Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 | SOL-00057054 | Thi công xây dựng công trình | Thi công công tác xây dựng công trình công nghiệp năng lượng: Đường dây & TBA |
III | 18/08/2031 |
This construction organization is also a contractor. The results of data analysis for contractors POWER CONSTRUCTION INSTALLATION JOINT STOCK COMPANY NO4 - MIEN TRUNG are as follows:
You need to Login or Sign up to view all informations.
- Participated in 29 bidding packages, of which 21 were won, 2 were lost, 3 are pending results, and 3 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 91.56% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 90.96% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Đà Nẵng (8), Quảng Bình (8), Quảng Nam (7), Quảng Ngãi (6), Thừa Thiên - Huế (4), Quảng Trị (3), Hà Nội (2), Kon Tum (2), Khánh Hòa (1), Ninh Thuận (1), Gia Lai (1)
- Has relationships with 10 Bid Solicitors
- Has competed against 22 contractors in 17 bidding packages, won 11 packages, lost 2 packages, 2 are pending results, and 2 were canceled.
- Has collaborated with 4 contractors in 12 bidding packages, won 10 packages, lost 1 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.