Data analysis results of DauThau.info software for project owners X61 Factory as follows:
- Has relationships with 2 bid solicitors.
- Has relationships with 161 contractors.
- Announced 6 development investment project, of which 3 projects that have not announced the contractor selection plan.
- Announced 267 contractor selection plans with a total of 538 bidding packages, of which 263 prequalification documents have not found the investment project
- Has invited bids for 413 packages (with 443 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 522 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 131 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 39 packages that have not fully posted the contractor selection results. Of these 21 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.04 contractors.
- Breakdown by bidding field: Goods 98.19%, Construction 1.81%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 840,519,356,075 VND, of which the total winning bid value is: 839,912,666,895 VND.
- The savings rate is: 0.07%.
Data analysis results of DauThau.info software for project owners X61 Factory as follows:
- Has relationships with 161 contractors.
- The average number of contractors participating in each bidding package is: 1.04 contractors.
- Proportion of bidding fields: Goods 98.19%, Construction 1.81%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 840,519,356,075 VND, in which the total winning value is: 839,912,666,895 VND.
- The savings rate is: 0.07%.
You need to Login or Sign up to view all informations.
- Participated in 31 bidding packages, of which 30 were won, 0 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 84.96% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.21% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (11), Bắc Ninh (1), Đà Nẵng (1), Phú Thọ (1), Undefined (18)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (11), Bắc Giang (1), Đà Nẵng (1), Undefined (18)
- Has relationships with 12 Bid Solicitors
- Has relationships with 9 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 32 bidding packages with 3 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor X61 Factory has posted the results of the bidding package MS-88: Purchasing materials and chemicals of the investor X61 Factory.
- Winning bidder: Hộ Kinh doanh Phùng Văn Tuấn
26/08/2026 09:59
The Bid solicitor X61 Factory has posted the results of the bidding package MS-87: Purchasing supplies of the investor X61 Factory.
- Winning bidder: Hộ kinh doanh Văn Du
26/08/2026 09:53
The Bid solicitor X61 Factory has posted the results of the bidding package MS-86: Purchasing supplies of the investor X61 Factory.
- Winning bidder: HỘ KINH DOANH TỔNG HỢP LUYỆN NGUYỄN
26/08/2026 09:45
The Bid solicitor X61 Factory has posted the results of the bidding package MS-85: Purchasing supplies of the investor X61 Factory.
- Winning bidder: HỘ KINH DOANH TMDV MINH PHƯƠNG
26/08/2026 09:44
The Bid solicitor X61 Factory has posted the request Evaluation of equipment costs as part of the 2026 Technology Equipment Procurement Plan of the investor X61 Factory with 1 bidding package.
26/08/2026 09:04
The Bid solicitor X61 Factory has posted the results of the bidding package MS-95: Purchasing of materials and spare parts of the investor X61 Factory.
- Winning bidder: Hộ kinh doanh Hoàng Viết Tiến
22/08/2026 10:02
The Bid solicitor X61 Factory has posted the request Purchase of goods (No. 107) in 2026 of the investor X61 Factory with 1 bidding package.
21/08/2026 09:22
The Bid solicitor X61 Factory has posted the results of the bidding package MS-91: Purchasing chemicals of the investor X61 Factory.
- Winning bidder: Hộ Kinh doanh Phùng Văn Tuấn
13/08/2026 16:02
The Bid solicitor X61 Factory has posted the results of the bidding package MS-96: Purchasing gasoline and oil of the investor X61 Factory.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ VẬT LIỆU XÂY DỰNG KHÁNH TÍN
12/08/2026 11:03
The Bid solicitor X61 Factory has posted the results of the bidding package MS-47: Buy diesel of the investor X61 Factory.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ VẬT LIỆU XÂY DỰNG KHÁNH TÍN
11/08/2026 10:32
The data sheet has been partially hidden, to see the full information please Login or Register
X61 Factory announced the results of the bid package Bidding Package TV-04 .
- Winning bidder: MINH LONG ARCHITECTURE AND INTERIOR COMPANY LIMITED
10/09/2025 10:38
X61 Factory announced the results of the bid package Bidding Package TV-03 .
