Data analysis results of DauThau.info software for project owners Khu Quản lý đường bộ I as follows:
- Has relationships with 4 bid solicitors.
- Has relationships with 397 contractors.
- Announced 325 development investment project, of which 73 projects that have not announced the contractor selection plan.
- Announced 784 contractor selection plans with a total of 2095 bidding packages, of which 18 prequalification documents have not found the investment project
- Has invited bids for 701 packages (with 867 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 438 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 128 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1273 packages that have not fully posted the contractor selection results. Of these 1220 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.85 contractors.
- Breakdown by bidding field: Goods 1.71%, Construction 73.29%, Consultancy 20.55%, Non-consultancy 4.34%, Mixed 0.11%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,041,818,832,235 VND, of which the total winning bid value is: 1,889,819,388,994 VND.
- The savings rate is: 7.44%.
Data analysis results of DauThau.info software for project owners Khu Quản lý đường bộ I as follows:
- Has relationships with 397 contractors.
- The average number of contractors participating in each bidding package is: 1.85 contractors.
- Proportion of bidding fields: Goods 1.71%, Construction 73.29%, Consulting 20.55%, Non-consulting 4.34%, Mixed 0.11%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,041,818,832,235 VND, in which the total winning value is: 1,889,819,388,994 VND.
- The savings rate is: 7.44%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 03: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
06/01/2026 18:55
The Bid solicitor Khu Quản lý đường bộ I has posted the results of the bidding package Construction of the investor Khu Quản lý đường bộ I.
- Winning bidder: 898 CONSTRUCTION JOINT STOCK COMPANY
06/01/2026 16:56
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 3: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
31/12/2025 17:40
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 3: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
31/12/2025 15:37
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 03:
Construction
erect of the investor Khu Quản lý đường bộ I with the form Open bidding.
31/12/2025 11:26
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 5: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
31/12/2025 08:03
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
30/12/2025 17:49
The Bid solicitor Khu Quản lý đường bộ I has posted the request Supplementing the project contractor selection plan: Repairing damage to the foundation, road surface and traffic safety system section: Km236+661 - Km239+000; Km258+950 - Km259+200, Km260+400 - Km261+500; Km264+000 - Km269+000; Repairing the longitudinal trench system, reinforcing the shoulder, adding and raising the corrugated iron guardrail, completing the traffic safety system at section Km217+700 - Km270+000 National Highway 3 (coincident with Ho Chi Minh Highway) of the investor Khu Quản lý đường bộ I with 4 bidding package.
29/12/2025 18:12
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 03: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
27/12/2025 15:43
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 03: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
26/12/2025 17:49
The data sheet has been partially hidden, to see the full information please Login or Register
Khu Quản lý đường bộ I publishes the plan Handling the risk of traffic safety at km0+900 - km1+250 QL.15, Hoa Binh province with 3 bidding package .
29/11/2025 10:38
Khu Quản lý đường bộ I announced the results of the bid package Construction supervision .
- Winning bidder: Trung tâm Kỹ thuật đường bộ 1
29/11/2025 10:32
Khu Quản lý đường bộ I announced the results of the bid package Audit .
- Winning bidder: CENTRAL AUDITING AND VALUATION COMPANY LIMITED
25/11/2025 10:37
Khu Quản lý đường bộ I publishes the plan Complete repair of traffic safety system, section Km438-Km503, Ho Chi Minh Road, Hoa Binh province with 3 bidding package .
25/11/2025 10:34
Khu Quản lý đường bộ I announced the results of the bid package Package number 03: Project audit .
- Winning bidder: VFA AUDITING COMPANY LIMITED
25/11/2025 10:29
Khu Quản lý đường bộ I publishes the plan Repairing local road surface damage at sections Km262+020-Km262+236(T), Km262+457-Km262+700, Km259+805-Km259+909(P), Km261+140-Km261+430(P), Km262+020-Km262+236(P), Highway 1, Ninh Binh province. with 3 bidding package .
25/11/2025 10:15
Khu Quản lý đường bộ I announced the results of the bid package Package number 03: Project audit .
- Winning bidder: VFA AUDITING COMPANY LIMITED
24/11/2025 17:40
Khu Quản lý đường bộ I publishes the plan Repairing local road surface damage at sections Km251+420-Km251+789(PT), Km251+924.5-Km252+186(PT), Km252+643.4-Km253+00(PT), Km253+388-Km253+415(PT), Km253+681.8-Km253+704(PT), Km253+724-Km253+812.4(PT), Km254+339-Km254+419(PT), Km251+100-Km251+151(TT), Km251+439-Km251+910.3(TT), Km252+35.6-Km252+111(TT), Km252+247.5-Km252+475.3(TT), Km252+581-Km252+597(TT), Km252+690-Km252+725.4(TT), Km252+924.2-Km253+057.2(TT), Km253+284-Km253+470.4(TT), Km253+482.4-Km253+626.4(TT), Km253+632.4-Km253+667.9(TT), Km253+762-Km254+285.2(TT), Km254+340-Km254+380(TT), Km254+419-Km254+626.7(TT), Km254+661.7-Km254+903(TT), National Highway 1, Ninh Binh province with 3 bidding package .
24/11/2025 17:36
Khu Quản lý đường bộ I announced the results of the bid package Package number 03: Project audit .
- Winning bidder: CENTRAL AUDITING AND VALUATION COMPANY LIMITED
24/11/2025 17:32
Khu Quản lý đường bộ I publishes the plan Repair of Xuan Him bridge Km456+104, Bong Bac II bridge Km475+170, Song Be bridge Km498+111, Ho Chi Minh road, Hoa Binh province with 3 bidding package .
24/11/2025 17:28
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 03: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
06/01/2026 18:55
The Bid solicitor Khu Quản lý đường bộ I has posted the results of the bidding package Construction of the investor Khu Quản lý đường bộ I.
- Winning bidder: 898 CONSTRUCTION JOINT STOCK COMPANY
06/01/2026 16:56
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 3: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
31/12/2025 17:40
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 3: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
31/12/2025 15:37
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 03:
Construction
erect of the investor Khu Quản lý đường bộ I with the form Open bidding.
31/12/2025 11:26
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 5: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
31/12/2025 08:03
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
30/12/2025 17:49
The Bid solicitor Khu Quản lý đường bộ I has posted the request Supplementing the project contractor selection plan: Repairing damage to the foundation, road surface and traffic safety system section: Km236+661 - Km239+000; Km258+950 - Km259+200, Km260+400 - Km261+500; Km264+000 - Km269+000; Repairing the longitudinal trench system, reinforcing the shoulder, adding and raising the corrugated iron guardrail, completing the traffic safety system at section Km217+700 - Km270+000 National Highway 3 (coincident with Ho Chi Minh Highway) of the investor Khu Quản lý đường bộ I with 4 bidding package.
29/12/2025 18:12
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 03: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
27/12/2025 15:43
Bid solicitor Khu Quản lý đường bộ I has posted Tender Notice Tender package No 03: Construction of the investor Khu Quản lý đường bộ I with the form Open bidding.
26/12/2025 17:49
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Khu Quản lý đường bộ I is the investor of 325 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Khu Quản lý đường bộ I is the owner of 784 contractor selection plan. In which, they self-invite 292 of contractor selection plan, other units invite bids of 492 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Khu Quản lý đường bộ I is the investor of 867 package, of which 147 package is self-invited, other units invite bid 720 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Khu Quản lý đường bộ I is the owner of 438 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Khu Quản lý đường bộ I has a relationship with 4 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Khu Quản lý đường bộ I is an investor with 397 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.