Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for project owners PMU2 as follows:
- Has relationships with 3 bid solicitors.
- Has relationships with 154 contractors.
- Announced 9 development investment project, of which 1 projects that have not announced the contractor selection plan.
- Announced 51 contractor selection plans with a total of 72 bidding packages, of which 6 prequalification documents have not found the investment project
- Has invited bids for 47 packages (with 70 tender notices), conducted prequalification for 0 packages.
- Published 0 quotation requests.
- Announced the results of 81 packages, and canceled bids for 0 packages (among the packages mentioned above).
- There are 36 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 9 packages that have not fully posted the contractor selection results. Of these 9 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 4.00 contractors.
- Breakdown by bidding field: Goods 8.57%, Construction 21.43%, Consultancy 57.14%, Non-consultancy 12.86%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 15,442,918,234,950 VND, of which the total winning bid value is: 14,483,534,941,813 VND.
- The savings rate is: 6.21%.
Data analysis results of DauThau.info software for project owners PMU2 as follows:
- Has relationships with 154 contractors.
- The average number of contractors participating in each bidding package is: 4.00 contractors.
- Proportion of bidding fields: Goods 8.57%, Construction 21.43%, Consulting 57.14%, Non-consulting 12.86%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 15,442,918,234,950 VND, in which the total winning value is: 14,483,534,941,813 VND.
- The savings rate is: 6.21%.
You need to Login or Sign up to view all informations.
- Participated in 1 bidding packages, of which 1 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Gia Lai (1)
- Provinces before the merger where the contractor has participated in bidding : Undefined (1)
- Has relationships with 0 Bid Solicitors
- Has relationships with 1 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor PMU2 has posted the results of the bidding package Bidding Package TV12: Construction quality accreditation advice of the investor PMU2.
- Winning bidder: Techno Science of Transport Centre
13/07/2026 08:37
The Bid solicitor PMU2 has posted the results of the bidding package Package TV-09: Consulting on traffic safety verification before putting the project into operation and use of the investor PMU2.
- Winning bidder: UTT CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY
02/06/2026 09:21
Bid solicitor PMU2 has posted Tender Notice Bidding Package TV12: Construction quality accreditation advice of the investor PMU2 with the form Open bidding.
15/05/2026 18:08
The Bid solicitor PMU2 has posted the request The decision to approve the plan to select the contractor to renovate the weak bridge and connect on the national highways (phase II) using the EDCF loan of the Korean government. of the investor PMU2 with 8 bidding package.
15/05/2026 08:54
The Bid solicitor PMU2 has posted the request The decision on the addition of the plan to select contractor projects to invest in building new market routes - Bac Kan, Bac Kan province of the investor PMU2 with 3 bidding package.
17/04/2026 14:22
The Bid solicitor PMU2 has posted the request The decision on the addition of the plan to select contractor projects to invest in building new market routes - Bac Kan, Bac Kan province of the investor PMU2 with 3 bidding package.
17/04/2026 11:26
The Bid solicitor PMU2 has posted the results of the bidding package Package TV13: Traffic safety verification advice before putting the project into exploitation and use. of the investor PMU2.
- Winning bidder: UTT CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY
02/03/2026 16:15
The Bid solicitor PMU2 has posted the request Decision approving adjustments and supplements to the contractor selection plan for the Quang Ngai - Hoai Nhon section project. of the investor PMU2 with 1 bidding package.
03/02/2026 14:47
Bid solicitor PMU2 has posted Tender Notice Package TV13: Traffic safety verification advice before putting the project into exploitation and use. of the investor PMU2 with the form Open bidding.
26/12/2025 15:56
The Bid solicitor PMU2 has posted the results of the bidding package Bidding package TV01: Survey consulting, preparation of pre-feasibility study report. of the investor PMU2.
- Winning bidder: TECCO BMT
26/12/2025 10:05
The data sheet has been partially hidden, to see the full information please Login or Register
PMU2 announced the results of the bid package Package TV-09: Consulting on traffic safety verification before putting the project into operation and use .
- Winning bidder: UTT CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY
02/06/2026 09:21
PMU2 publishes the plan The decision to approve the plan to select the contractor to renovate the weak bridge and connect on the national highways (phase II) using the EDCF loan of the Korean government. with 8 bidding package .
15/05/2026 08:54
PMU2 announced the results of the bid package Package XL-01: Construction of Dong Cao Bridge .
