Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners VRG - DAK NONG JOINT STOCK COMPANY as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 79 contractors.
- Announced 16 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 93 contractor selection plans with a total of 87 bidding packages, of which 87 prequalification documents have not found the investment project
- Has invited bids for 32 packages (with 36 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 85 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 58 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 11 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.50 contractors.
- Breakdown by bidding field: Goods 36.11%, Construction 13.89%, Consultancy 16.67%, Non-consultancy 33.33%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 46,521,389,761 VND, of which the total winning bid value is: 39,952,813,625 VND.
- The savings rate is: 14.12%.
Data analysis results of DauThau.info software for project owners VRG - DAK NONG JOINT STOCK COMPANY as follows:
- Has relationships with 79 contractors.
- The average number of contractors participating in each bidding package is: 2.50 contractors.
- Proportion of bidding fields: Goods 36.11%, Construction 13.89%, Consulting 16.67%, Non-consulting 33.33%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 46,521,389,761 VND, in which the total winning value is: 39,952,813,625 VND.
- The savings rate is: 14.12%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted Tender Notice Providing consulting services for feasibility studies, investment reports, and specialized project reports for floating solar power projects on the Dak Sin 1 hydroelectric reservoir. of the investor VRG - DAK NONG JOINT STOCK COMPANY with the form Open bidding.
28/08/2026 14:34
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the request We provide consulting services for feasibility studies, investment analysis reports, and specialized project reports for floating solar power projects on the Dak Sin 1 hydroelectric reservoir, as well as design review and BIM modeling services for the Dak Sin 1 hydroelectric floating solar project. of the investor VRG - DAK NONG JOINT STOCK COMPANY with 2 bidding package.
28/08/2026 10:38
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the request We provide consulting services for feasibility studies, investment analysis reports, and specialized project reports for floating solar power projects on the Dak Sin 1 hydroelectric reservoir, as well as design review and BIM modeling services for the Dak Sin 1 hydroelectric floating solar project. of the investor VRG - DAK NONG JOINT STOCK COMPANY with 2 bidding package.
28/08/2026 10:32
Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted Tender Notice Insurance coverage for the operation of the Dak Sin 1 hydropower plant during the period 2026-2027. of the investor VRG - DAK NONG JOINT STOCK COMPANY with the form Competitive Offer.
19/08/2026 14:27
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the request Insurance coverage for the operation of the Dak Sin 1 hydropower plant during the period 2026-2027. of the investor VRG - DAK NONG JOINT STOCK COMPANY with 1 bidding package.
17/08/2026 16:16
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the results of the bidding package Prepare supplementary planning documents for solar power plant projects in Phu Tuc commune, Gia Lai province. of the investor VRG - DAK NONG JOINT STOCK COMPANY.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 2
17/08/2026 10:44
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the results of the bidding package Providing consulting services for capital increase plans for VRG - Dak Nong Joint Stock Company. of the investor VRG - DAK NONG JOINT STOCK COMPANY.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
15/08/2026 08:47
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the results of the bidding package Upgrade protocol IEC60870-5-101 to IEC60870-5-104 and convert SCADA-HOTLINE connection at Dak Sin 1 Hydropower Plant from CSO to SSO of the investor VRG - DAK NONG JOINT STOCK COMPANY.
- Winning bidder: T10 COMPANY LIMITED
14/08/2026 16:22
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the request Prepare supplementary planning documents for solar power plant projects in Phu Tuc commune, Gia Lai province. of the investor VRG - DAK NONG JOINT STOCK COMPANY with 1 bidding package.
13/08/2026 14:14
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the request Providing consulting services for capital increase plans for VRG - Dak Nong Joint Stock Company. of the investor VRG - DAK NONG JOINT STOCK COMPANY with 1 bidding package.
10/08/2026 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
VRG - DAK NONG JOINT STOCK COMPANY publishes Tender Notice Providing consulting services for feasibility studies, investment reports, and specialized project reports for floating solar power projects on the Dak Sin 1 hydroelectric reservoir. in the form Open bidding .
28/08/2026 14:34
VRG - DAK NONG JOINT STOCK COMPANY publishes Tender Notice Insurance coverage for the operation of the Dak Sin 1 hydropower plant during the period 2026-2027. in the form Competitive Offer .
19/08/2026 14:27
VRG - DAK NONG JOINT STOCK COMPANY announced the results of the bid package Prepare supplementary planning documents for solar power plant projects in Phu Tuc commune, Gia Lai province. .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 2
17/08/2026 10:44
VRG - DAK NONG JOINT STOCK COMPANY announced the results of the bid package Upgrade protocol IEC60870-5-101 to IEC60870-5-104 and convert SCADA-HOTLINE connection at Dak Sin 1 Hydropower Plant from CSO to SSO .
- Winning bidder: T10 COMPANY LIMITED
14/08/2026 16:22
VRG - DAK NONG JOINT STOCK COMPANY announced the results of the bid package Assess the level of impact on minerals subject to reserves
(bauxite) within the scope of implementation of the Floating Solar Power Plant Project on Dak Sin 1 Hydroelectric Reservoir .
