Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Ban quản lý dự án đầu tư xây dựng Thuận Châu as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 211 contractors.
- Announced 444 development investment project, of which 55 projects that have not announced the contractor selection plan.
- Announced 519 contractor selection plans with a total of 1793 bidding packages, of which 121 prequalification documents have not found the investment project
- Has invited bids for 368 packages (with 448 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 590 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 244 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1339 packages that have not fully posted the contractor selection results. Of these 1332 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.37 contractors.
- Breakdown by bidding field: Goods 2.90%, Construction 91.52%, Consultancy 5.36%, Non-consultancy 0.22%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,540,659,473,323 VND, of which the total winning bid value is: 1,477,887,038,560 VND.
- The savings rate is: 4.07%.
Data analysis results of DauThau.info software for project owners Ban quản lý dự án đầu tư xây dựng Thuận Châu as follows:
- Has relationships with 211 contractors.
- The average number of contractors participating in each bidding package is: 1.37 contractors.
- Proportion of bidding fields: Goods 2.90%, Construction 91.52%, Consulting 5.36%, Non-consulting 0.22%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,540,659,473,323 VND, in which the total winning value is: 1,477,887,038,560 VND.
- The savings rate is: 4.07%.
You need to Login or Sign up to view all informations.
- Participated in 18 bidding packages, of which 18 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 98.5% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.96% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Sơn La (18)
- Provinces before the merger where the contractor has participated in bidding : Sơn La (18)
- Has relationships with 1 Bid Solicitors
- Has relationships with 9 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 4 bidding packages with 4 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Package No. 03: Construction audit of Internal Road in Song village, Chieng La commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 11:09
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Bidding package No. 03: Construction audit of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 10:59
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Auditing the Huoi Long Village Road project, Nong Lay commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 10:35
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Construction of Huoi Long Internal Road, Nong Lay commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: Công ty cổ phần Tuân Anh
27/01/2026 10:34
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the request LCNT plan to implement Huoi Long village internal road project, Nong Lay commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu with 3 bidding package.
27/01/2026 10:31
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Package No. 03: Audit of internal road project in Chun village, Thom Mon commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 10:13
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Package No. 01: Construction of internal road in Chun village, Thom Mon commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: CÔNG TY TNHH BÌNH KỲ TÂY BẮC
27/01/2026 10:11
Ban quản lý dự án đầu tư xây dựng Thuận Châu Posted Development Investment Project Road inside Huoi Long village, Nong Lay commune, Thuan Chau district.
27/01/2026 10:10
Ban quản lý dự án đầu tư xây dựng Thuận Châu Posted Development Investment Project Road inside Huoi Long village, Nong Lay commune, Thuan Chau district.
27/01/2026 10:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the request Plan to select contractors to implement the project: Internal road of Chun village, Thom Mon commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu with 3 bidding package.
27/01/2026 10:00
The data sheet has been partially hidden, to see the full information please Login or Register
Ban quản lý dự án đầu tư xây dựng Thuận Châu announced the results of the bid package Package No. 03: Construction audit of Internal Road in Song village, Chieng La commune, Thuan Chau district .
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 11:09
Ban quản lý dự án đầu tư xây dựng Thuận Châu announced the results of the bid package Bidding package No. 03: Construction audit .
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 10:59
Ban quản lý dự án đầu tư xây dựng Thuận Châu announced the results of the bid package Auditing the Huoi Long Village Road project, Nong Lay commune, Thuan Chau district .
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 10:35
Ban quản lý dự án đầu tư xây dựng Thuận Châu announced the results of the bid package Construction of Huoi Long Internal Road, Nong Lay commune, Thuan Chau district .
- Winning bidder: Công ty cổ phần Tuân Anh
27/01/2026 10:34
Ban quản lý dự án đầu tư xây dựng Thuận Châu publishes the plan LCNT plan to implement Huoi Long village internal road project, Nong Lay commune, Thuan Chau district with 3 bidding package .
27/01/2026 10:31
Ban quản lý dự án đầu tư xây dựng Thuận Châu announced the results of the bid package Package No. 03: Audit of internal road project in Chun village, Thom Mon commune, Thuan Chau district .
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 10:13
Ban quản lý dự án đầu tư xây dựng Thuận Châu announced the results of the bid package Package No. 01: Construction of internal road in Chun village, Thom Mon commune, Thuan Chau district .
- Winning bidder: CÔNG TY TNHH BÌNH KỲ TÂY BẮC
27/01/2026 10:11
Ban quản lý dự án đầu tư xây dựng Thuận Châu publishes the plan Plan to select contractors to implement the project: Internal road of Chun village, Thom Mon commune, Thuan Chau district with 3 bidding package .
27/01/2026 10:00
Ban quản lý dự án đầu tư xây dựng Thuận Châu announced the results of the bid package Package No. 03: Consulting on verifying the design of financial protection and cost estimates for Ban Chan Road, Bon Phang commune, Thuan Chau district .
- Winning bidder: HAI NAM SON LA CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY
26/01/2026 14:56
Ban quản lý dự án đầu tư xây dựng Thuận Châu announced the results of the bid package Package No. 01: Survey consulting, preparation of economic and technical reports for Ban Chan Road, Bon Phang commune, Thuan Chau district .
- Winning bidder: THINH PHAT 668 JOINT STOCK COMPANY
26/01/2026 14:54
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Package No. 03: Construction audit of Internal Road in Song village, Chieng La commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 11:09
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Bidding package No. 03: Construction audit of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 10:59
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Auditing the Huoi Long Village Road project, Nong Lay commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 10:35
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Construction of Huoi Long Internal Road, Nong Lay commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: Công ty cổ phần Tuân Anh
27/01/2026 10:34
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the request LCNT plan to implement Huoi Long village internal road project, Nong Lay commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu with 3 bidding package.
27/01/2026 10:31
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Package No. 03: Audit of internal road project in Chun village, Thom Mon commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
27/01/2026 10:13
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the results of the bidding package Package No. 01: Construction of internal road in Chun village, Thom Mon commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu.
- Winning bidder: CÔNG TY TNHH BÌNH KỲ TÂY BẮC
27/01/2026 10:11
Ban quản lý dự án đầu tư xây dựng Thuận Châu Posted Development Investment Project Road inside Huoi Long village, Nong Lay commune, Thuan Chau district.
27/01/2026 10:10
Ban quản lý dự án đầu tư xây dựng Thuận Châu Posted Development Investment Project Road inside Huoi Long village, Nong Lay commune, Thuan Chau district.
27/01/2026 10:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng Thuận Châu has posted the request Plan to select contractors to implement the project: Internal road of Chun village, Thom Mon commune, Thuan Chau district of the investor Ban quản lý dự án đầu tư xây dựng Thuận Châu with 3 bidding package.
27/01/2026 10:00
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng Thuận Châu is the investor of 444 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban quản lý dự án đầu tư xây dựng Thuận Châu is the owner of 519 contractor selection plan. In which, they self-invite 518 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban quản lý dự án đầu tư xây dựng Thuận Châu is the investor of 448 package, of which 445 package is self-invited, other units invite bid 3 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng Thuận Châu is the owner of 590 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: The investor Ban quản lý dự án đầu tư xây dựng Thuận Châu has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng Thuận Châu is an investor with 211 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.