Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners Học viện Chính trị/Bộ Quốc phòng as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 41 contractors.
- Announced 13 development investment project, of which 2 projects that have not announced the contractor selection plan.
- Announced 14 contractor selection plans with a total of 77 bidding packages, of which 0 prequalification documents have not found the investment project
- Has invited bids for 39 packages (with 42 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 53 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 14 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 37 packages that have not fully posted the contractor selection results. Of these 37 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.97 contractors.
- Breakdown by bidding field: Goods 23.81%, Construction 50.00%, Consultancy 21.43%, Non-consultancy 4.76%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 153,098,352,462 VND, of which the total winning bid value is: 149,877,313,758 VND.
- The savings rate is: 2.10%.
Data analysis results of DauThau.info software for project owners Học viện Chính trị/Bộ Quốc phòng as follows:
- Has relationships with 41 contractors.
- The average number of contractors participating in each bidding package is: 1.97 contractors.
- Proportion of bidding fields: Goods 23.81%, Construction 50.00%, Consulting 21.43%, Non-consulting 4.76%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 153,098,352,462 VND, in which the total winning value is: 149,877,313,758 VND.
- The savings rate is: 2.10%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package TV-04 of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: AN PHAT CONTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY
25/03/2025 15:48
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package TV-03 of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: AN HOA CONTRUCTION DESIGN & INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/03/2025 15:46
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the request The 1st contractor selection plan for creating and building some new fence and the gate system of the Academy of Political Academy of the investor Học viện Chính trị/Bộ Quốc phòng with 2 bidding package.
25/03/2025 15:44
Học viện Chính trị/Bộ Quốc phòng Posted Development Investment Project Renovate and build some fences and gate systems of the Academy of Politics.
25/03/2025 15:15
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package TV-02: Consultancy on verification of feasibility study report of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: AN PHAT CONTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY
25/03/2025 15:13
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package TV-01: Consulting on preparing feasibility study reports and drilling geological surveys of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: AN HOA CONTRUCTION DESIGN & INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/03/2025 15:04
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the request Renovate and build a number of fences and the gate system/political academy of the investor Học viện Chính trị/Bộ Quốc phòng with 2 bidding package.
25/03/2025 14:59
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package Bidding package MS-16 of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: BINH MINH TECHNICAL TRADING AND PRODUCTION JOINT STOCK COMPANY
26/02/2025 15:18
Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted Tender Notice Bidding package MS-16 of the investor Học viện Chính trị/Bộ Quốc phòng with the form Competitive Offer.
10/02/2025 09:15
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package Bidding package TB-20 of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: HA NOI FINE ART AND CONSTRUCTION INVESTMENT CONSULTING JOINT STOCK COMPANY
06/02/2025 17:09
The data sheet has been partially hidden, to see the full information please Login or Register
Học viện Chính trị/Bộ Quốc phòng announced the results of the bid package TV-04 .
- Winning bidder: AN PHAT CONTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY
25/03/2025 15:48
Học viện Chính trị/Bộ Quốc phòng announced the results of the bid package TV-03 .
- Winning bidder: AN HOA CONTRUCTION DESIGN & INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/03/2025 15:46
Học viện Chính trị/Bộ Quốc phòng publishes the plan The 1st contractor selection plan for creating and building some new fence and the gate system of the Academy of Political Academy with 2 bidding package .
25/03/2025 15:44
Học viện Chính trị/Bộ Quốc phòng announced the results of the bid package TV-02: Consultancy on verification of feasibility study report .
- Winning bidder: AN PHAT CONTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY
25/03/2025 15:13
Học viện Chính trị/Bộ Quốc phòng announced the results of the bid package TV-01: Consulting on preparing feasibility study reports and drilling geological surveys .
- Winning bidder: AN HOA CONTRUCTION DESIGN & INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/03/2025 15:04
Học viện Chính trị/Bộ Quốc phòng publishes the plan Renovate and build a number of fences and the gate system/political academy with 2 bidding package .
25/03/2025 14:59
Học viện Chính trị/Bộ Quốc phòng announced the results of the bid package Bidding package MS-16 .
- Winning bidder: BINH MINH TECHNICAL TRADING AND PRODUCTION JOINT STOCK COMPANY
26/02/2025 15:18
Học viện Chính trị/Bộ Quốc phòng announced the results of the bidding package Bidding package MS-16 with 2 participating contractors .
15/02/2025 09:14
Học viện Chính trị/Bộ Quốc phòng publishes Tender Notice Bidding package MS-16 in the form Competitive Offer .
10/02/2025 09:15
Học viện Chính trị/Bộ Quốc phòng announced the results of the bid package Bidding package TB-20 .
- Winning bidder: HA NOI FINE ART AND CONSTRUCTION INVESTMENT CONSULTING JOINT STOCK COMPANY
06/02/2025 17:09
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package TV-04 of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: AN PHAT CONTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY
25/03/2025 15:48
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package TV-03 of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: AN HOA CONTRUCTION DESIGN & INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/03/2025 15:46
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the request The 1st contractor selection plan for creating and building some new fence and the gate system of the Academy of Political Academy of the investor Học viện Chính trị/Bộ Quốc phòng with 2 bidding package.
25/03/2025 15:44
Học viện Chính trị/Bộ Quốc phòng Posted Development Investment Project Renovate and build some fences and gate systems of the Academy of Politics.
25/03/2025 15:15
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package TV-02: Consultancy on verification of feasibility study report of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: AN PHAT CONTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY
25/03/2025 15:13
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package TV-01: Consulting on preparing feasibility study reports and drilling geological surveys of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: AN HOA CONTRUCTION DESIGN & INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/03/2025 15:04
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the request Renovate and build a number of fences and the gate system/political academy of the investor Học viện Chính trị/Bộ Quốc phòng with 2 bidding package.
25/03/2025 14:59
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package Bidding package MS-16 of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: BINH MINH TECHNICAL TRADING AND PRODUCTION JOINT STOCK COMPANY
26/02/2025 15:18
Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted Tender Notice Bidding package MS-16 of the investor Học viện Chính trị/Bộ Quốc phòng with the form Competitive Offer.
10/02/2025 09:15
The Bid solicitor Học viện Chính trị/Bộ Quốc phòng has posted the results of the bidding package Bidding package TB-20 of the investor Học viện Chính trị/Bộ Quốc phòng.
- Winning bidder: HA NOI FINE ART AND CONSTRUCTION INVESTMENT CONSULTING JOINT STOCK COMPANY
06/02/2025 17:09
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Học viện Chính trị/Bộ Quốc phòng is the investor of 13 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Học viện Chính trị/Bộ Quốc phòng is the owner of 14 contractor selection plan. In which, they self-invite 13 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Học viện Chính trị/Bộ Quốc phòng is the investor of 42 package, of which 42 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Học viện Chính trị/Bộ Quốc phòng is the owner of 53 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: The investor Học viện Chính trị/Bộ Quốc phòng has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Học viện Chính trị/Bộ Quốc phòng is an investor with 41 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.