Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Hoài Đức as follows:
- Has relationships with 2 project owners.
- Has relationships with 228 contractor.
- Announced 156 investment development project, of which 12 projects have not yet announced the prequalification documents.
- Announced 436 contractor selection plans with a total of 770 bidding packages, of which 149 prequalification documents have not found the investment project.
- Has invited bids for 347 packages (with 422 tender notices), and conducted prequalification for 0 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 392 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 89 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 461 packages that have not fully posted the contractor selection results. Of these 450 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.02 contractors.
- Breakdown by bidding field: Goods 27.01%, Construction 38.39%, Consultancy 27.25%, Non-consultancy 7.35%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 725,645,685,690 VND, of which the total winning bid value is: 692,797,229,204 VND.
- The savings rate is: 4.53%.
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Hoài Đức as follows:
- Has relationships with 228 contractor.
- The average number of contractors participating in each bidding package is: 2.02 contractors.
- Proportion of bidding fields: Goods 27.01%, Construction 38.39%, Consulting 27.25%, Non-consulting 7.35%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 725,645,685,690 VND, in which the total winning value is: 692,797,229,204 VND.
- The savings rate is: 4.53%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty Điện lực Hoài Đức are as follows:
- Is the investor of 156 development investment projects.
- Is the investor of 435 contractor selection plans, of which 435 were self-published, and 0 were published by other entities.
- Is the investor of 433 Tender Notices, of which 398 were self-invited, and 35 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request The plan to select contractors to compile the construction package for construction and installation and combination of VTTB testing package of major repair works in 2025 of the investor Công ty Điện lực Hoài Đức with 2 bidding package.
27/05/2025 14:58
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for selecting construction contractors: Repairing replacement of RMU T14A cabinets KĐT Le Trong Tan and N2-2-2 RMU cabinet in Bac An Khanh Urban Area of the investor Công ty Điện lực Hoài Đức with 3 bidding package.
22/05/2025 15:06
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for selecting construction contractors: Overhauling of self -falling fuses, breakers and overhauled insulating parts of medium voltage lines 470E1.31; 475E1.31; 477E1.31; 479E1.37; 482E1.37 of the investor Công ty Điện lực Hoài Đức with 3 bidding package.
22/05/2025 14:30
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan to select the construction contractor: Overline the architecture of the transformer stations in 2025 of the investor Công ty Điện lực Hoài Đức with 2 bidding package.
22/05/2025 11:48
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request The plan for contractor selection Package No. 02/2025/SXKD "Procurement of equipment and equipment for production and business in 2025" of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
22/05/2025 08:40
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for contractor selection Package No. 03/2025/BHLD "Labor protection for officials and employees directly in 2025" of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
22/05/2025 08:32
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Providing cleaning, security, cooking, and driving services at Hoai Duc Power Company in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:20
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of labor protection for officers and direct employees in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:15
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of materials and equipment for production and business in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:10
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of materials and equipment for production and business in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:10
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Hoài Đức publishes the plan The plan to select contractors to compile the construction package for construction and installation and combination of VTTB testing package of major repair works in 2025 with 2 bidding package .
27/05/2025 14:58
Công ty Điện lực Hoài Đức publishes the plan Plan for selecting construction contractors: Repairing replacement of RMU T14A cabinets KĐT Le Trong Tan and N2-2-2 RMU cabinet in Bac An Khanh Urban Area with 3 bidding package .
22/05/2025 15:06
Công ty Điện lực Hoài Đức publishes the plan Plan for selecting construction contractors: Overhauling of self -falling fuses, breakers and overhauled insulating parts of medium voltage lines 470E1.31; 475E1.31; 477E1.31; 479E1.37; 482E1.37 with 3 bidding package .
22/05/2025 14:30
Công ty Điện lực Hoài Đức publishes the plan Plan to select the construction contractor: Overline the architecture of the transformer stations in 2025 with 2 bidding package .
22/05/2025 11:48
Công ty Điện lực Hoài Đức publishes the plan The plan for contractor selection Package No. 02/2025/SXKD "Procurement of equipment and equipment for production and business in 2025" with 1 bidding package .
22/05/2025 08:40
Công ty Điện lực Hoài Đức publishes the plan Plan for contractor selection Package No. 03/2025/BHLD "Labor protection for officials and employees directly in 2025" with 1 bidding package .
22/05/2025 08:32
Công ty Điện lực Hoài Đức publishes the plan Providing cleaning, security, cooking, and driving services at Hoai Duc Power Company in 2024 with 1 bidding package .
29/06/2024 09:20
Công ty Điện lực Hoài Đức publishes the plan Procurement of labor protection for officers and direct employees in 2024 with 1 bidding package .
29/06/2024 09:15
Công ty Điện lực Hoài Đức publishes the plan Procurement of materials and equipment for production and business in 2024 with 1 bidding package .
29/06/2024 09:10
Công ty Điện lực Hoài Đức publishes the plan Procurement of materials and equipment for production and business in 2024 with 1 bidding package .
29/06/2024 09:10
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request The plan to select contractors to compile the construction package for construction and installation and combination of VTTB testing package of major repair works in 2025 of the investor Công ty Điện lực Hoài Đức with 2 bidding package.
27/05/2025 14:58
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for selecting construction contractors: Repairing replacement of RMU T14A cabinets KĐT Le Trong Tan and N2-2-2 RMU cabinet in Bac An Khanh Urban Area of the investor Công ty Điện lực Hoài Đức with 3 bidding package.
22/05/2025 15:06
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for selecting construction contractors: Overhauling of self -falling fuses, breakers and overhauled insulating parts of medium voltage lines 470E1.31; 475E1.31; 477E1.31; 479E1.37; 482E1.37 of the investor Công ty Điện lực Hoài Đức with 3 bidding package.
22/05/2025 14:30
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan to select the construction contractor: Overline the architecture of the transformer stations in 2025 of the investor Công ty Điện lực Hoài Đức with 2 bidding package.
22/05/2025 11:48
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request The plan for contractor selection Package No. 02/2025/SXKD "Procurement of equipment and equipment for production and business in 2025" of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
22/05/2025 08:40
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Plan for contractor selection Package No. 03/2025/BHLD "Labor protection for officials and employees directly in 2025" of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
22/05/2025 08:32
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Providing cleaning, security, cooking, and driving services at Hoai Duc Power Company in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:20
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of labor protection for officers and direct employees in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:15
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of materials and equipment for production and business in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:10
The Bid solicitor Công ty Điện lực Hoài Đức has posted the request Procurement of materials and equipment for production and business in 2024 of the investor Công ty Điện lực Hoài Đức with 1 bidding package.
29/06/2024 09:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty Điện lực Hoài Đức has posted 436 of the contractor selection plan, which contains 770 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty Điện lực Hoài Đức has posted 422 Tender Notices in 347 bidding packages. Among these, 389 Tender Notices were self-invited, and 33 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Hoài Đức has posted 392 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 392 package, canceled the bid 0 package (among the bidding packages above).
- There are 89 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty Điện lực Hoài Đức has a relationship with 228 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Hoài Đức has a relationship with 34 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Công ty Điện lực Hoài Đức has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects