Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners THACHKHE IRON ORE JOINT STOCK COMPANY as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 0 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 2 contractor selection plans with a total of 14 bidding packages, of which 2 prequalification documents have not found the investment project
- Has invited bids for 0 packages (with 0 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 0 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 14 packages that have not fully posted the contractor selection results. Of these 14 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for project owners THACHKHE IRON ORE JOINT STOCK COMPANY as follows:
- Has relationships with 0 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
You need to Login or Sign up to view all informations.
- Participated in 9 bidding packages, of which 9 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 99.74% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100.42% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Undefined (9)
- Provinces before the merger where the contractor has participated in bidding : Undefined (9)
- Has relationships with 2 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 4 contractors in 4 bidding packages, won 4 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor THACHKHE IRON ORE JOINT STOCK COMPANY has posted the request Investment project on mining and selecting iron ore from Thach Khe mine, Ha Tinh (adjusted) of the investor THACHKHE IRON ORE JOINT STOCK COMPANY with 10 bidding package.
17/08/2016 09:47
The Bid solicitor THACHKHE IRON ORE JOINT STOCK COMPANY has posted the request Upgrading the clean water system in Thach Ban commune of the investor THACHKHE IRON ORE JOINT STOCK COMPANY with 4 bidding package.
10/12/2015 09:35
The data sheet has been partially hidden, to see the full information please Login or Register
THACHKHE IRON ORE JOINT STOCK COMPANY publishes the plan Investment project on mining and selecting iron ore from Thach Khe mine, Ha Tinh (adjusted) with 10 bidding package .
17/08/2016 09:47
THACHKHE IRON ORE JOINT STOCK COMPANY publishes the plan Upgrading the clean water system in Thach Ban commune with 4 bidding package .
10/12/2015 09:35
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor THACHKHE IRON ORE JOINT STOCK COMPANY has posted the request Investment project on mining and selecting iron ore from Thach Khe mine, Ha Tinh (adjusted) of the investor THACHKHE IRON ORE JOINT STOCK COMPANY with 10 bidding package.
17/08/2016 09:47
The Bid solicitor THACHKHE IRON ORE JOINT STOCK COMPANY has posted the request Upgrading the clean water system in Thach Ban commune of the investor THACHKHE IRON ORE JOINT STOCK COMPANY with 4 bidding package.
10/12/2015 09:35
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor THACHKHE IRON ORE JOINT STOCK COMPANY is the owner of 2 contractor selection plan. In which, they self-invite 2 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: The investor THACHKHE IRON ORE JOINT STOCK COMPANY has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.