Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners UBND XÃ THUẬN HÒA as follows:
- Has relationships with 1 bid solicitors.
- Has relationships with 34 contractors.
- Announced 26 development investment project, of which 0 projects that have not announced the contractor selection plan.
- Announced 30 contractor selection plans with a total of 102 bidding packages, of which 12 prequalification documents have not found the investment project
- Has invited bids for 8 packages (with 9 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 157 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 149 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 13 packages that have not fully posted the contractor selection results. Of these 13 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 88.89%, Consultancy 11.11%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 21,726,345,257 VND, of which the total winning bid value is: 20,273,545,893 VND.
- The savings rate is: 6.69%.
Data analysis results of DauThau.info software for project owners UBND XÃ THUẬN HÒA as follows:
- Has relationships with 34 contractors.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 88.89%, Consulting 11.11%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 21,726,345,257 VND, in which the total winning value is: 20,273,545,893 VND.
- The savings rate is: 6.69%.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 03: Consulting to verify the design of construction drawings and construction estimates of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
28/06/2025 10:42
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 02: Survey consultancy and Economic Report on technical investment in construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pumping Station of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:41
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 01: Advice on management of investment projects on construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pump Station of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:39
The Bid solicitor UBND XÃ THUẬN HÒA has posted the request Plan for contractor selection phase Preparation of project investment: Repair asphalt from Tra Kim Bridge to Soc Chua Pump Station of the investor UBND XÃ THUẬN HÒA with 3 bidding package.
28/06/2025 10:38
UBND XÃ THUẬN HÒA Posted Development Investment Project Repair of asphalt from Tra Kim Bridge to Soc Chua Pump Station.
28/06/2025 10:10
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 04: Consultancy and verification of construction drawing design and construction cost estimate of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
24/04/2025 08:11
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 03: Consulting on preparing economic and technical reports for investment in construction projects of the investor UBND XÃ THUẬN HÒA.
24/04/2025 08:10
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 02: Construction survey consultancy of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:08
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 01: Advice on management of construction investment projects for construction investment works of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:07
The Bid solicitor UBND XÃ THUẬN HÒA has posted the request The contractor selection plan for the preparation of investment in the repair of asphalt and roads of Thuy Hoa hamlet, No Cong, Thuan Hiep of the investor UBND XÃ THUẬN HÒA with 4 bidding package.
24/04/2025 08:05
The data sheet has been partially hidden, to see the full information please Login or Register
UBND XÃ THUẬN HÒA announced the results of the bid package Package No. 03: Consulting to verify the design of construction drawings and construction estimates .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
28/06/2025 10:42
UBND XÃ THUẬN HÒA announced the results of the bid package Package No. 02: Survey consultancy and Economic Report on technical investment in construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pumping Station .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:41
UBND XÃ THUẬN HÒA announced the results of the bid package Package 01: Advice on management of investment projects on construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pump Station .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:39
UBND XÃ THUẬN HÒA publishes the plan Plan for contractor selection phase Preparation of project investment: Repair asphalt from Tra Kim Bridge to Soc Chua Pump Station with 3 bidding package .
28/06/2025 10:38
UBND XÃ THUẬN HÒA announced the results of the bid package Package 04: Consultancy and verification of construction drawing design and construction cost estimate .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
24/04/2025 08:11
UBND XÃ THUẬN HÒA announced the results of the bid package Package No. 03: Consulting on preparing economic and technical reports for investment in construction projects .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:10
UBND XÃ THUẬN HÒA announced the results of the bid package Package 02: Construction survey consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:08
UBND XÃ THUẬN HÒA announced the results of the bid package Package 01: Advice on management of construction investment projects for construction investment works .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:07
UBND XÃ THUẬN HÒA publishes the plan The contractor selection plan for the preparation of investment in the repair of asphalt and roads of Thuy Hoa hamlet, No Cong, Thuan Hiep with 4 bidding package .
24/04/2025 08:05
UBND XÃ THUẬN HÒA announced the results of the bid package Package No. 07: consultancy on appraisal of contractor selection results .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XD-TK PHÚC KHANG TRÀ VINH
24/04/2025 07:56
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 03: Consulting to verify the design of construction drawings and construction estimates of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
28/06/2025 10:42
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 02: Survey consultancy and Economic Report on technical investment in construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pumping Station of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:41
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 01: Advice on management of investment projects on construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pump Station of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:39
The Bid solicitor UBND XÃ THUẬN HÒA has posted the request Plan for contractor selection phase Preparation of project investment: Repair asphalt from Tra Kim Bridge to Soc Chua Pump Station of the investor UBND XÃ THUẬN HÒA with 3 bidding package.
28/06/2025 10:38
UBND XÃ THUẬN HÒA Posted Development Investment Project Repair of asphalt from Tra Kim Bridge to Soc Chua Pump Station.
28/06/2025 10:10
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 04: Consultancy and verification of construction drawing design and construction cost estimate of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
24/04/2025 08:11
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 03: Consulting on preparing economic and technical reports for investment in construction projects of the investor UBND XÃ THUẬN HÒA.
24/04/2025 08:10
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 02: Construction survey consultancy of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:08
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 01: Advice on management of construction investment projects for construction investment works of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:07
The Bid solicitor UBND XÃ THUẬN HÒA has posted the request The contractor selection plan for the preparation of investment in the repair of asphalt and roads of Thuy Hoa hamlet, No Cong, Thuan Hiep of the investor UBND XÃ THUẬN HÒA with 4 bidding package.
24/04/2025 08:05
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND XÃ THUẬN HÒA is the investor of 26 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor UBND XÃ THUẬN HÒA is the owner of 30 contractor selection plan. In which, they self-invite 30 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor UBND XÃ THUẬN HÒA is the investor of 9 package, of which 0 package is self-invited, other units invite bid 9 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND XÃ THUẬN HÒA is the owner of 157 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor UBND XÃ THUẬN HÒA has a relationship with 1 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND XÃ THUẬN HÒA is an investor with 34 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.