Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Công ty Điện lực Đông Anh as follows:
- Has relationships with 6 bid solicitors.
- Has relationships with 136 contractors.
- Announced 108 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 391 contractor selection plans with a total of 534 bidding packages, of which 143 prequalification documents have not found the investment project
- Has invited bids for 158 packages (with 186 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 134 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 134 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 197 packages that have not fully posted the contractor selection results. Of these 194 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 17.20%, Construction 39.25%, Consultancy 41.94%, Non-consultancy 1.61%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 59,499,359,341 VND, of which the total winning bid value is: 58,154,193,635 VND.
- The savings rate is: 2.26%.
Data analysis results of DauThau.info software for project owners Công ty Điện lực Đông Anh as follows:
- Has relationships with 136 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 17.20%, Construction 39.25%, Consulting 41.94%, Non-consulting 1.61%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 59,499,359,341 VND, in which the total winning value is: 58,154,193,635 VND.
- The savings rate is: 2.26%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (Investment implementation phase) Project: Architectural renovation of substations of QLDKV team 01, 02, 03, 04 in Me Linh district in 2026 of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:30
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (Investment implementation phase) project: Improving low voltage power supply capacity at Trung Hau Pagoda, Trung Hau Doai, Thanh Lam 8, Phu Nhi, Tien Phong 16, Tien Phong 5 substations of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:27
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (Investment implementation phase): Project: Renovating the low voltage power grid in Me Linh district in 2026 (Tam Dong Commune) of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:25
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (Investment implementation phase): Project: Renovating the low voltage power grid in Me Linh district in 2026 (Tam Dong Commune) of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:21
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (investment implementation phase) Project: Renovating low-voltage power grids in urban areas, phase 1 of 2025 of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:18
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (investment implementation phase) Project: Renovating low-voltage power grids in urban areas, phase 1 of 2025 of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:09
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan Package 01-TVQLDA/DTXD-2025: Project management consulting; Package 02-TVTT/ĐTXD-2025: Consulting on verification of Feasibility Study Report; Package 03-TVBCNCKT/DTXD-2025: Consulting on preparing a Feasibility Study Report of the investor Công ty Điện lực Đông Anh with 3 bidding package.
31/12/2025 11:18
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (investment implementation phase) Project to improve power supply capacity of Dong Anh medium voltage lines in 2026 of the investor Công ty Điện lực Đông Anh with 5 bidding package.
31/12/2025 08:22
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (investment implementation phase) Project: Improving power supply capacity of medium voltage lines 373E1.41 and 374E1.41 Mai Lam of the investor Công ty Điện lực Đông Anh with 4 bidding package.
29/12/2025 17:24
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (investment implementation phase) Project to improve power supply capacity of Dong Anh medium voltage lines in 2026 of the investor Công ty Điện lực Đông Anh with 5 bidding package.
29/12/2025 14:35
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Đông Anh publishes the plan Newly built 2 22kV routes from E1.41 Mai Lam TBA supply electricity to Vinhomes Coloa Urban Area with 3 bidding package .
12/06/2025 16:15
Công ty Điện lực Đông Anh publishes the plan The contractor selection plan (investment period) Package No. 10/GS/DTXD-2025 Supervision of construction and construction and installation of VTTB 06 works assigned to invest in 2025 in Vinhomes Coloa urban area. with 1 bidding package .
12/06/2025 16:06
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment period) Project: Building underground cable cable 3 -supply of Vinhomes Coloa urban area with 3 bidding package .
12/06/2025 14:15
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment period) Package 10/XL/DTXD-2025 Construction, supply and installation of VTTB 06 works assigned to invest in 2025 Vinhomes Coloa Urban Area with 1 bidding package .
11/06/2025 15:21
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan for the project investment period: Building TBAs in the round 3 power supply of Vinhomes Coloa Urban Area with 3 bidding package .
11/06/2025 08:57
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment period) Project: Building underground cable cable 1 and round 2 power supply of Vinhomes Coloa urban area with 3 bidding package .
11/06/2025 08:50
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment period) The project of construction of TBAs in the first circuit of Vinhomes Coloa urban area. with 3 bidding package .
11/06/2025 08:47
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment period) Project: Building TBAs in the circuit of the 2nd power supply of Vinhomes Coloa Urban Area with 3 bidding package .
11/06/2025 08:31
Công ty Điện lực Đông Anh publishes the plan Bidding contractor plan: "Package No. 01/MSHH/2025: Shopping costumes, labor protection equipment in 2025" with 1 bidding package .
09/05/2025 14:26
Công ty Điện lực Đông Anh publishes the plan Bidding package No. 01/ MSHH/ 2025 Purchasing safety tools for operation management with 1 bidding package .
09/05/2025 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (Investment implementation phase) Project: Architectural renovation of substations of QLDKV team 01, 02, 03, 04 in Me Linh district in 2026 of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:30
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (Investment implementation phase) project: Improving low voltage power supply capacity at Trung Hau Pagoda, Trung Hau Doai, Thanh Lam 8, Phu Nhi, Tien Phong 16, Tien Phong 5 substations of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:27
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (Investment implementation phase): Project: Renovating the low voltage power grid in Me Linh district in 2026 (Tam Dong Commune) of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:25
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (Investment implementation phase): Project: Renovating the low voltage power grid in Me Linh district in 2026 (Tam Dong Commune) of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:21
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (investment implementation phase) Project: Renovating low-voltage power grids in urban areas, phase 1 of 2025 of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:18
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (investment implementation phase) Project: Renovating low-voltage power grids in urban areas, phase 1 of 2025 of the investor Công ty Điện lực Đông Anh with 4 bidding package.
31/12/2025 20:09
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan Package 01-TVQLDA/DTXD-2025: Project management consulting; Package 02-TVTT/ĐTXD-2025: Consulting on verification of Feasibility Study Report; Package 03-TVBCNCKT/DTXD-2025: Consulting on preparing a Feasibility Study Report of the investor Công ty Điện lực Đông Anh with 3 bidding package.
31/12/2025 11:18
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (investment implementation phase) Project to improve power supply capacity of Dong Anh medium voltage lines in 2026 of the investor Công ty Điện lực Đông Anh with 5 bidding package.
31/12/2025 08:22
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (investment implementation phase) Project: Improving power supply capacity of medium voltage lines 373E1.41 and 374E1.41 Mai Lam of the investor Công ty Điện lực Đông Anh with 4 bidding package.
29/12/2025 17:24
The Bid solicitor Công ty Điện lực Đông Anh has posted the request Contractor selection plan (investment implementation phase) Project to improve power supply capacity of Dong Anh medium voltage lines in 2026 of the investor Công ty Điện lực Đông Anh with 5 bidding package.
29/12/2025 14:35
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Điện lực Đông Anh is the investor of 108 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Công ty Điện lực Đông Anh is the owner of 391 contractor selection plan. In which, they self-invite 109 of contractor selection plan, other units invite bids of 282 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Công ty Điện lực Đông Anh is the investor of 186 package, of which 0 package is self-invited, other units invite bid 186 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Điện lực Đông Anh is the owner of 134 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Công ty Điện lực Đông Anh has a relationship with 6 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Điện lực Đông Anh is an investor with 136 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.