Data analysis results of DauThau.info software for project owners Trường Mầm Non 1 as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 23 contractors.
- Announced 1 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 12 contractor selection plans with a total of 31 bidding packages, of which 12 prequalification documents have not found the investment project
- Has invited bids for 2 packages (with 2 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 23 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 21 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 17 packages that have not fully posted the contractor selection results. Of these 17 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 6,913,817,282 VND, of which the total winning bid value is: 6,904,091,810 VND.
- The savings rate is: 0.14%.
Data analysis results of DauThau.info software for project owners Trường Mầm Non 1 as follows:
- Has relationships with 23 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 6,913,817,282 VND, in which the total winning value is: 6,904,091,810 VND.
- The savings rate is: 0.14%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Trường Mầm Non 1 has posted the request equipment shopping of the investor Trường Mầm Non 1 with 1 bidding package.
02/08/2026 16:55
The Bid solicitor Trường Mầm Non 1 has posted the request Approve the contractor selection plan for the preparation phase of the Project: Renovating and repairing gates, upgrading roofs and restrooms at Kindergarten 1 branch of the investor Trường Mầm Non 1 with 2 bidding package.
29/06/2026 16:45
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Package No. 4: Construction supervision + installation of construction equipment Repair, renovation and equipment of fire prevention system at Kindergarten 1 (Main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat). of the investor Trường Mầm Non 1.
- Winning bidder: PHUONGNAM GROUP CONSTRUCTION INVESTMENT CO., LTD
04/05/2026 13:49
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Package No. 3: Construction + construction equipment Repair, renovation and equipment of fire prevention system at Kindergarten 1 (Main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat). of the investor Trường Mầm Non 1.
- Winning bidder: MAI THANH TAN LIMITED COMPANY
04/05/2026 10:09
Bid solicitor Trường Mầm Non 1 has posted Tender Notice Tender package No 3: Construction + construction equipment Repair, renovation and equipment of fire prevention system at Kindergarten 1 (Main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat). of the investor Trường Mầm Non 1 with the form Open bidding.
07/04/2026 08:41
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Appraisal of bidding documents and contractor selection results Project: Repair, renovation and equipment of fire prevention system at Kindergarten 1 (main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat). of the investor Trường Mầm Non 1.
- Winning bidder: HYDRAULIC TRAFFIC ENGINEERING CONSULTANT JOINT - STOCK COMPANY OF LAM DONG PROVINCE
01/04/2026 16:27
The Bid solicitor Trường Mầm Non 1 has posted the request Contractor selection plan for project preparation phase Project: Repair, renovate and equip fire prevention system at Kindergarten 1 (Main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat) of the investor Trường Mầm Non 1 with 4 bidding package.
01/04/2026 16:25
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Package No. 1: Project management consulting for repairing, renovating and equipping the fire prevention system at Kindergarten 1 (main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat). of the investor Trường Mầm Non 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG A.S.T TÂY NGUYÊN
01/04/2026 16:19
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Package No. 2: Appraisal of the project of repairing, renovating and equipping the fire prevention system at Kindergarten 1 (main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat) of the investor Trường Mầm Non 1.
- Winning bidder: EAST ASIA APPRAISAL SERVICE INVESTMENT COMPANY LIMITED
26/03/2026 14:10
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Package No. 01: Consulting on preparing economic and technical reports for the project of repairing, renovating and equipping the fire prevention system at Kindergarten 1 (main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat) of the investor Trường Mầm Non 1.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG TỔNG HỢP HOÀNG PHÚC ANH
26/03/2026 14:06
The data sheet has been partially hidden, to see the full information please Login or Register
Trường Mầm Non 1 announced the results of the bid package Shopping for rice cabinets, swinging swing, horizontal climbing .
- Winning bidder: VIET TECH TECHNOLOGY COMPANY LIMITED
23/05/2025 09:13
Trường Mầm Non 1 publishes the plan Shopping for rice cabinets, swinging swing, horizontal climbing with 1 bidding package .
21/05/2025 17:56
Trường Mầm Non 1 announced the results of the bid package Package No. 01: Construction and repair of classroom blocks (main point To Ngoc Van); Repair classrooms (Phan Dinh Phung school) .
- Winning bidder: THANH DAT PHAT CONTRUCT DESIGN CONSULTANCY COMPANY LIMITED
18/05/2025 16:24
Trường Mầm Non 1 announced the results of the bid package Bidding package No. 02: Project management consulting costs .
