Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Ban quản lý dự án đầu tư xây dựng xã Nga Sơn as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 16 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 20 contractor selection plans with a total of 41 bidding packages, of which 20 prequalification documents have not found the investment project
- Has invited bids for 0 packages (with 0 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 39 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,064,593,000 VND, of which the total winning bid value is: 2,971,427,000 VND.
- The savings rate is: 3.04%.
Data analysis results of DauThau.info software for project owners Ban quản lý dự án đầu tư xây dựng xã Nga Sơn as follows:
- Has relationships with 16 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,064,593,000 VND, in which the total winning value is: 2,971,427,000 VND.
- The savings rate is: 3.04%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has posted the results of the bidding package Package 02: Consultancy and verification of economic and technical reports of the investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN LONG KHÁNH
25/08/2026 23:41
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has posted the results of the bidding package Package No. 01: Survey consultancy, preparation of economic and technical reports of the investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG CẦU ĐƯỜNG 8
25/08/2026 23:38
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has posted the results of the bidding package Package 02: Consultancy and verification of economic and technical reports of the investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ VÀ XÂY DỰNG TM MẠNH NGUYÊN PHÁT
21/08/2026 23:45
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has posted the results of the bidding package Package No. 01: Survey consultancy, preparation of economic and technical reports of the investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ AN LÊ
21/08/2026 23:42
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has posted the request Plan for selecting contractors for the works related to the project preparation phase: Upgrade of the bridge over Sao River, Nga Son commune;
Item: Bridge and connecting road construction. of the investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn with 2 bidding package.
21/08/2026 23:36
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has posted the results of the bidding package Package 02: Consultancy and verification of economic and technical reports of the investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NBS
19/08/2026 18:25
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has posted the results of the bidding package Package 02: Consultancy and verification of economic and technical reports of the investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn.
- Winning bidder: DAT VIET CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY
19/08/2026 18:22
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has posted the results of the bidding package Package No. 01: Survey consultancy, preparation of economic and technical reports of the investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn.
- Winning bidder: Công ty trách nhiệm hữu hạn nghiên cứu ứng dụng chuyển giao công nghệ xây dựng mới
19/08/2026 18:20
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has posted the results of the bidding package Package 02: Consultancy and verification of economic and technical reports of the investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn.
- Winning bidder: Delta Investment and Construction Joint Stock Company
19/08/2026 18:16
The Bid solicitor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has posted the results of the bidding package Package No. 01: Survey consultancy, preparation of economic and technical reports of the investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn.
- Winning bidder: THD CONSULTING, INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
19/08/2026 18:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn is the owner of 20 contractor selection plan. In which, they self-invite 0 of contractor selection plan, other units invite bids of 20 of contractor selection plan.
Summary: Investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn is the owner of 39 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án đầu tư xây dựng xã Nga Sơn is an investor with 16 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.