Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
No. | Number of certificates | Category | Extended category | Rank | Expired date |
---|---|---|---|---|---|
1 | HCM-00025990 | Thi công xây dựng công trình | Dân dụng |
II | 17/04/2019 |
3 | HCM-00025990 | Thi công xây dựng công trình | Dân dụng |
II | 17/04/2029 |
4 | HCM-00025990 | Thi công xây dựng công trình | Công nghiệp |
III | 17/04/2029 |
This construction organization is also a contractor. The results of data analysis for contractors CÔNG TY TNHH XÂY DỰNG - THƯƠNG MẠI VÀ DỊCH VỤ ĐÔNG XUYÊN are as follows:
You need to Login or Sign up to view all informations.
- Participated in 8 bidding packages, of which 4 were won, 4 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 95.34% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.06% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Kiên Giang (3), Lâm Đồng (2), Bình Dương (1), Bình Phước (1), Cần Thơ (1)
- Has relationships with 5 Bid Solicitors
- Has competed against 27 contractors in 7 bidding packages, won 3 packages, lost 4 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 3 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.