Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 | DON-00073165 | Thi công lắp đặt thiết bị vào công trình | Thi công lắp đặt thiết bị vào công trình |
II | 24/05/2033 |
This construction organization is also a contractor. The results of data analysis for contractors NK ENGINEERING COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 25 bidding packages, of which 14 were won, 9 were lost, 1 are pending results, and 1 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 50.97% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.69% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: TP.Hồ Chí Minh (5), Tây Ninh (3), Hà Nội (2), Phú Thọ (2), Bà Rịa - Vũng Tàu (1), Bình Phước (1), Đà Nẵng (1), Hải Phòng (1), Hải Dương (1), Đồng Nai (1), Gia Lai (1), Quảng Nam (1), Undefined (5)
- Has relationships with 19 Bid Solicitors
- Has competed against 35 contractors in 15 bidding packages, won 5 packages, lost 6 packages, 3 are pending results, and 1 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.