Data analysis results of DauThau.info software for project owners Công ty Điện lực Hoài Đức as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 219 contractors.
- Announced 156 development investment project, of which 12 projects that have not announced the contractor selection plan.
- Announced 429 contractor selection plans with a total of 755 bidding packages, of which 147 prequalification documents have not found the investment project
- Has invited bids for 350 packages (with 433 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 421 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 88 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 451 packages that have not fully posted the contractor selection results. Of these 440 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.19 contractors.
- Breakdown by bidding field: Goods 24.94%, Construction 39.26%, Consultancy 28.87%, Non-consultancy 6.93%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 750,583,267,047 VND, of which the total winning bid value is: 716,780,374,097 VND.
- The savings rate is: 4.50%.
Data analysis results of DauThau.info software for project owners Công ty Điện lực Hoài Đức as follows:
- Has relationships with 219 contractors.
- The average number of contractors participating in each bidding package is: 2.19 contractors.
- Proportion of bidding fields: Goods 24.94%, Construction 39.26%, Consulting 28.87%, Non-consulting 6.93%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 750,583,267,047 VND, in which the total winning value is: 716,780,374,097 VND.
- The savings rate is: 4.50%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request The plan to select contractors to compile the construction package for construction and installation and combination of VTTB testing package of major repair works in 2025 of the investor Công ty Điện lực Hoài Đức with 2 bidding package.
27/05/2025 14:58
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for selecting construction contractors: Repairing replacement of RMU T14A cabinets KĐT Le Trong Tan and N2-2-2 RMU cabinet in Bac An Khanh Urban Area of the investor Công ty Điện lực Hoài Đức with 3 bidding package.
22/05/2025 15:06
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for selecting construction contractors: Overhauling of self -falling fuses, breakers and overhauled insulating parts of medium voltage lines 470E1.31; 475E1.31; 477E1.31; 479E1.37; 482E1.37 of the investor Công ty Điện lực Hoài Đức with 3 bidding package.
22/05/2025 14:30
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan to select the construction contractor: Overline the architecture of the transformer stations in 2025 of the investor Công ty Điện lực Hoài Đức with 2 bidding package.
22/05/2025 11:48
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request The plan for contractor selection Package No. 02/2025/SXKD "Procurement of equipment and equipment for production and business in 2025" of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
22/05/2025 08:40
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for contractor selection Package No. 03/2025/BHLD "Labor protection for officials and employees directly in 2025" of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
22/05/2025 08:32
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Providing cleaning, security, cooking, and driving services at Hoai Duc Power Company in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:20
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of labor protection for officers and direct employees in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:15
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of materials and equipment for production and business in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:10
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of materials and equipment for production and business in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:10
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Hoài Đức publishes the plan The plan to select contractors to compile the construction package for construction and installation and combination of VTTB testing package of major repair works in 2025 with 2 bidding package .
27/05/2025 14:58
Công ty Điện lực Hoài Đức publishes the plan Plan for selecting construction contractors: Repairing replacement of RMU T14A cabinets KĐT Le Trong Tan and N2-2-2 RMU cabinet in Bac An Khanh Urban Area with 3 bidding package .
22/05/2025 15:06
Công ty Điện lực Hoài Đức publishes the plan Plan for selecting construction contractors: Overhauling of self -falling fuses, breakers and overhauled insulating parts of medium voltage lines 470E1.31; 475E1.31; 477E1.31; 479E1.37; 482E1.37 with 3 bidding package .
22/05/2025 14:30
Công ty Điện lực Hoài Đức publishes the plan Plan to select the construction contractor: Overline the architecture of the transformer stations in 2025 with 2 bidding package .
22/05/2025 11:48
Công ty Điện lực Hoài Đức publishes the plan The plan for contractor selection Package No. 02/2025/SXKD "Procurement of equipment and equipment for production and business in 2025" with 1 bidding package .
22/05/2025 08:40
Công ty Điện lực Hoài Đức publishes the plan Plan for contractor selection Package No. 03/2025/BHLD "Labor protection for officials and employees directly in 2025" with 1 bidding package .
22/05/2025 08:32
Công ty Điện lực Hoài Đức publishes the plan Providing cleaning, security, cooking, and driving services at Hoai Duc Power Company in 2024 with 1 bidding package .
29/06/2024 09:20
Công ty Điện lực Hoài Đức publishes the plan Procurement of labor protection for officers and direct employees in 2024 with 1 bidding package .
29/06/2024 09:15
Công ty Điện lực Hoài Đức publishes the plan Procurement of materials and equipment for production and business in 2024 with 1 bidding package .
29/06/2024 09:10
Công ty Điện lực Hoài Đức publishes the plan Procurement of materials and equipment for production and business in 2024 with 1 bidding package .
29/06/2024 09:10
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request The plan to select contractors to compile the construction package for construction and installation and combination of VTTB testing package of major repair works in 2025 of the investor Công ty Điện lực Hoài Đức with 2 bidding package.
27/05/2025 14:58
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for selecting construction contractors: Repairing replacement of RMU T14A cabinets KĐT Le Trong Tan and N2-2-2 RMU cabinet in Bac An Khanh Urban Area of the investor Công ty Điện lực Hoài Đức with 3 bidding package.
22/05/2025 15:06
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for selecting construction contractors: Overhauling of self -falling fuses, breakers and overhauled insulating parts of medium voltage lines 470E1.31; 475E1.31; 477E1.31; 479E1.37; 482E1.37 of the investor Công ty Điện lực Hoài Đức with 3 bidding package.
22/05/2025 14:30
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan to select the construction contractor: Overline the architecture of the transformer stations in 2025 of the investor Công ty Điện lực Hoài Đức with 2 bidding package.
22/05/2025 11:48
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request The plan for contractor selection Package No. 02/2025/SXKD "Procurement of equipment and equipment for production and business in 2025" of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
22/05/2025 08:40
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for contractor selection Package No. 03/2025/BHLD "Labor protection for officials and employees directly in 2025" of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
22/05/2025 08:32
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Providing cleaning, security, cooking, and driving services at Hoai Duc Power Company in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:20
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of labor protection for officers and direct employees in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:15
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of materials and equipment for production and business in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:10
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of materials and equipment for production and business in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:10
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Điện lực Hoài Đức is the investor of 156 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Công ty Điện lực Hoài Đức is the owner of 429 contractor selection plan. In which, they self-invite 429 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Công ty Điện lực Hoài Đức is the investor of 433 package, of which 398 package is self-invited, other units invite bid 35 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Điện lực Hoài Đức is the owner of 421 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Công ty Điện lực Hoài Đức has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty Điện lực Hoài Đức is an investor with 219 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.