Data analysis results of DauThau.info software for project owners THANG LONG GTC JOINT STOCK COMPANY as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 10 contractors.
- Announced 2 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 2 contractor selection plans with a total of 4 bidding packages, of which 0 prequalification documents have not found the investment project
- Has invited bids for 4 packages (with 4 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 8 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.50 contractors.
- Breakdown by bidding field: Goods 25.00%, Construction 75.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 12,650,032,482 VND, of which the total winning bid value is: 12,370,037,530 VND.
- The savings rate is: 2.21%.
Data analysis results of DauThau.info software for project owners THANG LONG GTC JOINT STOCK COMPANY as follows:
- Has relationships with 10 contractors.
- The average number of contractors participating in each bidding package is: 2.50 contractors.
- Proportion of bidding fields: Goods 25.00%, Construction 75.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 12,650,032,482 VND, in which the total winning value is: 12,370,037,530 VND.
- The savings rate is: 2.21%.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 4 bidding packages with 2 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Package XL-05: Supply and installation of elevators of the investor THANG LONG GTC JOINT STOCK COMPANY.
- Winning bidder: NAM LONG EQUIPMENT AND ELEVATOR COMPANY LIMITED
04/10/2023 16:29
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Package XL-04: M&E construction and ventilation and air-conditioning system of the investor THANG LONG GTC JOINT STOCK COMPANY.
- Winning bidder: INO ELECTRICAL ENGINEERING JOINT STOCK COMPANY
07/09/2023 16:34
Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted Tender Notice Package XL-05: Supply and installation of elevators of the investor THANG LONG GTC JOINT STOCK COMPANY with the form Competitive Offer.
07/08/2023 14:48
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the request Approving the contractor selection plan for the project: Building M2 Huynh Thuc Khang of the investor THANG LONG GTC JOINT STOCK COMPANY with 4 bidding package.
07/08/2023 14:01
Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted Tender Notice Package XL-04: M&E construction and ventilation and air-conditioning system of the investor THANG LONG GTC JOINT STOCK COMPANY with the form Open bidding.
13/07/2023 14:50
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Package XL-03: Construction and installation of substations of the investor THANG LONG GTC JOINT STOCK COMPANY.
30/06/2023 15:13
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Package XL-02: Construction and installation works of the investor THANG LONG GTC JOINT STOCK COMPANY.
30/06/2023 15:03
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Package XL-01: Demolition of old works of the investor THANG LONG GTC JOINT STOCK COMPANY.
17/05/2023 10:14
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Tender package TV-04: Construction supervision consultancy and equipment installation of the investor THANG LONG GTC JOINT STOCK COMPANY.
11/05/2023 12:01
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Tender package TV-02: Project management consulting of the investor THANG LONG GTC JOINT STOCK COMPANY.
- Winning bidder: Công ty TNHH Tư vấn thiết kế kiến trúc và xây dựng Việt Nam
11/05/2023 11:57
The data sheet has been partially hidden, to see the full information please Login or Register
THANG LONG GTC JOINT STOCK COMPANY announced the results of the bid package Package XL-05: Supply and installation of elevators .
- Winning bidder: NAM LONG EQUIPMENT AND ELEVATOR COMPANY LIMITED
04/10/2023 16:29
THANG LONG GTC JOINT STOCK COMPANY announced the results of the bid package Package XL-04: M&E construction and ventilation and air-conditioning system .
- Winning bidder: INO ELECTRICAL ENGINEERING JOINT STOCK COMPANY
07/09/2023 16:34
THANG LONG GTC JOINT STOCK COMPANY announced the results of the bidding package Package XL-05: Supply and installation of elevators with 4 participating contractors .
17/08/2023 09:35
THANG LONG GTC JOINT STOCK COMPANY publishes Tender Notice Package XL-05: Supply and installation of elevators in the form Competitive Offer .
