Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Ban Quản lý dự án và phát triển qũy đất phường Đông Hải as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 63 contractors.
- Announced 39 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 72 contractor selection plans with a total of 183 bidding packages, of which 10 prequalification documents have not found the investment project
- Has invited bids for 12 packages (with 14 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 150 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 140 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 33 packages that have not fully posted the contractor selection results. Of these 31 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 85.71%, Consultancy 7.14%, Non-consultancy 7.14%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 127,369,718,943 VND, of which the total winning bid value is: 118,209,184,315 VND.
- The savings rate is: 7.19%.
Data analysis results of DauThau.info software for project owners Ban Quản lý dự án và phát triển qũy đất phường Đông Hải as follows:
- Has relationships with 63 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 85.71%, Consulting 7.14%, Non-consulting 7.14%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 127,369,718,943 VND, in which the total winning value is: 118,209,184,315 VND.
- The savings rate is: 7.19%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải has posted Tender Notice Procurement Tender package No 05: Management and operation of a centralized wastewater collection and treatment system in Dong Hai ward. of the investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải with the form Open bidding.
27/08/2026 10:17
The Bid solicitor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải has posted the results of the bidding package Procurement Package No. 04 – Evaluation of Bidding Documents and Selection of the Construction Contractor for the Management and Operation of a Centralized Wastewater Collection and Treatment System in Dong Hai Ward. of the investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải.
- Winning bidder: CÔNG TY CỔ PHẦN PHÁT TRIỂN HẠ TẦNG KHÁNH THUẬN
25/08/2026 13:07
The Bid solicitor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải has posted the results of the bidding package Procurement Package No. 03: Preparation of the Invitation to Bid and Evaluation of Bids for the Management and Operation of a Centralized Wastewater Collection and Treatment System in Dong Hai Ward. of the investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG KHOA KIM
25/08/2026 11:03
The Bid solicitor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải has posted the request Plan for selecting a contractor for the construction project: Management and operation of a centralized wastewater collection and treatment system in Dong Hai ward. of the investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải with 3 bidding package.
25/08/2026 10:49
Ban Quản lý dự án và phát triển qũy đất phường Đông Hải Posted Development Investment Project Management and operation of a centralized wastewater collection and treatment system in Dong Hai ward..
24/08/2026 11:11
The Bid solicitor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải has posted the results of the bidding package Tender number 06: Review of Construction Drawings and Estimates – Project for Upgrading, Construction, and Installation of Equipment in Schools within Dong Hai Ward. of the investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HOÀN THÀNH NINH THUẬN
21/08/2026 09:26
The Bid solicitor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải has posted the results of the bidding package Tender number 07: Evaluation of construction equipment for the "Upgrade, Construction, and Installation of School Equipment" project in Dong Hai ward. of the investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải.
- Winning bidder: VIET AUSTRALIA AUDITING COMPANY LIMITED
21/08/2026 09:22
Bid solicitor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải has posted Tender Notice Tender package No 07 of the investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải with the form Open bidding.
18/08/2026 19:28
The Bid solicitor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải has posted the request Plan for selecting a contractor for the renovation and upgrade of technical infrastructure and lighting in the Monument area. of the investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải with 5 bidding package.
17/08/2026 18:49
Ban Quản lý dự án và phát triển qũy đất phường Đông Hải Posted Development Investment Project Renovate and upgrade technical infrastructure and lighting of the Monument area.
17/08/2026 18:18
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải is the investor of 39 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải is the owner of 72 contractor selection plan. In which, they self-invite 0 of contractor selection plan, other units invite bids of 72 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải is the investor of 14 package, of which 0 package is self-invited, other units invite bid 14 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải is the owner of 150 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban Quản lý dự án và phát triển qũy đất phường Đông Hải is an investor with 63 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.