- Winning bidder: MINH LONG ARCHITECTURE AND INTERIOR COMPANY LIMITED
11/08/2025 15:40
X61 Factory publishes the plan KHLCNT phase 2 works: Traditional room/factory X61 with 2 bidding package .
29/07/2025 17:02
X61 Factory announced the results of the bid package Package No. 13 .
- Winning bidder: DAI LONG COMPANY LIMITED
18/07/2025 09:30
X61 Factory announced the results of the bidding package Tender package No 13 with 1 participating contractors .
14/07/2025 08:01
X61 Factory announced the results of the bid package Package No. 15 .
- Winning bidder: HỘ KINH DOANH TỔNG HỢP NAM VIỆT
07/07/2025 15:17
X61 Factory announced the results of the bid package Package No. 14 .
- Winning bidder: HỘ KINH DOANH TẠ THỊ ĐIỆP
07/07/2025 15:16
X61 Factory announced the results of the bid package Package No. 12 .
- Winning bidder: Hộ Kinh doanh Nguyễn Huy Cường
07/07/2025 15:15
X61 Factory announced the results of the bid package Package No. 11 .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ THUỶ 001
07/07/2025 15:15
X61 Factory announced the results of the bid package Package No. 10 .
- Winning bidder: Cửa hàng kính doanh tổng hợp Nguyễn Thị Việt Nga
07/07/2025 15:14
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor X61 Factory has posted the results of the bidding package MS-88: Purchasing materials and chemicals of the investor X61 Factory.
- Winning bidder: Hộ Kinh doanh Phùng Văn Tuấn
26/08/2026 09:59
The Bid solicitor X61 Factory has posted the results of the bidding package MS-87: Purchasing supplies of the investor X61 Factory.
- Winning bidder: Hộ kinh doanh Văn Du
26/08/2026 09:53
The Bid solicitor X61 Factory has posted the results of the bidding package MS-86: Purchasing supplies of the investor X61 Factory.
- Winning bidder: HỘ KINH DOANH TỔNG HỢP LUYỆN NGUYỄN
26/08/2026 09:45
The Bid solicitor X61 Factory has posted the results of the bidding package MS-85: Purchasing supplies of the investor X61 Factory.
- Winning bidder: HỘ KINH DOANH TMDV MINH PHƯƠNG
26/08/2026 09:44
The Bid solicitor X61 Factory has posted the request Evaluation of equipment costs as part of the 2026 Technology Equipment Procurement Plan of the investor X61 Factory with 1 bidding package.
26/08/2026 09:04
The Bid solicitor X61 Factory has posted the results of the bidding package MS-95: Purchasing of materials and spare parts of the investor X61 Factory.
- Winning bidder: Hộ kinh doanh Hoàng Viết Tiến
22/08/2026 10:02
The Bid solicitor X61 Factory has posted the request Purchase of goods (No. 107) in 2026 of the investor X61 Factory with 1 bidding package.
21/08/2026 09:22
The Bid solicitor X61 Factory has posted the results of the bidding package MS-91: Purchasing chemicals of the investor X61 Factory.
- Winning bidder: Hộ Kinh doanh Phùng Văn Tuấn
13/08/2026 16:02
The Bid solicitor X61 Factory has posted the results of the bidding package MS-96: Purchasing gasoline and oil of the investor X61 Factory.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ VẬT LIỆU XÂY DỰNG KHÁNH TÍN
12/08/2026 11:03
The Bid solicitor X61 Factory has posted the results of the bidding package MS-47: Buy diesel of the investor X61 Factory.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ VẬT LIỆU XÂY DỰNG KHÁNH TÍN
11/08/2026 10:32
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor X61 Factory is the investor of 6 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor X61 Factory is the owner of 267 contractor selection plan. In which, they self-invite 202 of contractor selection plan, other units invite bids of 65 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor X61 Factory is the investor of 443 package, of which 397 package is self-invited, other units invite bid 46 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor X61 Factory is the owner of 522 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor X61 Factory has a relationship with 2 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor X61 Factory is an investor with 161 contractor. The data sheet has been partially hidden, to see the full information please Login or Register