Project Code
PR2300062220-02
Publishing time
11:36 07/12/2023
Name of project
Huu Nghi - Chi Lang border gate expressway under BOT form
Project List announced Entity
Domestic/ International
Domestic
Amount in words
Eleven trillion one hundred seventy nine billion dong
Project capital structure
Stage phân kỳ:
- Investor's Equity (VND): 1.124.000.000.000
- Loans and other legal capital sources of the Investor (VND): 4.496.000.000.000
- State capital in the project (if any) (VND): 5.000.000.000.000
Area of land used for the project
Land use demand is about 823.95 hectares
Investment Objectives of the Project
The Huu Nghi - Chi Lang border gate expressway project is invested and built to complete synchronous and modern traffic infrastructure; connecting with Dong Dang - Tra Linh expressway, which has been approved by the Prime Minister for investment policy; meet the transportation needs of Lang Son province in particular, the Northeast region and the whole country in general; Gradually complete the planning of Vietnam's highway traffic network for the period 2021-2030.
The completed route will be an important bridge of the economic corridor Nan Ninh - Lang Son - Hai Phong - Quang Ninh, aiming to create a trans-Asia economic corridor, creating an advantage for Vietnam to be a gateway for trade exchange. with China and Southeast Asia; contributing to linking and rapidly developing key economic sectors of Lang Son province such as industry, tourism, services, import and export of goods; Promote the development of Dong Dang - Lang Son border gate economic zone, creating motivation for Lang Son province to develop rapidly and sustainably socio-economically, becoming one of the growth poles and economic center of the Central region. Northern tourist and mountainous areas.
Investment Scale of the Project
- Huu Nghi - Chi Lang border gate expressway has a length of about 43km, designed with 6 motor vehicle lanes, roadbed width Bn=32.25m; The route connecting Tan Thanh border gate and Coc Nam border gate is about 17km long and is designed with 4 motor vehicle lanes, roadbed width Base = 22m.
- Project scale is divided into 2 specific phases as follows:
Divergence phase:
- Huu Nghi - Chi Lang border gate expressway: invest in building the route with a scale of 4 lanes, roadbed width = 17m.
- Route connecting Tan Thanh border gate and Coc Nam border gate: investment and construction on a scale of 2 lanes, roadbed width = 14.5m.
Complete stage:
- Huu Nghi - Chi Lang border gate expressway: complete the cross-section scale of the route with 6 lanes for motor vehicles, roadbed width Base = 32.25m.
- Route connecting Tan Thanh border gate and Coc Nam border gate: complete the connection route with 4 motor vehicle lanes, roadbed width Bben = 22m.
Project location
Chi Lang District, Lang Son Province; Van Lang District, Lang Son Province; Lang Son City, Lang Son Province; Cao Loc District, Lang Son Province
Contact information for the Bid solicitor
Ban Quản lý dự án đầu tư xây dựng tỉnh Lạng Sơn
Email:
Assignment time: 07/12/2023
Assignment status: Assigned
Mechanism for sharing revenue increases and decreases
Have
- This project applies the revenue sharing mechanism as prescribed in Clause 1, Article 82 of the PPP Law.
- The project does not apply a mechanism to share the reduced revenue compared to the project's financial plan.
Name of competent authority
Sở Kế hoạch và Đầu tư tỉnh Lạng Sơn
Address: No. 2 Hoang Van Thu - Chi Lang Ward - Lang Son City - Lang Son Province, Chi Lang Ward, Lang Son City, Lang Son Province
Phone number: 02053812084
Fax:
Contracting agency
Ủy ban nhân dân tỉnh Lạng Sơn
Address: No. 02 Hung Vuong Street, Chi Lang Ward, Lang Son City
Phone number: (0205) 3.812.605
Fax: (0205) 3.812.336
Time to start organizing investor selection
Quarter I/2024
Name of the investor proposing the project
Công ty Cổ phần Tập đoàn Đèo Cả
Project to apply for Contractor Appointment / Investor Selection in special cases
Are not
Form of investor selection
Open bidding
Attached files
To view full information, please
Login or
Register
Profile files downloaded directly from the link of the National Procurement System (not the VIP Link) will be blocked from downloading on Chrome browsers. Please see more instructions on downloading files when blocked here .
Decision number
2014/QĐ-UBND
Ngày quyết định
16:59 04/12/2023
Decision Agency
Ủy ban nhân tỉnh Lạng Sơn
Amendment decision
File can only be downloaded on Windows computers using Agent!
