Công ty TNHH tư vấn và xây lắp Thành Phát

Found: 22:54 05/09/2024
Certificate of Capacity in construction
00021854
Provinces/Cities (After Merger)
Provinces/Cities (Before Merger)
Address (after merge)
Số nhà 28, khu IV
Moderator
Address (before merger)
Số nhà 28, khu IV, thị trấn Hậu Lộc, huyện Hậu Lộc, tỉnh Thanh Hóa
Representative
Mai Văn Biên  
Position
Giám đốc
Tax code/ Establish decision no.
2802442711
Certification date
01/01/2001
Granting agencies
Sở Kế hoạch và Đầu tư tỉnh Thanh Hóa

Field of activity

No. Number of certificates Category Extended category Rank Expired date
1
SOL-00021854
Thi công xây dựng công trình
Thi công công tác xây dựng công trình dân dụng
III
07/12/2031
2
SOL-00021854
Thi công xây dựng công trình
Thi công công tác xây dựng công trình Giao thông: Đường bộ; Cầu
III
07/12/2031
3
SOL-00021854
Thi công xây dựng công trình
Thi công công tác xây dựng công trình hạ tầng kỹ thuật: cấp nước, thoát nước
III
07/12/2031
4
SOL-00021854
Quản lý dự án đầu tư xây dựng
Tư vấn quản lý dự án đầu tư xây dựng công trình dân dụng và hạ tầng kỹ thuật
III
07/12/2031
5
SOL-00021854
Quản lý dự án đầu tư xây dựng
Tư vấn quản lý dự án đầu tư xây dựng công trình giao thông
III
07/12/2031
6
SOL-00021854
Khảo sát xây dựng
Khảo sát địa hình
III
07/12/2031
7
SOL-00021854
Lập quy hoạch xây dựng
Lập thiết kế quy hoạch xây dựng
III
07/12/2031

This construction organization is also a contractor. The results of data analysis for contractors THANH PHAT CONSULTING AND CONSTRUCTION COMPANY LIMITED are as follows:

  • Participated in 14 bidding packages, of which 14 were won, 0 were lost, 0 are pending results, and 0 were canceled.
  • Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)

    Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.

  • Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
  • Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
  • Lowest bid rate when participating: 99.89% (Only calculated based on packages that have published estimated prices or package prices)
  • Average bid-winning price compared to the estimated price: 99.95% (Only calculated based on packages that have published estimated prices or package prices)
  • Provinces after the merger where the contractor has participated in bidding : Thanh Hoá (8), Undefined (6)
  • Provinces before the merger where the contractor has participated in bidding : Thanh Hoá (8), Undefined (6)
  • Has relationships with 4 Bid Solicitors
  • Has competed against 4 contractors in 3 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Has collaborated with 2 contractors in 3 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
  • Received 0 penalty decisions due to violations of bidding regulations.
  • Participated in consulting for 46 bidding packages with 4 roles.
The DauThau.info software compiles and analyzes information from the national bidding database
You need to Login or Sign up to view all informations.
This construction organization is also the Procuring Entity. The results of data analysis for the procuring entity THANH PHAT CONSULTING AND CONSTRUCTION COMPANY LIMITED are as follows:
  • Published contractor selection plan of 26 project with total 41 bidding packages.
  • Invitation for bids 26 package (with 27 bidding notice), conduct prequalification 0 package.
  • Results announced of 6 packages, cancel bids 0 packages (among the packages above).
  • Yes 0 packages with results without Tender/Prequalified notification .