Data analysis results of DauThau.info software for project owners Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 46 contractors.
- Announced 13 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 28 contractor selection plans with a total of 69 bidding packages, of which 12 prequalification documents have not found the investment project
- Has invited bids for 12 packages (with 13 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 49 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 37 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 21 packages that have not fully posted the contractor selection results. Of these 21 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.60 contractors.
- Breakdown by bidding field: Goods 7.69%, Construction 76.92%, Consultancy 15.38%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 169,051,312,000 VND, of which the total winning bid value is: 160,118,856,715 VND.
- The savings rate is: 5.28%.
Data analysis results of DauThau.info software for project owners Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 as follows:
- Has relationships with 46 contractors.
- The average number of contractors participating in each bidding package is: 2.60 contractors.
- Proportion of bidding fields: Goods 7.69%, Construction 76.92%, Consulting 15.38%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 169,051,312,000 VND, in which the total winning value is: 160,118,856,715 VND.
- The savings rate is: 5.28%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the results of the bidding package Package No. 05: Consultancy for verification of Feasibility Study Report of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2.
- Winning bidder: Công ty TNHH Tư vấn đầu tư xây dựng 68 Kinh Bắc
10/04/2026 13:58
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the request Approve the contractor selection plan for package No. 05 Under the project: Renovating and upgrading the canal system connecting Kim Doi I pumping station and Kim Doi II pumping station of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 with 1 bidding package.
08/04/2026 15:30
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the request Approve the contractor selection plan for package No. 01 of the Project: Renovating the T11 drainage canal to connect to the canal route from Dai Dong - Hoan Son industrial park phase 2 to the T11 drainage canal of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 with 1 bidding package.
12/03/2026 16:25
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the results of the bidding package Package No. 13: Consulting on traffic safety verification at the design stage of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2.
- Winning bidder: T&D VIET NAM CIVIL ENGINEERING CONSULTANT JOINT STOCK COMPANY
10/02/2026 08:59
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the request Contractor selection plan (bid packages No. 13, 14) under Project: Investment in construction of Road DT.278, section from Highway 18, Phuong Mao commune to Provincial Road 287, Yen Gia commune, Que Vo district, Bac Ninh province of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 with 2 bidding package.
04/02/2026 13:38
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the request Contractor selection plan (bid packages numbered from 06 to 14) under the Project: Construction investment of component project 7: Compensation, support, resettlement in Bac Ninh province under the Lao Cai - Hanoi - Hai Phong railway line construction investment project of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 with 9 bidding package.
04/02/2026 13:32
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 Posted Development Investment Project Investing in the construction of Provincial Road 278, section from National Highway 18, Phuong Mao commune to Provincial Road 287, Yen Gia commune, Que Vo district, Bac Ninh province.
04/02/2026 13:13
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the results of the bidding package Package No. 08: Construction supervision consultancy package No. 07 of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2.
04/02/2026 11:37
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the results of the bidding package Package No. 07: Clearance of bombs, mines, and explosives of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2.
04/02/2026 11:36
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the results of the bidding package Package No. 01: Consulting on making reports on investment policies of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2.
- Winning bidder: Công ty TNHH Tư vấn đầu tư xây dựng 68 Kinh Bắc
01/02/2026 10:24
The data sheet has been partially hidden, to see the full information please Login or Register
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 announced the results of the bid package Bidding package 20: Traffic safety verification advice before being put into operation .
- Winning bidder: CONSULTANCY COMPANY LIMITED OF UNIVERSITY OF CIVIL ENGINEERING
06/10/2025 10:39
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 announced the results of the bid package Package No. 19: Consulting on making tasks and outline of traffic safety verification before being put into use .
- Winning bidder: GIA CAT PHUC JOINT STOCK COMPANY
15/09/2025 16:11
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 announced the results of the bid package Package No. 13: Memitating 110kV, 35kV, low voltage and fiber optic cable .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG VÀ CHUYỂN GIAO CÔNG NGHỆ - DPH, CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG 19-5, TRUONG THI CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY
08/09/2025 15:15
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 publishes the plan Regarding the approval of contractor selection plan (phase 2) Ingredients project No. 3: Repairing and upgrading Bac Hung Hai system phase 2, Bac Ninh province under the repair and upgrading project of Bac Hung Hai system phase 2 with 2 bidding package .
