Data analysis results of DauThau.info software for project owners Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 179 contractors.
- Announced 125 development investment project, of which 7 projects that have not announced the contractor selection plan.
- Announced 162 contractor selection plans with a total of 558 bidding packages, of which 28 prequalification documents have not found the investment project
- Has invited bids for 147 packages (with 165 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 231 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 99 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 364 packages that have not fully posted the contractor selection results. Of these 364 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.55 contractors.
- Breakdown by bidding field: Goods 1.21%, Construction 74.55%, Consultancy 24.24%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,656,731,908,910 VND, of which the total winning bid value is: 2,525,198,187,926 VND.
- The savings rate is: 4.95%.
Data analysis results of DauThau.info software for project owners Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn as follows:
- Has relationships with 179 contractors.
- The average number of contractors participating in each bidding package is: 1.55 contractors.
- Proportion of bidding fields: Goods 1.21%, Construction 74.55%, Consulting 24.24%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,656,731,908,910 VND, in which the total winning value is: 2,525,198,187,926 VND.
- The savings rate is: 4.95%.
You need to Login or Sign up to view all informations.
- Participated in 12 bidding packages, of which 12 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 92.59% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.85% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Thanh Hoá (12)
- Provinces before the merger where the contractor has participated in bidding : Thanh Hoá (12)
- Has relationships with 1 Bid Solicitors
- Has relationships with 4 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Package No. 09: Construction work (including construction insurance and traffic regulation) of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: NO 10 ROAD BRIDGE JOINT STOCK COMPANY
27/02/2026 16:38
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Package 08: Construction supervision consultancy of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: TRANSPORT CONSULTANT JOINT-STOCK COMPANY
13/01/2026 11:34
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Package No. 01: Recovering the current power line system (including costs to ensure traffic safety to serve
construction) of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI MINH HƯNG
29/12/2025 10:13
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Package No. 05: Construction (including construction insurance and traffic safety assurance) of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: MIEN TRUNG CONSTRUCTION GROUP..., JSC
26/12/2025 09:43
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Tender package No 03: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: TSC SERVICE INFRASTRUCTURE AND TECHNOLOGY DEVELOPMENT JOINT STOCK COMPANY
19/12/2025 14:20
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the request Compensation for low-voltage power lines behind Hung Quy Substation of Kim Phu Long Trading Service Co., Ltd. and low-voltage power lines behind Minh Hoang 1 and 2 Substations of Minh Hoang Co., Ltd. to implement the project to expand Le Loi Avenue, section from Phu Son intersection to Dong bridge, Thanh Hoa city. of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn with 1 bidding package.
17/12/2025 09:43
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Tender package No 02: Construction supervision consultancy of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: LAM SON CONSTRUCTION AND INVESTMENT CONSULTANT COMPANY LIMITED
12/12/2025 14:44
Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted Tender Notice Tender package No 03: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn with the form Open bidding.
24/11/2025 16:49
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Package 01: Consulting, surveying, designing BVTC and costing of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: Công ty TNHH Tư vấn và xây lắp An Đức
05/11/2025 16:25
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the request Compensation for low voltage power lines behind Hung Quy Substation of Kim Phu Long Trading Service Company Limited and low voltage power lines behind Minh Hoang Substation 1 and 2 of Minh Hoang Company Limited to implement the project to expand Le Loi Avenue section from Phu Son intersection to Dong bridge, Thanh Hoa city. of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn with 1 bidding package.
05/11/2025 16:09
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn announced the results of the bid package Package 08: Construction supervision consultancy .
- Winning bidder: TRANSPORT CONSULTANT JOINT-STOCK COMPANY
13/01/2026 11:34
Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn announced the results of the bid package Package No. 02: Survey consultancy, construction design and construction design after basic design .
