song Bung Hydro Power Company announced the results of the bid package Package TS03-2022: Maintenance of Air Conditioning and Ventilation systems - EVNGENCO2 Power Plant Management Headquarters in Da Nang .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ THUẬN THIÊN VƯỢNG
20/10/2022 15:29
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package No. 24-2022: Supply and installation of 2V-500Ah battery system for Song Bung 4 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: Công Ty Cổ Phần Xây Lắp Bưu Điện Miền Trung
23/11/2022 16:31
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package SCL03.3-2022: Overhauling 03 spillway supply gates, water intake valves and spillway cranes, water intake gates of Song Bung 4 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN ĐIỆN SÊ SAN 3A
07/11/2022 15:14
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package SCL03.1-2022: Overhaul 03 gate valves and repair valves for Song Bung 4 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN ĐIỆN SÊ SAN 3A
04/11/2022 16:56
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package SCL03.2-2022: Overhaul hydraulic equipment for spillway, water intake at Song Bung 4 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN ĐIỆN SÊ SAN 3A
04/11/2022 16:54
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package SCL01-2023: Consulting on surveying, preparing reports on safety assessment of excavation roofs in the pressure pipeline area, design, repair, reinforcement and renovation of 325m mechanical 315m and VH3 TC9 road area of Song Hydropower Plant Bung 2 of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 1
04/11/2022 14:02
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package No. 26-2022: Construction of wall and floor seepage treatment of Song Bung 2 Hydropower Plant and Song Bung 4 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI PHÚ GIA
24/10/2022 08:55
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Bidding package No. 31-2022: Providing personal protective equipment and office uniforms of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY TNHH BẢO HỘ HSE TÍN TOÀN
20/10/2022 15:44
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package TS03-2022: Maintenance of Air Conditioning and Ventilation systems - EVNGENCO2 Power Plant Management Headquarters in Da Nang of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ THUẬN THIÊN VƯỢNG
20/10/2022 15:29
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Package No. 30-2022: Supply of servers at the Headquarters of Song Bung Hydropower Company and License for Firewall equipment - Checkpoint 3800 at Song Bung 2 Hydropower Plant of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY TNHH TÍCH HỢP HỆ THỐNG NHT
19/10/2022 09:34
The Bid solicitor Song Bung Hydro Power Company has posted the results of the bidding package Tender package TS05-2022: Maintenance of generator items - Headquarters of cultural management of power plants under EVNGENCO2 in Da Nang of the investor Song Bung Hydro Power Company.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ PKB
13/10/2022 15:01
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Song Bung Hydro Power Company is the owner of 22 contractor selection plan. In which, they self-invite 22 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Song Bung Hydro Power Company is the investor of 245 package, of which 217 package is self-invited, other units invite bid 28 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Song Bung Hydro Power Company is the owner of 261 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Song Bung Hydro Power Company has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Song Bung Hydro Power Company is an investor with 326 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.