Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Tin Nghia Project Management as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 52 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 64 contractor selection plans with a total of 64 bidding packages, of which 63 prequalification documents have not found the investment project
- Has invited bids for 67 packages (with 75 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 86 packages, and canceled bids for 1 packages (among the packages mentioned above).
- There are 30 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 13 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.92 contractors.
- Breakdown by bidding field: Goods 1.33%, Construction 74.67%, Consultancy 16.00%, Non-consultancy 0%, Mixed 8.00%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,202,634,633,580 VND, of which the total winning bid value is: 1,109,228,521,927 VND.
- The savings rate is: 7.77%.
Data analysis results of DauThau.info software for project owners Tin Nghia Project Management as follows:
- Has relationships with 52 contractors.
- The average number of contractors participating in each bidding package is: 1.92 contractors.
- Proportion of bidding fields: Goods 1.33%, Construction 74.67%, Consulting 16.00%, Non-consulting 0%, Mixed 8.00%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,202,634,633,580 VND, in which the total winning value is: 1,109,228,521,927 VND.
- The savings rate is: 7.77%.
You need to Login or Sign up to view all informations.
- Participated in 20 bidding packages, of which 14 were won, 5 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 19.7% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 84.55% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đồng Nai (14), TP.Hồ Chí Minh (1), Undefined (5)
- Provinces before the merger where the contractor has participated in bidding : Đồng Nai (4), Bình Phước (3), Bà Rịa - Vũng Tàu (1), Undefined (12)
- Has relationships with 9 Bid Solicitors
- Has relationships with 8 Bid Investors
- Has competed against 17 contractors in 7 bidding packages, won 1 packages, lost 5 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 3 contractors in 4 bidding packages, won 1 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 7 bidding packages with 6 roles.
- Name of construction organization: CÔNG TY CỔ PHẦN QUẢN LÝ DỰ ÁN TÍN NGHĨA
- Code of capacity certificate of construction activities: 00016183
- Issuer: Sở kế hoạch và đầu tư tỉnh Đồng Nai
- Fields:
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật (Hệ thống xử lý nước thải)
⚬ Giám sát công tác xây dựng công trình: Hạ tầng kỹ thuật (thoát nước theo tuyến)
⚬ Giám sát công tác xây dựng công trình: Giao thông (đường bộ)
⚬ Khảo sát xây dựng: Địa chất công trình
⚬ Quản lý dự án đầu tư xây dựng: Dân dụng
⚬ Quản lý dự án đầu tư xây dựng: Công nghiệp: có k/cấu dạng nhà, Trạm bán lẻ xăng dầu
⚬ Giám sát công tác xây dựng công trình: Dân dụng
⚬ Giám sát công tác xây dựng công trình: Công nghiệp: có k/cấu dạng nhà, Trạm bán lẻ xăng dầu
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông: Đường bộ, cầu đường bộ
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Công nghiệp
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management.
31/10/2022 00:00
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Construction part of C1C2 Factory. of the investor Tin Nghia Project Management.
06/10/2022 13:20
Bid solicitor Tin Nghia Project Management has posted Tender Notice Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management with the form Competitive Bidding.
29/08/2022 14:21
Bid solicitor Tin Nghia Project Management has posted Tender Notice Construction part of C1C2 Factory. of the investor Tin Nghia Project Management with the form National competitive bidding.
25/08/2022 17:47
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design consultancy and estimating, Project: Renovating Tin Nghia Granite Factory Warehouse of the investor Tin Nghia Project Management.
15/08/2022 00:00
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design, supply of equipment, construction and technology transfer (EPC) item Automatic wastewater monitoring station Project: Wastewater treatment station of An Phuoc Industrial Park of the investor Tin Nghia Project Management.
11/08/2022 08:36
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design, equipment supply, construction and technology transfer (EPC) item Automatic wastewater monitoring station Project: Wastewater treatment station of Tan Phu Industrial Park of the investor Tin Nghia Project Management.
11/08/2022 08:27
The Bid solicitor Tin Nghia Project Management has posted the request The contractor selection plan to adjust the bidding package: Design, equipment supply and construction (EPC) phase 2, with a capacity of 6,000m3/day_night, belonging to the Concentrated wastewater treatment station of Dat Do Industrial Park I. of the investor Tin Nghia Project Management with 1 bidding package.