- Winning bidder: CÔNG TY TNHH HƯNG DŨNG LÂM ĐỒNG
18/05/2025 16:22
Trường Mầm Non 1 announced the results of the bid package Package 03: Cost of construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG TRIỀU AN
18/05/2025 16:20
Trường Mầm Non 1 publishes the plan Preschool 1; Category: Repairing classroom blocks (main points To Ngoc Van); Repair classrooms (Phan Dinh Phung school) with 3 bidding package .
16/05/2025 17:45
Trường Mầm Non 1 publishes the plan Kindergarten 1; Category: Repair of drainage system, electrical system, main school sanitary equipment with 5 bidding package .
13/12/2024 16:47
Trường Mầm Non 1 publishes the plan Buy a 2-door dish drying cabinet with 1 bidding package .
15/11/2024 15:30
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trường Mầm Non 1 has posted the request equipment shopping of the investor Trường Mầm Non 1 with 1 bidding package.
02/08/2026 16:55
The Bid solicitor Trường Mầm Non 1 has posted the request Approve the contractor selection plan for the preparation phase of the Project: Renovating and repairing gates, upgrading roofs and restrooms at Kindergarten 1 branch of the investor Trường Mầm Non 1 with 2 bidding package.
29/06/2026 16:45
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Package No. 4: Construction supervision + installation of construction equipment Repair, renovation and equipment of fire prevention system at Kindergarten 1 (Main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat). of the investor Trường Mầm Non 1.
- Winning bidder: PHUONGNAM GROUP CONSTRUCTION INVESTMENT CO., LTD
04/05/2026 13:49
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Package No. 3: Construction + construction equipment Repair, renovation and equipment of fire prevention system at Kindergarten 1 (Main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat). of the investor Trường Mầm Non 1.
- Winning bidder: MAI THANH TAN LIMITED COMPANY
04/05/2026 10:09
Bid solicitor Trường Mầm Non 1 has posted Tender Notice Tender package No 3: Construction + construction equipment Repair, renovation and equipment of fire prevention system at Kindergarten 1 (Main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat). of the investor Trường Mầm Non 1 with the form Open bidding.
07/04/2026 08:41
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Appraisal of bidding documents and contractor selection results Project: Repair, renovation and equipment of fire prevention system at Kindergarten 1 (main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat). of the investor Trường Mầm Non 1.
- Winning bidder: HYDRAULIC TRAFFIC ENGINEERING CONSULTANT JOINT - STOCK COMPANY OF LAM DONG PROVINCE
01/04/2026 16:27
The Bid solicitor Trường Mầm Non 1 has posted the request Contractor selection plan for project preparation phase Project: Repair, renovate and equip fire prevention system at Kindergarten 1 (Main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat) of the investor Trường Mầm Non 1 with 4 bidding package.
01/04/2026 16:25
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Package No. 1: Project management consulting for repairing, renovating and equipping the fire prevention system at Kindergarten 1 (main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat). of the investor Trường Mầm Non 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG A.S.T TÂY NGUYÊN
01/04/2026 16:19
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Package No. 2: Appraisal of the project of repairing, renovating and equipping the fire prevention system at Kindergarten 1 (main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat) of the investor Trường Mầm Non 1.
- Winning bidder: EAST ASIA APPRAISAL SERVICE INVESTMENT COMPANY LIMITED
26/03/2026 14:10
The Bid solicitor Trường Mầm Non 1 has posted the results of the bidding package Package No. 01: Consulting on preparing economic and technical reports for the project of repairing, renovating and equipping the fire prevention system at Kindergarten 1 (main school on To Ngoc Van street and school site on Phan Dinh Phung street, Xuan Huong ward - Da Lat) of the investor Trường Mầm Non 1.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG TỔNG HỢP HOÀNG PHÚC ANH
26/03/2026 14:06
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường Mầm Non 1 is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor Trường Mầm Non 1 is the owner of 12 contractor selection plan. In which, they self-invite 4 of contractor selection plan, other units invite bids of 8 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor Trường Mầm Non 1 is the investor of 2 package, of which 0 package is self-invited, other units invite bid 2 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường Mầm Non 1 is the owner of 23 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor Trường Mầm Non 1 has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trường Mầm Non 1 is an investor with 23 contractor. The data sheet has been partially hidden, to see the full information please Login or Register