Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Công ty Điện lực Từ Liêm as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 0 contractors.
- Announced 0 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 3 contractor selection plans with a total of 15 bidding packages, of which 3 prequalification documents have not found the investment project
- Has invited bids for 0 packages (with 0 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 0 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 15 packages that have not fully posted the contractor selection results. Of these 15 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.33 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for project owners Công ty Điện lực Từ Liêm as follows:
- Has relationships with 0 contractors.
- The average number of contractors participating in each bidding package is: 3.33 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty Điện lực Từ Liêm has posted the request Building substations to ensure electricity supply in 2014 in Tu Liem district, phase 3 of the investor Công ty Điện lực Từ Liêm with 5 bidding package.
11/02/2015 14:00
The Bid solicitor Công ty Điện lực Từ Liêm has posted the request Construction of substations in the area of Bac Tu Liem and Nam Tu Liem District 2nd phase of the investor Công ty Điện lực Từ Liêm with 5 bidding package.
11/02/2015 11:42
The Bid solicitor Công ty Điện lực Từ Liêm has posted the request Construction of substations in Bac Tu Liem and Nam Tu Liem Districts phase 1 of the investor Công ty Điện lực Từ Liêm with 5 bidding package.
11/02/2015 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Từ Liêm publishes Tender Notice Package 09/15-VTTB: Supplying high-voltage cables to serve construction projects in 2015 in the form National competitive bidding .
11/02/2015 15:28
Công ty Điện lực Từ Liêm publishes Tender Notice Package 08/15-VTTB: Supplying cables for construction projects 2015 in the form National competitive bidding .
11/02/2015 14:48
Công ty Điện lực Từ Liêm publishes Tender Notice Tender package 07/15-VTTB: Supplying medium and low voltage cabinets for construction projects 2015 in the form National competitive bidding .
11/02/2015 14:44
Công ty Điện lực Từ Liêm publishes Tender Notice Tender package No 05/15-XDCB-XL: "Increasing the capacity of overloaded substations in the area of 2 districts south from Tu Liem and North from Tu Liem phase 1" in the form National competitive bidding .
11/02/2015 14:32
Công ty Điện lực Từ Liêm publishes Tender Notice Tender package No 04/15-XDCB-XL: "Additional installation of medium voltage capacitors in 2015 on the power grid of two districts of North and South Tu Liem" in the form National competitive bidding .
11/02/2015 14:29
Công ty Điện lực Từ Liêm publishes Tender Notice Tender package No 03/15-XDCB-XL: "Building substations to ensure power supply in 2014 in Tu Liem district, phase 3" in the form National competitive bidding .
11/02/2015 14:19
Công ty Điện lực Từ Liêm publishes Tender Notice Tender package No 02/15-XDCB-XL: "Building substations in the area of Bac Tu Liem and Nam Tu Liem District 2" in the form National competitive bidding .
11/02/2015 14:16
Công ty Điện lực Từ Liêm publishes Tender Notice Tender package No 01/15-XDCB-XL: "Building substations in Bac Tu Liem and Nam Tu Liem Districts, phase 1" in the form National competitive bidding .
11/02/2015 14:10
Công ty Điện lực Từ Liêm publishes the plan Building substations to ensure electricity supply in 2014 in Tu Liem district, phase 3 with 5 bidding package .
11/02/2015 14:00
Công ty Điện lực Từ Liêm publishes the plan Construction of substations in the area of Bac Tu Liem and Nam Tu Liem District 2nd phase with 5 bidding package .
11/02/2015 11:42
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty Điện lực Từ Liêm has posted the request Building substations to ensure electricity supply in 2014 in Tu Liem district, phase 3 of the investor Công ty Điện lực Từ Liêm with 5 bidding package.
11/02/2015 14:00
The Bid solicitor Công ty Điện lực Từ Liêm has posted the request Construction of substations in the area of Bac Tu Liem and Nam Tu Liem District 2nd phase of the investor Công ty Điện lực Từ Liêm with 5 bidding package.
11/02/2015 11:42
The Bid solicitor Công ty Điện lực Từ Liêm has posted the request Construction of substations in Bac Tu Liem and Nam Tu Liem Districts phase 1 of the investor Công ty Điện lực Từ Liêm with 5 bidding package.
11/02/2015 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Công ty Điện lực Từ Liêm is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: The investor Công ty Điện lực Từ Liêm has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.