- Winning bidder: CÔNG TY TNHH TƯ VẤN KIẾN TRÚC VÀ XÂY DỰNG HÀ NỘI
19/08/2025 09:01
Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn announced the results of the bid package Package 03: Construction work (Including construction insurance) .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG HÀM RỒNG
19/08/2025 08:57
Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn announced the results of the bid package Package No. 01: Construction of works (including construction costs, purchasing materials and equipment, construction insurance, traffic safety costs) .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN PHÁT TRIỂN TÂN THÀNH PHÁT, THANH HOA URBAN CONSTRUCTION AND ENVIRONMENT JOINT STOCK COMPANY
30/06/2025 15:39
Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn announced the results of the bid package Package 03: Construction construction (including construction insurance and traffic safety) .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG ADS
30/06/2025 15:18
Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn announced the results of the bid package Package 02: Construction of works (including: construction, construction insurance, ensuring traffic safety for construction) .
- Winning bidder: QUAN NAM TRADE AND CONSTRUCTION LIMITTED COMPANY
30/06/2025 08:36
Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn announced the results of the bid package Package 10: Construction of works items (including construction costs, equipment costs, construction insurance and traffic safety) .
- Winning bidder: CÔNG TY TNHH THẮNG MẠNH TIẾN
19/06/2025 16:44
Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn announced the results of the bid package Package 06: Construction of construction insurance and traffic safety assurance) .
- Winning bidder: HUY HOAN TRADE AND CONTRUCTION JSC.COMPANY, CÔNG TY TNHH MTV THƯƠNG MẠI VÀ ĐẦU TƯ THIÊN AN
19/06/2025 16:41
Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn announced the results of the bid package Package 02: Land inventory, mapping of land use status in 2024 in Thanh Hoa city .
- Winning bidder: Trung tâm Dữ liệu thông tin tài nguyên và môi trường
19/06/2025 14:56
Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn announced the results of the bidding package Package 02: Construction of works (including: construction, construction insurance, ensuring traffic safety for construction) with 1 participating contractors .
12/06/2025 17:14
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Package No. 09: Construction work (including construction insurance and traffic regulation) of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: NO 10 ROAD BRIDGE JOINT STOCK COMPANY
27/02/2026 16:38
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Package 08: Construction supervision consultancy of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: TRANSPORT CONSULTANT JOINT-STOCK COMPANY
13/01/2026 11:34
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Package No. 01: Recovering the current power line system (including costs to ensure traffic safety to serve
construction) of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI MINH HƯNG
29/12/2025 10:13
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Package No. 05: Construction (including construction insurance and traffic safety assurance) of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: MIEN TRUNG CONSTRUCTION GROUP..., JSC
26/12/2025 09:43
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Tender package No 03: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: TSC SERVICE INFRASTRUCTURE AND TECHNOLOGY DEVELOPMENT JOINT STOCK COMPANY
19/12/2025 14:20
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the request Compensation for low-voltage power lines behind Hung Quy Substation of Kim Phu Long Trading Service Co., Ltd. and low-voltage power lines behind Minh Hoang 1 and 2 Substations of Minh Hoang Co., Ltd. to implement the project to expand Le Loi Avenue, section from Phu Son intersection to Dong bridge, Thanh Hoa city. of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn with 1 bidding package.
17/12/2025 09:43
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Tender package No 02: Construction supervision consultancy of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: LAM SON CONSTRUCTION AND INVESTMENT CONSULTANT COMPANY LIMITED
12/12/2025 14:44
Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted Tender Notice Tender package No 03: Construction work of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn with the form Open bidding.
24/11/2025 16:49
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the results of the bidding package Package 01: Consulting, surveying, designing BVTC and costing of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn.
- Winning bidder: Công ty TNHH Tư vấn và xây lắp An Đức
05/11/2025 16:25
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has posted the request Compensation for low voltage power lines behind Hung Quy Substation of Kim Phu Long Trading Service Company Limited and low voltage power lines behind Minh Hoang Substation 1 and 2 of Minh Hoang Company Limited to implement the project to expand Le Loi Avenue section from Phu Son intersection to Dong bridge, Thanh Hoa city. of the investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn with 1 bidding package.
05/11/2025 16:09
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn is the investor of 125 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn is the owner of 162 contractor selection plan. In which, they self-invite 149 of contractor selection plan, other units invite bids of 13 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn is the investor of 165 package, of which 150 package is self-invited, other units invite bid 15 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn is the owner of 231 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has published 2 penalty decision(s).
Summary: The investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án đầu tư xây dựng khu vực Đông Sơn is an investor with 179 contractor. The data sheet has been partially hidden, to see the full information please Login or Register