26/08/2025 10:57
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 announced the results of the bid package Package No. 06: The entire construction, equipment installation and traffic safety .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG 668, CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG THƯƠNG MẠI THÀNH CÔNG
13/08/2025 17:46
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 announced the results of the bid package Package 6A: The entire construction of the remaining volume has not been constructed of Package 6 (paragraph from km0+00 - km4+609.05) .
- Winning bidder: TRAN GIA RURAL DEVELOPMENT JOINT STOCK COMPANY, CÔNG TY XÂY DỰNG VIỆT ĐỨC - (TNHH), CÔNG TY TNHH MTV XDvàTM DUY ANH, VAN XUAN CONSTRUCTION JOINT STOCK COMPANY
13/08/2025 17:19
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 announced the results of the bidding package Tender package No 13: Memitating 110kV, 35kV, low voltage and fiber optic cable with 3 participating contractors .
09/07/2025 17:30
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 publishes the plan Approving the contractor selection plan under the project to upgrade the dyke line in Bac Ninh province with 1 bidding package .
07/07/2025 15:21
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 announced the results of the bid package Bidding package 8: Construction insurance for package 6A and for the under construction volume of the package No. 5 .
- Winning bidder: military insurance corporation
02/07/2025 06:38
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 announced the results of the bid package Package 4: Making an environmental impact assessment report .
- Winning bidder: HONG PHUC ENVIRONMENT AND SERVICE JOINT STOCK COMPANY
02/07/2025 06:35
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the results of the bidding package Package No. 05: Consultancy for verification of Feasibility Study Report of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2.
- Winning bidder: Công ty TNHH Tư vấn đầu tư xây dựng 68 Kinh Bắc
10/04/2026 13:58
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the request Approve the contractor selection plan for package No. 05 Under the project: Renovating and upgrading the canal system connecting Kim Doi I pumping station and Kim Doi II pumping station of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 with 1 bidding package.
08/04/2026 15:30
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the request Approve the contractor selection plan for package No. 01 of the Project: Renovating the T11 drainage canal to connect to the canal route from Dai Dong - Hoan Son industrial park phase 2 to the T11 drainage canal of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 with 1 bidding package.
12/03/2026 16:25
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the results of the bidding package Package No. 13: Consulting on traffic safety verification at the design stage of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2.
- Winning bidder: T&D VIET NAM CIVIL ENGINEERING CONSULTANT JOINT STOCK COMPANY
10/02/2026 08:59
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the request Contractor selection plan (bid packages No. 13, 14) under Project: Investment in construction of Road DT.278, section from Highway 18, Phuong Mao commune to Provincial Road 287, Yen Gia commune, Que Vo district, Bac Ninh province of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 with 2 bidding package.
04/02/2026 13:38
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the request Contractor selection plan (bid packages numbered from 06 to 14) under the Project: Construction investment of component project 7: Compensation, support, resettlement in Bac Ninh province under the Lao Cai - Hanoi - Hai Phong railway line construction investment project of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 with 9 bidding package.
04/02/2026 13:32
Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 Posted Development Investment Project Investing in the construction of Provincial Road 278, section from National Highway 18, Phuong Mao commune to Provincial Road 287, Yen Gia commune, Que Vo district, Bac Ninh province.
04/02/2026 13:13
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the results of the bidding package Package No. 08: Construction supervision consultancy package No. 07 of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2.
04/02/2026 11:37
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the results of the bidding package Package No. 07: Clearance of bombs, mines, and explosives of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2.
04/02/2026 11:36
The Bid solicitor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has posted the results of the bidding package Package No. 01: Consulting on making reports on investment policies of the investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2.
- Winning bidder: Công ty TNHH Tư vấn đầu tư xây dựng 68 Kinh Bắc
01/02/2026 10:24
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 is the investor of 13 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 is the owner of 28 contractor selection plan. In which, they self-invite 7 of contractor selection plan, other units invite bids of 21 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 is the investor of 13 package, of which 5 package is self-invited, other units invite bid 8 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 is the owner of 49 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án Giao thông và Nông nghiệp tỉnh Bắc Ninh số 2 is an investor with 46 contractor. The data sheet has been partially hidden, to see the full information please Login or Register