General information of the Bid solicitor
Number |
Name of the Bid solicitor |
Email |
Assignment time |
Assignment status |
1 |
Ban Quản lý dự án đầu tư xây dựng tỉnh Lạng Sơn |
|
07/12/2023 |
Assigned |
Link list
Number |
Prequalification Notice/Tender ID |
Status |
1 |
IB2400010230 |
Published |
Investment policy code
IP2300000001-00
Created date
15:51 06/01/2023
Name of project
Huu Nghi - Chi Lang border gate expressway under BOT form
Project Type
Project proposed by investor
New technology/high-tech project
Are not
Project with special elements
Are not
Projects in industries and occupations that have not yet been marketed to foreign investors
Are not
Authority to decide investment policy
The project falls under the authority to decide investment policies of the Provincial People's Council
Project implementation time
3 years
Investment Objectives of the Project
The Huu Nghi - Chi Lang border gate expressway project is invested and built to complete synchronous and modern traffic infrastructure; connecting with Dong Dang - Tra Linh expressway, which has been approved by the Prime Minister for investment policy; meet the transportation needs of Lang Son province in particular, the Northeast region and the whole country in general; Gradually complete the planning of Vietnam's highway traffic network for the period 2021-2030.
The completed route will be an important bridge of the economic corridor Nan Ninh - Lang Son - Hai Phong - Quang Ninh, aiming to create a trans-Asia economic corridor, creating an advantage for Vietnam to be a gateway for trade exchange. with China and Southeast Asia; contributing to linking and rapidly developing key economic sectors of Lang Son province such as industry, tourism, services, import and export of goods; Promote the development of Dong Dang - Lang Son border gate economic zone, creating motivation for Lang Son province to develop rapidly and sustainably socio-economically, becoming one of the growth poles and economic center of the Central region. Northern tourist and mountainous areas.
Investment Scale of the Project
- Huu Nghi - Chi Lang border gate expressway has a length of about 43km, designed with 6 motor vehicle lanes, roadbed width Bn=32.25m; The route connecting Tan Thanh border gate and Coc Nam border gate is about 17km long and is designed with 4 motor vehicle lanes, roadbed width Base = 22m.
- Project scale is divided into 2 specific phases as follows:
Divergence phase:
- Huu Nghi - Chi Lang border gate expressway: invest in building the route with a scale of 4 lanes, roadbed width = 17m.
- Route connecting Tan Thanh border gate and Coc Nam border gate: investment and construction on a scale of 2 lanes, roadbed width = 14.5m.
Complete stage:
- Huu Nghi - Chi Lang border gate expressway: complete the cross-section scale of the route with 6 lanes for motor vehicles, roadbed width Base = 32.25m.
- Route connecting Tan Thanh border gate and Coc Nam border gate: complete the connection route with 4 motor vehicle lanes, roadbed width Bben = 22m.
Project location
Chi Lang District, Lang Son Province; Van Lang District, Lang Son Province; Lang Son City, Lang Son Province; Cao Loc District, Lang Son Province
Used ground and water surface area; need to use other resources (if any)
Land use demand is about 823.95 hectares
Preliminary total investment
10.620.000.000.000 VND
Amount in words
Ten trillion six hundred twenty billion dong
Project capital structure
Stage phân kỳ:
- Investor's Equity (VND): 1.124.000.000.000
- Loans and other legal capital sources of the Investor (VND): 4.496.000.000.000
- State capital in the project (if any) (VND): 5.000.000.000.000
Expected price range, fees for products and public services for projects applying a direct fee collection mechanism from users
Incentives, investment guarantees
Mechanism for sharing revenue increases and decreases
Have
- This project applies the revenue sharing mechanism as prescribed in Clause 1, Article 82 of the PPP Law.
- The project does not apply a mechanism to share the reduced revenue compared to the project's financial plan.
Competent state agency
Department of Planning and Investment of Lang Son province
Project preparation unit name
vn4900222281 Sở Kế hoạch và Đầu tư tỉnh Lạng Sơn
Name of the investor proposing the project
Công ty Cổ phần Tập đoàn Đèo Cả
Decision number
41/NQ-HĐND
Approval date
16:59 30/12/2022
Decision-making agency
Hội đồng nhân dân tỉnh Lạng Sơn