CÔNG TY CỔ PHẦN KIẾN TRÚC HIGHEND

Found: 23:12 21/06/2021
Certificate of Capacity in construction
00001521
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address (after merge)
Tầng 8, tòa nhà Báo Tiền Phong, số 15 Hồ Xuân Hương
Moderator
Address (before merger)
Tầng 8, tòa nhà Báo Tiền Phong, số 15 Hồ Xuân Hương, phường Nguyễn Du, quận Hai Bà Trưng, thành phố Hà Nội
Representative
Nguyễn Anh Tuấn  
Position
Tổng Giám đốc
Tax code/ Establish decision no.
0104026299
Certification date
11/06/2009
Granting agencies
Sở kế hoạch đầu tư thành phố Hà Nội

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
BXD-00001521
Lập quy hoạch xây dựng

III
24/05/2022
3
BXD-00001521
Thiết kế, thẩm tra thiết kế xây dựng công trình
Thiết kế xây dựng công trình Hạ tầng kỹ thuật
III
24/05/2022
4
BXD-00001521
Thiết kế, thẩm tra thiết kế xây dựng công trình
Dân dụng
I
24/05/2022
5
HAN-00001521
Thiết kế, thẩm tra thiết kế xây dựng công trình
Hạ tầng kỹ thuật
II
05/11/2030
6
HAN-00001521
Thiết kế, thẩm tra thiết kế xây dựng công trình
Công nghiệp Đường dây & TBA
III
05/11/2030
7
HAN-00001521
Giám sát thi công xây dựng công trình
Dân dụng
III
05/11/2030
8
HAN-00001521
Quản lý dự án đầu tư xây dựng
Dân dụng
III
05/11/2030
9
HAN-00001521
Thiết kế, thẩm tra thiết kế xây dựng công trình
Giao thông
III
05/04/2031

This construction organization is also a contractor. The results of data analysis for contractors HIGHEND ARCHITECTURE JOINT STOCK COMPANY are as follows:

  • Participated in 23 bidding packages, of which 20 were won, 2 were lost, 1 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 74.09% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 96.72% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : Hà Nội (12), Bắc Ninh (2), Đồng Nai (2), Hải Phòng (1), Thái Nguyên (1), Hưng Yên (1), Undefined (4)
  • Provinces before the merger where the contractor has participated in bidding : Hà Nội (12), Bắc Giang (2), Đồng Nai (2), Hải Dương (1), Thái Nguyên (1), Thái Bình (1), Undefined (5)
  • Has relationships with 12 Bid Solicitors
  • Has competed against 16 contractors in 8 bidding packages, won 7 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 9 contractors in 8 bidding packages, won 8 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 3 bidding packages with 3 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
You did not use the site, Click here to remain logged. Timeout: 60 second