Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Công ty Cổ phần Đầu tư Quang Bích as follows:
- Has relationships with 0 bid solicitors.
- Has relationships with 3 contractors.
- Announced 2 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project
- Has invited bids for 0 packages (with 0 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 2 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 4,931,019,956 VND, of which the total winning bid value is: 4,870,113,425 VND.
- The savings rate is: 1.24%.
Data analysis results of DauThau.info software for project owners Công ty Cổ phần Đầu tư Quang Bích as follows:
- Has relationships with 3 contractors.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 4,931,019,956 VND, in which the total winning value is: 4,870,113,425 VND.
- The savings rate is: 1.24%.
You need to Login or Sign up to view all informations.
- Participated in 16 bidding packages, of which 16 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 98.16% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.13% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Lâm Đồng (4), Undefined (12)
- Provinces before the merger where the contractor has participated in bidding : Lâm Đồng (4), Undefined (12)
- Has relationships with 4 Bid Solicitors
- Has competed against 3 contractors in 3 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 22 bidding packages with 8 roles.
- Name of construction organization: Công ty cổ phần đầu tư Quang Bích
- Code of capacity certificate of construction activities: 00011377
- Issuer: Sở Kế hoạch và Đầu tư Lâm Đồng
- Fields:
⚬ Quản lý dự án đầu tư xây dựng: dân dụng
⚬ Quản lý dự án đầu tư xây dựng: hạ tầng kỹ thuật Cấp, thoát nước; công viên cây xanh, sân bãi đỗ xe
⚬ Giám sát thi công xây dựng công trình: Nông nghiệp phát triển nông thôn Thủy lợi
⚬ Khảo sát xây dựng: địa chất công trình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: dân dụng
⚬ Giám sát thi công xây dựng công trình: dân dụng
⚬ Giám sát thi công xây dựng công trình: giao thông cầu, đường bộ
⚬ Giám sát thi công xây dựng công trình: Năng lượng đường dây và trạm biến áp
⚬ Khảo sát xây dựng: địa hình công trình xây dựng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: công trình giao thông
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty Cổ phần Đầu tư Quang Bích has posted the results of the bidding package Construction of the investor Công ty Cổ phần Đầu tư Quang Bích.
- Winning bidder: Cty TNHH Xây dựng thương mại và chăn nuôi Minh Trang
21/06/2021 09:12
Công ty Cổ phần Đầu tư Quang Bích Posted Development Investment Project Building a route from Nguyen Tri Phuong street to Nguyen An Ninh street and Phung Hung street, Bao Loc city.
03/12/2020 18:18
Công ty Cổ phần Đầu tư Quang Bích Posted Development Investment Project Building a route from Le Lai street to Phan Chu Trinh street, Loc Tien ward; drainage system, sidewalk of Nguyen Van Cu street, Loc Phat ward.
03/12/2020 10:10
The Bid solicitor Công ty Cổ phần Đầu tư Quang Bích has posted the results of the bidding package Package No. 01: Construction and renovation of external systems of houses, gardens, and internal roads of the investor Công ty Cổ phần Đầu tư Quang Bích.
- Winning bidder: Công ty TNHH Xây Dựng thương Mại Minh Cường
23/04/2020 08:44
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Cổ phần Đầu tư Quang Bích announced the results of the bid package Construction .
- Winning bidder: Cty TNHH Xây dựng thương mại và chăn nuôi Minh Trang
21/06/2021 09:12
Công ty Cổ phần Đầu tư Quang Bích announced the results of the bidding package Construction with 1 participating contractors .
04/06/2021 15:37
Công ty Cổ phần Đầu tư Quang Bích publishes Tender Notice Construction in the form National competitive bidding .
25/05/2021 15:13
Công ty Cổ phần Đầu tư Quang Bích publishes the plan Construction with 6 bidding package .
25/05/2021 10:13
Công ty Cổ phần Đầu tư Quang Bích publishes Tender Notice Package 04: Construction of water system, pavement of Nguyen Van Cu street, Loc Phat ward in the form National competitive bidding .
31/12/2020 09:57
Công ty Cổ phần Đầu tư Quang Bích publishes the plan Building a route from Le Lai street to Phan Chu Trinh street, Loc Tien ward; drainage system, sidewalk of Nguyen Van Cu street, Loc Phat ward with 8 bidding package .
31/12/2020 09:51
Công ty Cổ phần Đầu tư Quang Bích publishes Tender Notice Construction of inter-village road 11,13,14, Dam Bri . commune in the form National competitive bidding .
12/12/2020 10:25
Công ty Cổ phần Đầu tư Quang Bích publishes the plan Building inter-village roads 11,13,14 Dam Bri . commune with 9 bidding package .
12/12/2020 08:25
Công ty Cổ phần Đầu tư Quang Bích publishes Tender Notice Package 05: Construction of route No. 1 (from Nguyen Tri Phuong street to Nguyen An Ninh street) in the form National competitive bidding .
03/12/2020 19:22
Công ty Cổ phần Đầu tư Quang Bích publishes the plan Building a route from Nguyen Tri Phuong street to Nguyen An Ninh street and Phung Hung street, Bao Loc city with 10 bidding package .
03/12/2020 19:00
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty Cổ phần Đầu tư Quang Bích has posted the results of the bidding package Construction of the investor Công ty Cổ phần Đầu tư Quang Bích.
- Winning bidder: Cty TNHH Xây dựng thương mại và chăn nuôi Minh Trang
21/06/2021 09:12
Công ty Cổ phần Đầu tư Quang Bích Posted Development Investment Project Building a route from Nguyen Tri Phuong street to Nguyen An Ninh street and Phung Hung street, Bao Loc city.
03/12/2020 18:18
Công ty Cổ phần Đầu tư Quang Bích Posted Development Investment Project Building a route from Le Lai street to Phan Chu Trinh street, Loc Tien ward; drainage system, sidewalk of Nguyen Van Cu street, Loc Phat ward.
03/12/2020 10:10
The Bid solicitor Công ty Cổ phần Đầu tư Quang Bích has posted the results of the bidding package Package No. 01: Construction and renovation of external systems of houses, gardens, and internal roads of the investor Công ty Cổ phần Đầu tư Quang Bích.
- Winning bidder: Công ty TNHH Xây Dựng thương Mại Minh Cường
23/04/2020 08:44
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Cổ phần Đầu tư Quang Bích is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Cổ phần Đầu tư Quang Bích is the owner of 2 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Cổ phần Đầu tư Quang Bích is an investor with 3 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.