- Winning bidder: South Viet Nam Division of Mapping and Marine Geology
31/07/2026 13:38
VRG - DAK NONG JOINT STOCK COMPANY announced the results of the bidding package Upgrade protocol IEC60870-5-101 to IEC60870-5-104 and convert SCADA-HOTLINE connection at Dak Sin 1 Hydropower Plant from CSO to SSO with 3 participating contractors .
21/07/2026 15:03
VRG - DAK NONG JOINT STOCK COMPANY publishes Tender Notice Upgrade protocol IEC60870-5-101 to IEC60870-5-104 and convert SCADA-HOTLINE connection at Dak Sin 1 Hydropower Plant from CSO to SSO in the form Competitive Offer .
10/07/2026 10:05
VRG - DAK NONG JOINT STOCK COMPANY announced the results of the bid package Prepare a proposal to supplement Lam Dong province's electricity planning for the Dak Sin 1 hydropower reservoir solar power project - Phase 2 .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 2
08/07/2026 11:18
VRG - DAK NONG JOINT STOCK COMPANY announced the results of the bid package Providing services of Reviewing Financial Statements for the first 6 months of 2026 and Auditing 2026 Financial Statements VRG-Dak Nong Joint Stock Company .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
06/07/2026 15:01
VRG - DAK NONG JOINT STOCK COMPANY announced the results of the bid package Supervision of construction, repair and maintenance of road items operating in 2026 .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG ĐẮK PHÁT
29/05/2026 16:40
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted Tender Notice Providing consulting services for feasibility studies, investment reports, and specialized project reports for floating solar power projects on the Dak Sin 1 hydroelectric reservoir. of the investor VRG - DAK NONG JOINT STOCK COMPANY with the form Open bidding.
28/08/2026 14:34
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the request We provide consulting services for feasibility studies, investment analysis reports, and specialized project reports for floating solar power projects on the Dak Sin 1 hydroelectric reservoir, as well as design review and BIM modeling services for the Dak Sin 1 hydroelectric floating solar project. of the investor VRG - DAK NONG JOINT STOCK COMPANY with 2 bidding package.
28/08/2026 10:38
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the request We provide consulting services for feasibility studies, investment analysis reports, and specialized project reports for floating solar power projects on the Dak Sin 1 hydroelectric reservoir, as well as design review and BIM modeling services for the Dak Sin 1 hydroelectric floating solar project. of the investor VRG - DAK NONG JOINT STOCK COMPANY with 2 bidding package.
28/08/2026 10:32
Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted Tender Notice Insurance coverage for the operation of the Dak Sin 1 hydropower plant during the period 2026-2027. of the investor VRG - DAK NONG JOINT STOCK COMPANY with the form Competitive Offer.
19/08/2026 14:27
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the request Insurance coverage for the operation of the Dak Sin 1 hydropower plant during the period 2026-2027. of the investor VRG - DAK NONG JOINT STOCK COMPANY with 1 bidding package.
17/08/2026 16:16
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the results of the bidding package Prepare supplementary planning documents for solar power plant projects in Phu Tuc commune, Gia Lai province. of the investor VRG - DAK NONG JOINT STOCK COMPANY.
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 2
17/08/2026 10:44
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the results of the bidding package Providing consulting services for capital increase plans for VRG - Dak Nong Joint Stock Company. of the investor VRG - DAK NONG JOINT STOCK COMPANY.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
15/08/2026 08:47
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the results of the bidding package Upgrade protocol IEC60870-5-101 to IEC60870-5-104 and convert SCADA-HOTLINE connection at Dak Sin 1 Hydropower Plant from CSO to SSO of the investor VRG - DAK NONG JOINT STOCK COMPANY.
- Winning bidder: T10 COMPANY LIMITED
14/08/2026 16:22
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the request Prepare supplementary planning documents for solar power plant projects in Phu Tuc commune, Gia Lai province. of the investor VRG - DAK NONG JOINT STOCK COMPANY with 1 bidding package.
13/08/2026 14:14
The Bid solicitor VRG - DAK NONG JOINT STOCK COMPANY has posted the request Providing consulting services for capital increase plans for VRG - Dak Nong Joint Stock Company. of the investor VRG - DAK NONG JOINT STOCK COMPANY with 1 bidding package.
10/08/2026 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor VRG - DAK NONG JOINT STOCK COMPANY is the investor of 16 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor VRG - DAK NONG JOINT STOCK COMPANY is the owner of 93 contractor selection plan. In which, they self-invite 49 of contractor selection plan, other units invite bids of 44 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor VRG - DAK NONG JOINT STOCK COMPANY is the investor of 36 package, of which 35 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor VRG - DAK NONG JOINT STOCK COMPANY is the owner of 85 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor VRG - DAK NONG JOINT STOCK COMPANY has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor VRG - DAK NONG JOINT STOCK COMPANY is an investor with 79 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.