Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 | BXD-00004441 | Thiết kế, thẩm tra thiết kế xây dựng công trình | Dân dụng (công trình văn hoá) |
II | 28/09/2022 |
3 | BXD-00004441 | Giám sát thi công xây dựng công trình | Dân dụng (công trình văn hoá) |
II | 28/09/2022 |
This construction organization is also a contractor. The results of data analysis for contractors THANG LONG CULTURAL PROJECT CONSTRUCTION COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 27 bidding packages, of which 25 were won, 2 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 90.91% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.51% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Bắc Ninh (5), Hà Nội (3), Bà Rịa - Vũng Tàu (1), Trà Vinh (1), Undefined (17)
- Has relationships with 17 Bid Solicitors
- Has competed against 8 contractors in 8 bidding packages, won 6 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 6 contractors in 8 bidding packages, won 8 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.