- Winning bidder: ILSUNG CONSTRUCTION CO., LTD, THANG LONG JOINT STOCK CORPORATION
11/12/2025 15:58
PMU2 announced the results of the bid package Bidding package XL-02: Construction of Lo Gom Bridge, Mango Garden, Day, Ba River .
- Winning bidder: HUGIA DEVELOPMENT INVESTMENT JOINT STOCK COMPANY, CÔNG TY TNHH XÂY DỰNG TRƯỜNG PHÁT LỢI, P&T CONSTRUCTION JOINT STOCK COMPANY
30/10/2025 11:31
PMU2 announced the results of the bid package Package XL04: Construction of operating houses, toll booths (including surveys and TKBVTC) .
- Winning bidder: BACH BANG COMPANY LIMITED
18/08/2025 16:06
PMU2 announced the results of the bid package TVGS04 Bidding Package: Supervision consultant for package XL04. .
- Winning bidder: CÔNG TY TNHH TƯ VẤN TỔNG HỢP VÀ XÂY DỰNG HOÀNG PHÚC, THAI SON CONSTRUCTION INVESTMENT AND TRADING JOINT STOCK COMPANY
18/08/2025 15:45
PMU2 publishes the plan The decision on the addition of the plan to select contractor projects to invest in building new market routes - Bac Kan, Bac Kan province with 3 bidding package .
08/08/2025 09:37
PMU2 announced the results of the bidding package Package XL04: Construction of operating houses, toll booths (including surveys and TKBVTC) with 3 participating contractors .
26/07/2025 09:16
PMU2 announced the results of the bidding package TVGS04 Bidding Package: Supervision consultant for package XL04. with 2 participating contractors .
18/07/2025 09:30
PMU2 publishes Tender Notice Package XL04: Construction of operating houses, toll booths (including surveys and TKBVTC) in the form Open bidding .
15/07/2025 15:55
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor PMU2 has posted the results of the bidding package Bidding Package TV12: Construction quality accreditation advice of the investor PMU2.
- Winning bidder: Techno Science of Transport Centre
13/07/2026 08:37
The Bid solicitor PMU2 has posted the results of the bidding package Package TV-09: Consulting on traffic safety verification before putting the project into operation and use of the investor PMU2.
- Winning bidder: UTT CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY
02/06/2026 09:21
Bid solicitor PMU2 has posted Tender Notice Bidding Package TV12: Construction quality accreditation advice of the investor PMU2 with the form Open bidding.
15/05/2026 18:08
The Bid solicitor PMU2 has posted the request The decision to approve the plan to select the contractor to renovate the weak bridge and connect on the national highways (phase II) using the EDCF loan of the Korean government. of the investor PMU2 with 8 bidding package.
15/05/2026 08:54
The Bid solicitor PMU2 has posted the request The decision on the addition of the plan to select contractor projects to invest in building new market routes - Bac Kan, Bac Kan province of the investor PMU2 with 3 bidding package.
17/04/2026 14:22
The Bid solicitor PMU2 has posted the request The decision on the addition of the plan to select contractor projects to invest in building new market routes - Bac Kan, Bac Kan province of the investor PMU2 with 3 bidding package.
17/04/2026 11:26
The Bid solicitor PMU2 has posted the results of the bidding package Package TV13: Traffic safety verification advice before putting the project into exploitation and use. of the investor PMU2.
- Winning bidder: UTT CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY
02/03/2026 16:15
The Bid solicitor PMU2 has posted the request Decision approving adjustments and supplements to the contractor selection plan for the Quang Ngai - Hoai Nhon section project. of the investor PMU2 with 1 bidding package.
03/02/2026 14:47
Bid solicitor PMU2 has posted Tender Notice Package TV13: Traffic safety verification advice before putting the project into exploitation and use. of the investor PMU2 with the form Open bidding.
26/12/2025 15:56
The Bid solicitor PMU2 has posted the results of the bidding package Bidding package TV01: Survey consulting, preparation of pre-feasibility study report. of the investor PMU2.
- Winning bidder: TECCO BMT
26/12/2025 10:05
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PMU2 is the investor of 9 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: Investor PMU2 is the owner of 51 contractor selection plan. In which, they self-invite 37 of contractor selection plan, other units invite bids of 14 of contractor selection plan.
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: Investor PMU2 is the investor of 70 package, of which 56 package is self-invited, other units invite bid 14 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PMU2 is the owner of 81 contractor selection result. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The investor PMU2 has a relationship with 3 procuring entities. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor PMU2 is an investor with 154 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.