Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 | BAL-00019832 | Khảo sát xây dựng | Địa hình công trình |
II | 24/06/2034 |
2 | BAL-00019832 | Khảo sát xây dựng | Địa chất công trình |
II | 24/06/2034 |
3 | BAL-00019832 | Khảo sát xây dựng | Địa hình công trình |
II | 02/03/2033 |
4 | BAL-00019832 | Khảo sát xây dựng | Địa chất công trình |
II | 02/03/2033 |
This construction organization is also a contractor. The results of data analysis for contractors CONSULTING AND CONSTRUCTION INSPECTION BAC LIEU JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 193 bidding packages, of which 183 were won, 8 were lost, 2 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 67.6% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.35% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Bạc Liêu (31), Undefined (162)
- Has relationships with 34 Bid Solicitors
- Has competed against 23 contractors in 12 bidding packages, won 3 packages, lost 8 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 3 contractors in 3 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
blockquote>
- Published contractor selection plan of 2 project with total 2 bidding packages.
- Invitation for bids 3 package (with 5 bidding notice), conduct prequalification 0 package.
- Results announced of 3 packages, cancel bids 0 packages (among the packages above).
- Yes 0 packages with results without Tender/Prequalified notification .