Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners VIETNAM MARITIME AND WATERWAY ADMINISTRATION as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 134 contractors.
- Announced 1 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 190 contractor selection plans with a total of 673 bidding packages, of which 184 prequalification documents have not found the investment project
- Has invited bids for 351 packages (with 392 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 352 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 28 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 397 packages that have not fully posted the contractor selection results. Of these 375 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.62 contractors.
- Breakdown by bidding field: Goods 5.36%, Construction 21.17%, Consultancy 34.44%, Non-consultancy 39.03%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,595,236,141,361 VND, of which the total winning bid value is: 2,488,288,112,360 VND.
- The savings rate is: 4.12%.
Data analysis results of DauThau.info software for project owners VIETNAM MARITIME AND WATERWAY ADMINISTRATION as follows:
- Has relationships with 134 contractors.
- The average number of contractors participating in each bidding package is: 1.62 contractors.
- Proportion of bidding fields: Goods 5.36%, Construction 21.17%, Consulting 34.44%, Non-consulting 39.03%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,595,236,141,361 VND, in which the total winning value is: 2,488,288,112,360 VND.
- The savings rate is: 4.12%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package TTUBCCCCCKTTTTTT: Advice on verification of adjustment research reports of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: TTS HANOI TRADE AND SERVICES JOINT STOCK COMPANY
10/01/2026 15:11
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package TTTKCTCNTT: Consulting on verifying detailed design, adjusted estimates of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: TTS HANOI TRADE AND SERVICES JOINT STOCK COMPANY
10/01/2026 15:08
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package CCNCNCKTCTT: Advice on adjusting the feasibility study report of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 15:05
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package DCTKCTCNTT: Consulting on reviewing and adjusting detailed designs and estimates of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 15:03
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package TTG-IT: Appraisal of adjusted prices of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: TRUE VALUE VALUATION JOINT STOCK COMPANY
10/01/2026 15:01
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package KTPM-IT: Software testing of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
10/01/2026 14:57
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package HTKTDDCCNTT: Purchasing additional information technology equipment and upgrading internal software of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: VIETNAM MARITIME COMMUNICATION AND ELECTRONICS SINGLE-MEMBER LIMITED LIABILITY COMPANY
10/01/2026 14:54
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package Consultant - IT: Consulting on preparing request documents and evaluating proposal documents for the contract package Technical Support - IT of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: MTA TRADING AND TECHNOLOGY CONSULTING JOINT STOCK COMPANY
10/01/2026 14:31
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package TVGSHTKTDCCNTT: Consulting and monitoring of adjusted information technology technical infrastructure items of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 14:28
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the request Plan for selecting contractors for the supervision package of adjusted information technology technical infrastructure items under the project to build an integrated management information system for digital transformation of Vietnam Maritime and Waterways Administration of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION with 1 bidding package.
25/11/2025 09:34
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Contractor selection plan for bidding packages: Project management consultancy; Advice on making bidding documents, evaluating bidding documents for project - project management consulting package: Eliminating KM83+000 stone beach to Km83+215; Km83+600 to Km83+788 River Lo with 2 bidding package .
30/09/2025 19:46
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Contractor selection plan for bidding packages: Project management consultancy; Consulting to prepare bidding documents, evaluate bidding documents for project-project management consultancy package: Eliminate stone beach Km90+100 to Km90+250; Km90+950 to Km91+100 Lo River with 2 bidding package .
30/09/2025 19:34
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consulting package: Dredging to ensure traffic safety Ong Doc River - Trem Trem (section from Ong Doc River to Tan Canal Bang Gao) with 2 bidding package .
29/08/2025 08:37
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consultancy package: Dredging to ensure traffic safety channel eight thousand (km0+00 to km36+000) with 2 bidding package .
29/08/2025 08:36
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consultancy package: Dredging to ensure traffic safety channel eight thousand (km0+00 to km36+000) with 2 bidding package .
29/08/2025 08:28
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consulting package: Dredging to ensure traffic safety Ong Doc River - Trem Trem (section from Ong Doc River to Tan Canal Bang Gao) with 2 bidding package .
28/08/2025 15:42
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consultancy package: Dredging to ensure traffic safety channel eight thousand (km0+00 to km36+000) with 2 bidding package .
28/08/2025 15:42
VIETNAM MARITIME AND WATERWAY ADMINISTRATION publishes the plan Plan for contractor selection of consulting packages: Project management; Making bidding documents, evaluating bidding documents for project management consultancy with 2 bidding package .
28/08/2025 15:33
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package Making bidding documents and evaluating bidding documents for project management package .
- Winning bidder: HOANG HA TRADING CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
28/07/2025 11:13
VIETNAM MARITIME AND WATERWAY ADMINISTRATION announced the results of the bid package Making bidding documents and evaluating bidding documents for project management package .
- Winning bidder: HOANG HA TRADING CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
28/07/2025 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package TTUBCCCCCKTTTTTT: Advice on verification of adjustment research reports of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: TTS HANOI TRADE AND SERVICES JOINT STOCK COMPANY
10/01/2026 15:11
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package TTTKCTCNTT: Consulting on verifying detailed design, adjusted estimates of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: TTS HANOI TRADE AND SERVICES JOINT STOCK COMPANY
10/01/2026 15:08
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package CCNCNCKTCTT: Advice on adjusting the feasibility study report of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 15:05
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package DCTKCTCNTT: Consulting on reviewing and adjusting detailed designs and estimates of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 15:03
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package TTG-IT: Appraisal of adjusted prices of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: TRUE VALUE VALUATION JOINT STOCK COMPANY
10/01/2026 15:01
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package KTPM-IT: Software testing of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
10/01/2026 14:57
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package HTKTDDCCNTT: Purchasing additional information technology equipment and upgrading internal software of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: VIETNAM MARITIME COMMUNICATION AND ELECTRONICS SINGLE-MEMBER LIMITED LIABILITY COMPANY
10/01/2026 14:54
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package Consultant - IT: Consulting on preparing request documents and evaluating proposal documents for the contract package Technical Support - IT of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: MTA TRADING AND TECHNOLOGY CONSULTING JOINT STOCK COMPANY
10/01/2026 14:31
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the results of the bidding package TVGSHTKTDCCNTT: Consulting and monitoring of adjusted information technology technical infrastructure items of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION.
- Winning bidder: HA NOI VNT JOINT STOCK COMPANY
10/01/2026 14:28
The Bid solicitor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has posted the request Plan for selecting contractors for the supervision package of adjusted information technology technical infrastructure items under the project to build an integrated management information system for digital transformation of Vietnam Maritime and Waterways Administration of the investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION with 1 bidding package.
25/11/2025 09:34
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION is the owner of 190 contractor selection plan. In which, they self-invite 161 of contractor selection plan, other units invite bids of 29 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION is the investor of 392 package, of which 363 package is self-invited, other units invite bid 29 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION is the owner of 352 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor VIETNAM MARITIME AND WATERWAY ADMINISTRATION is an investor with 134 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.