CÔNG TY CỔ PHẦN QUẢN LÝ DỰ ÁN SENA

Found: 20:01 21/06/2021
Certificate of Capacity in construction
00015507
Province/City
Address (after merge)
Số 35 Điện Biên Phủ
Moderator
Address (before merger)
Số 35 Điện Biên Phủ, Phường Điện Biên, Quận Ba Đình, thành phố Hà Nội, Việt Nam
Representative
Đinh Hoàng Hải  
Position
Giám Đốc
Tax code/ Establish decision no.
0101602314
Certification date
11/01/2005
Granting agencies
Sở kế hoạch và đầu tư thành phố Hà Nội

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
BXD-00015507
Thi công xây dựng công trình
Dân dụng
II
28/08/2023
3
BXD-00015507
Thi công xây dựng công trình
Giao thông
III
28/08/2023
4
BXD-00015507
Thi công xây dựng công trình
Nông nghiệp và phát triển nông thôn
III
28/08/2023
5
BXD-00015507
Thi công xây dựng công trình
Hạ tầng kỹ thuật (cấp thoát nước)
I
28/08/2023
6
BXD-00015507
Giám sát thi công xây dựng công trình
Dân dụng
I
28/08/2023
7
BXD-00015507
Giám sát thi công xây dựng công trình
Công nghiệp
III
28/08/2023
8
BXD-00015507
Giám sát thi công xây dựng công trình
Giao thông (đường bộ)
II
28/08/2023
9
BXD-00015507
Giám sát thi công xây dựng công trình
Nông nghiệp và Phát triển nông thôn
III
28/08/2023
10
BXD-00015507
Giám sát thi công xây dựng công trình
Hạ tầng kỹ thuật (cấp thoát nước)
I
28/08/2023
11
HAN-00015507
Quản lý dự án đầu tư xây dựng
Dân dụng
II
25/09/2030
12
HAN-00015507
Quản lý dự án đầu tư xây dựng
Công nghiệp nhẹ
II
25/09/2030
13
HAN-00015507
Quản lý dự án đầu tư xây dựng
Hạ tầng kỹ thuật
III
25/09/2030
14
HAN-00015507
Quản lý dự án đầu tư xây dựng
Giao thông Đường bộ
II
25/09/2030
15
HAN-00015507
Giám sát thi công xây dựng công trình
Lắp đặt thiết bị công trình Dân dụng
II
25/09/2030
16
HAN-00015507
Lập quy hoạch xây dựng
Lập quy hoạch xây dựng
II
25/09/2030

This construction organization is also a contractor. The results of data analysis for contractors SENA PROJECT MANAGEMENT JOINT STOCK COMPANY are as follows:

  • Participated in 40 bidding packages, of which 36 were won, 3 were lost, 0 are pending results, and 1 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 64.62% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 98.22% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : Hà Nội (22), Thái Nguyên (2), Hải Phòng (2), Phú Thọ (2), (2), Bắc Ninh (1), Đà Nẵng (1), Quảng Trị (1), Undefined (7)
  • Provinces before the merger where the contractor has participated in bidding : Hà Nội (22), Thái Nguyên (2), Hải Dương (2), Bắc Ninh (1), Quảng Nam (1), Phú Thọ (1), Vĩnh Phúc (1), Quảng Bình (1), Undefined (9)
  • Has relationships with 23 Bid Solicitors
  • Has competed against 38 contractors in 17 bidding packages, won 13 packages, lost 3 packages, 0 are pending results, and 1 were canceled.
  • Has collaborated with 16 contractors in 12 bidding packages, won 10 packages, lost 1 packages, 0 are pending results, and 1 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 49 bidding packages with 7 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This construction organization is also the Procuring Entity. The results of data analysis for the procuring entity SENA PROJECT MANAGEMENT JOINT STOCK COMPANY are as follows:
  • Published contractor selection plan of 11 project with total 51 bidding packages.
  • Invitation for bids 16 package (with 17 bidding notice), conduct prequalification 0 package.
  • Results announced of 12 packages, cancel bids 0 packages (among the packages above).
  • Yes 2 packages with results without Tender/Prequalified notification .
DauThau.info software synthesizes and analyzes information from the national bidding database
You did not use the site, Click here to remain logged. Timeout: 60 second