03/08/2022 14:36
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design, equipment supply and construction (EPC) phase 2, capacity 6,000m3/day_night of the investor Tin Nghia Project Management.
02/08/2022 12:27
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Fire protection and lightning protection system of the investor Tin Nghia Project Management.
02/08/2022 07:43
The data sheet has been partially hidden, to see the full information please Login or Register
Tin Nghia Project Management announced the results of the bid package Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG SỐ 5
31/10/2022 00:00
Tin Nghia Project Management announced the results of the bid package Construction part of C1C2 Factory. .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THẢO KIÊN PHÁT, CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG VIỆT KIẾN MINH
06/10/2022 13:20
Tin Nghia Project Management announced the results of the bidding package Construction part of C1C2 Factory. with 4 participating contractors .
28/09/2022 09:43
Tin Nghia Project Management publishes Tender Notice Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). in the form Competitive Bidding .
29/08/2022 14:21
Tin Nghia Project Management publishes Tender Notice Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). in the form Competitive Bidding .
29/08/2022 14:21
Tin Nghia Project Management publishes the plan Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). with 1 bidding package .
29/08/2022 13:52
Tin Nghia Project Management publishes the plan Construction of Route 6 (from Km 0+139.4 to Km 0+254.3) with 1 bidding package .
29/08/2022 13:24
Tin Nghia Project Management publishes Tender Notice Construction part of C1C2 Factory. in the form National competitive bidding .
25/08/2022 17:47
Tin Nghia Project Management publishes the plan Tender Package for Construction of C1C2 Factory Building C1C2 . Factory Construction with 1 bidding package .
22/08/2022 16:11
Tin Nghia Project Management announced the results of the bid package Design consultancy and estimating, Project: Renovating Tin Nghia Granite Factory Warehouse .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ XÂY DỰNG DỊCH VỤ THƯƠNG MẠI WHITE NEST
15/08/2022 00:00
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management.
31/10/2022 00:00
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Construction part of C1C2 Factory. of the investor Tin Nghia Project Management.
06/10/2022 13:20
Bid solicitor Tin Nghia Project Management has posted Tender Notice Construction of Route 6 (from Km 0+139.4 to Km 0+254.3). of the investor Tin Nghia Project Management with the form Competitive Bidding.
29/08/2022 14:21
Bid solicitor Tin Nghia Project Management has posted Tender Notice Construction part of C1C2 Factory. of the investor Tin Nghia Project Management with the form National competitive bidding.
25/08/2022 17:47
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design consultancy and estimating, Project: Renovating Tin Nghia Granite Factory Warehouse of the investor Tin Nghia Project Management.
15/08/2022 00:00
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design, supply of equipment, construction and technology transfer (EPC) item Automatic wastewater monitoring station Project: Wastewater treatment station of An Phuoc Industrial Park of the investor Tin Nghia Project Management.
11/08/2022 08:36
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design, equipment supply, construction and technology transfer (EPC) item Automatic wastewater monitoring station Project: Wastewater treatment station of Tan Phu Industrial Park of the investor Tin Nghia Project Management.
11/08/2022 08:27
The Bid solicitor Tin Nghia Project Management has posted the request The contractor selection plan to adjust the bidding package: Design, equipment supply and construction (EPC) phase 2, with a capacity of 6,000m3/day_night, belonging to the Concentrated wastewater treatment station of Dat Do Industrial Park I. of the investor Tin Nghia Project Management with 1 bidding package.
03/08/2022 14:36
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Design, equipment supply and construction (EPC) phase 2, capacity 6,000m3/day_night of the investor Tin Nghia Project Management.
02/08/2022 12:27
The Bid solicitor Tin Nghia Project Management has posted the results of the bidding package Fire protection and lightning protection system of the investor Tin Nghia Project Management.
02/08/2022 07:43
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Tin Nghia Project Management is the owner of 64 contractor selection plan. In which, they self-invite 64 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Tin Nghia Project Management is the investor of 75 package, of which 75 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Tin Nghia Project Management is the owner of 86 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Tin Nghia Project Management has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Tin Nghia Project Management is an investor with 52 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.