| No. | Number of certificates | Category | Extended category | Rank | Expired date |
|---|---|---|---|---|---|
1 |
BXD-00007867 |
Giám sát lắp đặt thiết bị công trình |
Công nghiệp Năng lượng (Thủy Điện, Đường dây, Trạm Biến áp) |
I |
25/01/2023 |
This construction organization is also a contractor. The results of data analysis for contractors A VUONG HYDROPOWER JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 96 bidding packages, of which 72 were won, 17 were lost, 3 are pending results, and 4 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 47.6% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 85.03% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (37), Lâm Đồng (7), Gia Lai (6), Thanh Hoá (5), Quảng Trị (4), Quảng Ngãi (3), TP.Hồ Chí Minh (2), Hải Phòng (2), Đồng Nai (2), Hà Nội (1), Thái Nguyên (1), Sơn La (1), Hà Tĩnh (1), Đắk Lắk (1), Cần Thơ (1), Vĩnh Long (1), An Giang (1), Khánh Hòa (1), Undefined (24)
- Provinces before the merger where the contractor has participated in bidding : Quảng Nam (27), Đà Nẵng (9), Thanh Hoá (5), Lâm Đồng (3), Quảng Ngãi (3), Đắk Nông (3), Quảng Trị (3), Hải Phòng (2), Bình Định (2), Bà Rịa - Vũng Tàu (1), Hà Nội (1), Thái Nguyên (1), Bình Phước (1), Sơn La (1), Hà Tĩnh (1), Gia Lai (1), Phú Yên (1), Cần Thơ (1), Trà Vinh (1), An Giang (1), Bình Dương (1), Undefined (34)
- Has relationships with 26 Bid Solicitors
- Has relationships with 22 Bid Investors
- Has competed against 46 contractors in 51 bidding packages, won 32 packages, lost 17 packages, 2 are pending results, and 0 were canceled.
- Has collaborated with 11 contractors in 16 bidding packages, won 12 packages, lost 4 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 38 bidding packages with 12 roles.
blockquote>
- Published contractor selection plan of 170 project with total 452 bidding packages.
- Invitation for bids 400 package (with 426 bidding notice), conduct prequalification 0 package.
- Results announced of 461 packages, cancel bids 0 packages (among the packages above).
- Yes 100 packages with results without Tender/Prequalified notification .