Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Ban quản lý dự án xây dựng Văn Môn as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 12 contractors.
- Announced 6 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 12 contractor selection plans with a total of 46 bidding packages, of which 6 prequalification documents have not found the investment project
- Has invited bids for 6 packages (with 7 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 28 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 22 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 20 packages that have not fully posted the contractor selection results. Of these 20 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 74,221,330,922 VND, of which the total winning bid value is: 73,628,262,216 VND.
- The savings rate is: 0.80%.
Data analysis results of DauThau.info software for project owners Ban quản lý dự án xây dựng Văn Môn as follows:
- Has relationships with 12 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 74,221,330,922 VND, in which the total winning value is: 73,628,262,216 VND.
- The savings rate is: 0.80%.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án xây dựng Văn Môn has posted the results of the bidding package Consulting on topographic survey and preparation of economic and technical reports of the investor Ban quản lý dự án xây dựng Văn Môn.
- Winning bidder: VIET DUC DESIGN CONSULTING JOINT STOCK COMPANY
26/08/2026 15:16
The Bid solicitor Ban quản lý dự án xây dựng Văn Môn has posted the results of the bidding package Consulting on feasibility studies and survey methods; Consulting on design review and cost estimation for construction projects. of the investor Ban quản lý dự án xây dựng Văn Môn.
- Winning bidder: KINH BAC BAC NINH CONSTRUCTION CONSULTANCY COMPANY LIMITED
26/08/2026 15:13
The Bid solicitor Ban quản lý dự án xây dựng Văn Môn has posted the request Plan for selecting contractors for consulting packages in the investment preparation phase of the project: Rehabilitation and Upgrade of National Road in Tien Village, Van Mon Commune (Phase 3). of the investor Ban quản lý dự án xây dựng Văn Môn with 2 bidding package.
26/08/2026 15:07
The Bid solicitor Ban quản lý dự án xây dựng Văn Môn has posted the results of the bidding package Package No. 01: The whole construction part of the investor Ban quản lý dự án xây dựng Văn Môn.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI QUỐC VINH
14/08/2026 16:45
The Bid solicitor Ban quản lý dự án xây dựng Văn Môn has posted the results of the bidding package Package 02: Consulting on verifying the construction drawing design records and estimates of the investor Ban quản lý dự án xây dựng Văn Môn.
- Winning bidder: Trung tâm Quản lý nhà và Giám định xây dựng Bắc Ninh
04/08/2026 09:52
The Bid solicitor Ban quản lý dự án xây dựng Văn Môn has posted the results of the bidding package Package No. 01: Terrain survey consultancy, Economic and technical reports of the investor Ban quản lý dự án xây dựng Văn Môn.
- Winning bidder: SHC CONSULTING CONSTRUCTION AND TRADING SERVICE COMPANY LIMITED
04/08/2026 09:49
The Bid solicitor Ban quản lý dự án xây dựng Văn Môn has posted the request Decision to approve the contractor selection plan for investment preparation consulting packages, step in preparing technical and economic reports Project: Renovating and upgrading traffic routes in Dong Luon area, Trung Ban village, Van Mon commune of the investor Ban quản lý dự án xây dựng Văn Môn with 2 bidding package.
04/08/2026 09:41
Bid solicitor Ban quản lý dự án xây dựng Văn Môn has posted Tender Notice Tender package No 1: The whole construction part of the investor Ban quản lý dự án xây dựng Văn Môn with the form Open bidding.
03/08/2026 10:30
The Bid solicitor Ban quản lý dự án xây dựng Văn Môn has posted the results of the bidding package Bidding package No. 02: Consulting on verification of tasks and topographic survey estimates of the investor Ban quản lý dự án xây dựng Văn Môn.
- Winning bidder: Trung tâm Quản lý nhà và Giám định xây dựng Bắc Ninh
31/07/2026 09:44
The Bid solicitor Ban quản lý dự án xây dựng Văn Môn has posted the results of the bidding package Package 01: Terrain survey consultancy and technical economic report of the investor Ban quản lý dự án xây dựng Văn Môn.
- Winning bidder: SHC CONSULTING CONSTRUCTION AND TRADING SERVICE COMPANY LIMITED
31/07/2026 09:41
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án xây dựng Văn Môn is the investor of 6 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Ban quản lý dự án xây dựng Văn Môn is the owner of 12 contractor selection plan. In which, they self-invite 0 of contractor selection plan, other units invite bids of 12 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Ban quản lý dự án xây dựng Văn Môn is the investor of 7 package, of which 0 package is self-invited, other units invite bid 7 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án xây dựng Văn Môn is the owner of 28 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Ban quản lý dự án xây dựng Văn Môn has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ban quản lý dự án xây dựng Văn Môn is an investor with 12 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.