Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 | HAP-00063862 | Thi công xây dựng công trình | Thi công công tác xây dựng công trình: dân dụng; nhà công nghiệp; đường bộ; cầu; thủy lợi; cấp nước - thoát nước. |
III | 18/05/2032 |
2 | HAP-00063862 | Thi công xây dựng công trình | Thi công lắp đặt thiết bị vào công trình. |
III | 18/05/2032 |
This construction organization is also a contractor. The results of data analysis for contractors YEN THO INVESTMENT CONSTRUCTION COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 13 bidding packages, of which 13 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.76% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Nam Định (8), Undefined (5)
- Has relationships with 6 Bid Solicitors
- Has competed against 4 contractors in 3 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 4 bidding packages, won 4 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.