07/08/2023 14:48
THANG LONG GTC JOINT STOCK COMPANY publishes the plan Approving the contractor selection plan for the project: Building M2 Huynh Thuc Khang with 4 bidding package .
07/08/2023 14:01
THANG LONG GTC JOINT STOCK COMPANY announced the results of the bidding package Package XL-04: M&E construction and ventilation and air-conditioning system with 1 participating contractors .
24/07/2023 16:15
THANG LONG GTC JOINT STOCK COMPANY publishes Tender Notice Package XL-04: M&E construction and ventilation and air-conditioning system in the form Open bidding .
13/07/2023 14:50
THANG LONG GTC JOINT STOCK COMPANY announced the results of the bid package Package XL-03: Construction and installation of substations .
- Winning bidder: INO ELECTRICAL ENGINEERING JOINT STOCK COMPANY
30/06/2023 15:13
THANG LONG GTC JOINT STOCK COMPANY announced the results of the bid package Package XL-02: Construction and installation works .
- Winning bidder: HANOI CONSTRUCTION JOINT STOCK COMPANY NO1, Thai Linh Construction and investment Joint Stock Company
30/06/2023 15:03
THANG LONG GTC JOINT STOCK COMPANY announced the results of the bid package Package XL-01: Demolition of old works .
- Winning bidder: Công ty cổ phần phát triển công nghệ xây dựng Chúc Bình Phương
17/05/2023 10:14
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Package XL-05: Supply and installation of elevators of the investor THANG LONG GTC JOINT STOCK COMPANY.
- Winning bidder: NAM LONG EQUIPMENT AND ELEVATOR COMPANY LIMITED
04/10/2023 16:29
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Package XL-04: M&E construction and ventilation and air-conditioning system of the investor THANG LONG GTC JOINT STOCK COMPANY.
- Winning bidder: INO ELECTRICAL ENGINEERING JOINT STOCK COMPANY
07/09/2023 16:34
Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted Tender Notice Package XL-05: Supply and installation of elevators of the investor THANG LONG GTC JOINT STOCK COMPANY with the form Competitive Offer.
07/08/2023 14:48
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the request Approving the contractor selection plan for the project: Building M2 Huynh Thuc Khang of the investor THANG LONG GTC JOINT STOCK COMPANY with 4 bidding package.
07/08/2023 14:01
Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted Tender Notice Package XL-04: M&E construction and ventilation and air-conditioning system of the investor THANG LONG GTC JOINT STOCK COMPANY with the form Open bidding.
13/07/2023 14:50
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Package XL-03: Construction and installation of substations of the investor THANG LONG GTC JOINT STOCK COMPANY.
30/06/2023 15:13
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Package XL-02: Construction and installation works of the investor THANG LONG GTC JOINT STOCK COMPANY.
30/06/2023 15:03
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Package XL-01: Demolition of old works of the investor THANG LONG GTC JOINT STOCK COMPANY.
17/05/2023 10:14
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Tender package TV-04: Construction supervision consultancy and equipment installation of the investor THANG LONG GTC JOINT STOCK COMPANY.
11/05/2023 12:01
The Bid solicitor THANG LONG GTC JOINT STOCK COMPANY has posted the results of the bidding package Tender package TV-02: Project management consulting of the investor THANG LONG GTC JOINT STOCK COMPANY.
- Winning bidder: Công ty TNHH Tư vấn thiết kế kiến trúc và xây dựng Việt Nam
11/05/2023 11:57
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THANG LONG GTC JOINT STOCK COMPANY is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor THANG LONG GTC JOINT STOCK COMPANY is the owner of 2 contractor selection plan. In which, they self-invite 2 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor THANG LONG GTC JOINT STOCK COMPANY is the investor of 4 package, of which 4 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THANG LONG GTC JOINT STOCK COMPANY is the owner of 8 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor THANG LONG GTC JOINT STOCK COMPANY has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor THANG LONG GTC JOINT STOCK COMPANY is an investor with 10 contractor. The data sheet has been partially hidden, to see the full information please Login or Register